• Title/Summary/Keyword: 아파트관리

Search Result 431, Processing Time 0.027 seconds

A Study on the Present Condition of the Custom-built Apartment (국내 맞춤형 아파트 적용 현황에 관한 연구)

  • Han Song-Yi;Choi Jae-Kyu;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.230-233
    • /
    • 2003
  • As the consumer's consumption standard has raised, occupants' needs for the apartment is diversified and complicated. But the existing mass housing supply method has many problems and it couldn't satisfy the dwellers' various needs and overall expected life span. In order to correspond those needs, construction firms have introduced several method, such as plus option, minus option, on-time option, change up service and so on. The custom-built apartment is more supplementary and it can reflect the consumer's needs to the apartment directly. But after running the custom-built apartment, several problems is revealed. So. in this study, I defined the general idea of the custom-built apartment and then collect the case of the custom-built apartment.

  • PDF

A Survey on the Correlation Analysis between Housing Environment and Price of Apartments (주거환경과 아파트 가격과의 상관관계 분석에 관한 연구 - 대전시의 아파트 사례를 대상으로 -)

  • Kim Dong-Hoon;Park Hun-Bae;Kim Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.344-348
    • /
    • 2004
  • The purpose of this study is the correlation analysis between housing environment and prices of apartments in Dae-Jeon city. For these purpose, selecting assessment factors to analysis correlation from housing environment classified by space stages and correlation analysis between selected factors and price of apartments. The results of this study are as follows : in old city area, a physical factors of housing environment gives high influence on the price of apartment, in new city area, density of building gives high influence on the price of apartment.

  • PDF

Time Series Analysis and Development of Forecasting Model in Apartment House Cost Using X-12 ARIMA (X-12 ARIMA를 이용한 아파트 원가의 변동분석 및 예측모델 개발)

  • Cho, Hun-Hee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.98-106
    • /
    • 2005
  • The construction cost index and the forecasting model of apartment house can be efficient for evaluating the validness of the fluctuating price, and for making guidelines for construction firms when calculating their profit. In this study the previous construction cost index of apartment house was improved, and the forecasting model based on X-12 ARIMA was developed. According to the result, during the last five years the construction cost, excluding labor expense, has risen approximately to 22.7%. And during next three years, additional 16.8% rise of construction cost is expected. Those quantitative results can be utilized for evaluating the apartment house's selling price in an indirection, and be helpful to understand the variation pattern of the price.

A Study on the Process Improvement of Budgeted Cost of Earned Value Management in Multiple Apartment Project (공정-공사비 통합 프로세스 개선을 통한 대단지 아파트 건설공사의 계획기성 산출 및 관리)

  • Yang Yong-Cheol;Kim Sang-Hee;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.123-136
    • /
    • 2003
  • In multiple apartment construction project, BCWS is a critical management factor and has a great influence on the success of the project. Due to the many apartment buildings & facilities which produce numerous activities, there are several problems in making out a time schedule of work as well as production and management of precise BCWS from the allocation of resources. In this study, actual condition survey was executed in terms of the calculation and the management of BCWS. This study propose better solutions for efficient calculation of BCWS through the analysis of the problems and standard schedule & progress curves.

Marketing Strategies of Name Brand Apartments According to the Brand Life Cycle (Brand Life Cycle에 의한 브랜드아파트의 마케팅 전략)

  • Choi, Young-Kon;Min, Kyung-Min;Ahn, Byung-Ju;Lee, Yoon-Sun;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.656-661
    • /
    • 2007
  • Breaking from the past convention, most construction firms are lotting out their apartments with their own brand names. They don't have, however, differentiated marketing strategies based on unique brand awareness. Rather, virtual absence of marketing strategies has brought about unfiltered introduction of architectural elements of the competition and excessive advertising efforts. Consequently confusion is at hand for consumers' purchase decision since they are not aware of the differences between the apartments. The purpose of this study is to make consumers have clear brand awareness by presenting appropriate brand strategies based on sound marketing theories for construction firms.

  • PDF

Development of the Space Cost Breakdown Structure(CBS) for Multi-Family Housing Projects (공공아파트 건설공사의 공간별 공사비분류체계 개발)

  • Hyun, Chang-Taek;Koo, Kyo-Jin;Yeon, Hee-Jung;Moon, Hyun-Seok;Cho, Kyu-Man;Hong, Tae-Hoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.6
    • /
    • pp.178-187
    • /
    • 2007
  • As the government has enforced recently the policies on the distribution of the housing, the construction cost of multi-family housing projects has increasingly become very sensitive and political issue. However, it is difficult to predict the construction cost in planning and design phase of the project because the Bill of Quantity of the multi-family housing projects was composed of breakdown structure based on each work package. To predict the construction cost in planning and design phase for multi-family housing projects in more effective and reasonable way, this study developed the cost breakdown structure based on spaces using Delphi method. The Cost Breakdown Structure (CBS) based on spaces for multi-family housing projects basically consists of three parts: (i) Building part; (ii) Non-building part; and (iii) Additional part. The characteristics of spaces in multi-family housing projects are fully taken into consideration. Then these three parts were subdivided into work packages in terms of work tasks. Additionally, the usefulness and effectiveness of Space CBS in this paper were validated by analyzing the BOQs of several collected sample projects and matching with Space CBS afterwards.

High Storied Apartment Structure Design and Improvement Direction (다층 아파트 구조설계와 개선책)

  • Lee, Chang-Nam
    • Korean Architects
    • /
    • no.10 s.270
    • /
    • pp.60-65
    • /
    • 1991
  • 최근 ACI Joumal에는 12,000 psi(약 840Kg/㎠)의 콘크리트를 현장에서 비벼 넣어 지은 건물이 소개되었다. 그러니까 우리나라에서 고작 210㎏/㎠ 콘크리트로 아파트를 짓는 것은 후진국의 틀에서 벗어나지 못한 증거라면서 고강도 콘크리트의 도입을 부추기게 되었는데 문제는 그 자체가 나쁘게 아니라 이를 기회로 품질관리도 제대로 못하는 주제에 외형만 본받는 아파트 설계를 하게 된 데에 있다는 것이다.

  • PDF

'살기좋은 아파트 만들기에 구심체 역할 맡겠습니다'

  • 에너지절약전문기업협회
    • The Magazine for Energy Service Companies
    • /
    • s.16
    • /
    • pp.28-29
    • /
    • 2002
  • 에너지관리공단 등과 연대하여 공동주택의 폐열회수기 설치 및 고효율조명기기 교체운동을 펼쳐 공동주택 입주민들의 관리비절감 효과를 상승시키는 것은 물론이고 입주민 상호간에 신뢰 구축 및 살기좋은 아파트 만들기에 저희 협회가 구심체 역할을 해나갈 예정입니다.

  • PDF

기존 집합주택의 에너지절약을 위한 개수방안에 관한 연구 (I)

  • 최영돈
    • Journal of the KSME
    • /
    • v.23 no.3
    • /
    • pp.214-222
    • /
    • 1983
  • 본 연구는 1982년도 한국동력자원연구소의 연구인 "기존주택의 에너지절약을 위한 연구의 일부 이다. 본 연구에서는 먼저 기존 집합주택의 대부분을 차지하는 아파트의 에너지관리진단에 관한 자료를 조사하고 통계처리분석하여 기존 아파트의 열관리 상태를 파악하고 이에 근거하여 개수 방안을 고안하는데 관한 연구를 하였다.

  • PDF

A Study about the cost present condition through research on the actual condition the apartment houses expenses levy system - Focusing on the Apartment Complexes Cases in Seoul - (공동주택 관리비부과방식 실태조사를 통한 비용현황관리에 관한 연구 - 서울시 아파트 단지 사례를 중심으로 -)

  • Park Kyung-Mo;Kim Chang-Duk;Park Tae-Keun;Chon Jae-Youl;Kim Ok-Kyue
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.236-241
    • /
    • 2004
  • Now it is a difficult situation to compare the apartment houses expenses with the others because of showing the difference according to several facts such as the location, the time of completion, the number of households, the heating system and the management system. So tenants who do not know related information cannot know whether the management expenses which they are put to expense is fair or not. Therefore firstly, this study presents cost breakdown system with investigating and analyzing the management expenses levy system of the apartment locating the city of Seoul. Secondly, this deduces problems and presents a remedy with analyzing cost management business procedure.

  • PDF