• Title/Summary/Keyword: 심사절차

Search Result 130, Processing Time 0.027 seconds

The Development of a Railway Safety Maturity Model and Estimate Procedures (철도 안전성숙모델 개발 및 평가절차 방안)

  • Lim, Kwang-Kyun;Yeum, Diogjong;Kim, Sigon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.1
    • /
    • pp.195-202
    • /
    • 2014
  • The newly updated Rail Safety Act is required to build a comprehensive railway safety management system with corresponding accreditation regulations for the purpose of safe railway operations. However, such efforts would not be enough to achieve a successful safety-performance solely without being in place of an appropriate level of safety cultures in an organization. No research was taken place to propose a safety culture maturity model and its estimate procedures in Korean railway industries. The research reviews a variety of safety maturity models applied in many other industries and the process of conducting surveys in order to propose a framework of railway safety maturity estimates, with a set of railway safety elements. This research is expected to contribute in diagnosing weak areas and finding their appropriate treatment, along with in placing the railway safety certificate program from 2014.

Study on height restriction with respect to zone beyond the imaginary surface area under the Military Aviation Law (비행안전구역 밖에서의 고도제한)

  • Ha, Hong-Young;Kim, Hae-Ma-Joong;Hong, Sang-Beom
    • The Korean Journal of Air & Space Law and Policy
    • /
    • v.18
    • /
    • pp.363-384
    • /
    • 2003
  • The Military Airbase Law has designated imaginary surface, restricting the height of structure above the imaginary surface. The purpose of establishment of imaginary surface is to promote safety of aircraft operation. However, given the fact that the land is limited, the Military Airbase Law does not set up outer horizontal surface such that the reduced imaginary surface would undermine the safety of aircraft operations with respect to IFR (Instrument Flight Rules) procedures. The fact that some areas which IFR procedures require are not designated as imaginary surface results in no imposition of height restriction on such area. With regard to aviation safety, this article deals with issue of height restriction on area which is beyond the imaginary surface area. This article also examines the establishment of the imaginary surface in the Military Airbase Law, and conducts case study of imaginary surface systems in other country. Based upon this discussion, the current problems posed in the Military Airbase Law will be discussed. To resolve these problems, it is necessary to establish height restriction zone beyond the current imaginary surface area. The provisions of ICAO, FAA and other counties in relation with this issue are referred as well. As a result, many different proposals are suggested, and it is concluded as the most effective proposal that, in certain zone beyond the imaginary surface area, an aeronautic study should be required for the purpose of ensuring aviation safety before a permit of construction higher than prescribed height is issued.

  • PDF

A Study of Emergency Plan Making Programs for Personnel Handling Accident Precaution Chemicals (사고대비물질 비상조치계획 현장실태 이행기준 연구)

  • Kim, Sung Bum;Chun, Kwang Soo;Ahn, Seung Young;Park, Choon Hwa;Park, Youn Shin
    • Journal of Korean Society of Disaster and Security
    • /
    • v.6 no.1
    • /
    • pp.87-91
    • /
    • 2013
  • Establish standards and review procedures for on-site implementation of the emergency response plan required to establish by substances requiring preparation for accidents. Investigated for the examination content and standards for Process Safety Management (PSM) and Safety Management System (SMS). Safety Management System operator's comments and problems to be expected in the review process. Standards for on-site implementation and review of a person's ability to do the job does not require a high level of expertise. However, it has been created mainly to determine whether appropriate items to be included in the report and the contents presented.

Technical Standards and Safety Review of the Low and Intermediate Level Radioactive Waste Disposal Facility (중.저준위 방사성폐기물 처분시설에 대한 기술기준 및 안전심사)

  • Cheong, Jae-Hak;Lee, Kwan-Hee;Lee, Yun-Keun;Jeong, Chan-Woo;Rho, Byung-Hwan
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.6 no.4
    • /
    • pp.357-368
    • /
    • 2008
  • On July 31, 2008, the Government issued the construction and operation permit for the first low and intermediate level radioactive waste disposal facility in the Republic of Korea. In this paper, the fundamental regulatory framework, regulatory requirements and technical standards of the disposal facility are introduced, and the phased review process adopted for evaluation of the safety of the facility is briefly described. The Atomic Energy Act sets forth a stepwise regulatory framework for the whole life-cycle of the disposal facility such as siting, design, construction, operation, closure and institutional control. More detailed regulatory requirements and technical standards are stipulated in the subsequent regulations of the Atomic Energy Act and a series of Notices issued by the Ministry of Eduction, Science and Technology. The Korea Institute of Nuclear Safety, as entrusted by the Ministry under the Atomic Energy Act, conducted safety review on the disposal facility, and evaluated the compliance with relevant criteria in all technical elements(i.e. siting and structural safety, radiological environmental impact, operational safety, systems and components, quality assurance, and total systematic performance assessment, etc.). The overall safety review process can be phased into inception phase, initial review phase, main review phase and completion phase. The review results were reported to and deliberated by the five Sub-committees of the Special Committee on Nuclear Safety, and then reported to the Ministry. The Ministry issued the construction and operation permit of the disposal facility through the deliberation of the review results by the Nuclear Safety Commission. Hereafter, the safety of the repository will be reassured by a series of subsequent regulatory inspections and reviews under the Atomic Energy Act. In addition, the licensee's continuous implementation of the "Safety Promotion Plan" may also enhance the long-term safety of the repository and contribute to build-up the confidence of the safety case.

  • PDF

Earnings Quality of Firms Selected as the Global Champ Project (글로벌 전문사업 선정기업의 이익의 질)

  • Gong, Kyung-Tae
    • Management & Information Systems Review
    • /
    • v.37 no.4
    • /
    • pp.1-20
    • /
    • 2018
  • This study aimed to examine earnings quality of firms selected as Global Champs project which has been promoted by the government since 2013 to support small and medium sized enterprises, for the screening year(t-1) and selected year(t). Earing quality is measured as the value of discretionary accruals estimated by Dechow et al.(1995) adjusted Jones model and Kothari et al.(2005) model, respectively. I analyze the differences of earning quality between the Global Champ firms and the paired firms selected through criteria of the similar total assets and the same industry in the screening year and the selected year. This study is motivated by the needs of measurement of the performance of the Project from the accounting transparent point of view. As the results of this study, major findings are summarized as follows. Firstly the earnings quality of the selected firms was lower than that of the paired firms. This can be explained as a result of motivation of earnings management by companies eager to meet the requirements to be selected for the Project. Secondly, in the selected year, the earnings quality was proved to improve, comparing to the screening year. This can be explained by the efforts of companies to reinforce management innovation and transparent management, which in turn led to positive effects on the earnings quality. These findings were found to be consistent in the additional analyses, where the earning quality of the reconstructed sample with only selected companies was compared for the screening year and the selected year, based on the year before the screening year(t-2).

An Institutional Approach for Application of the Contracting-out in City Parks - Focused on the Case Study of City Park Management of Seongnam City - (도시공원의 민간위탁 적용을 위한 제도적 방안 - 성남시 도시공원 운영사례를 중심으로 -)

  • Byeon, Jae-Sang;Kim, In-Ho;Shin, Sang-Hyun
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.39 no.5
    • /
    • pp.33-47
    • /
    • 2011
  • One of the most fundamental jobs of contemporary government is to look into various ways of providing its citizens with the best service work. This study aims to establish a procedure through which to consign the management of city parks to private companies, thus inviting participation and satisfaction on the part of citizens. In particular, this procedure includes creating a system of selecting private managing companies, for instance, specifying standards of selection and assembling selection committees. The results of this study can be summarized as follows. First, city parks can be managed better by private companies than by local governments in terms of cost cuts, personnel training, business efficiency, and know-how accumulation. The legal background for this is found in central and local legal articles. Second, it is recommended that the selection committee be composed of 6 to 9 members, both insiders and outsiders. In addition to selecting private managing companies for contracting-out, the committee should under take the role of consulting on how to perform and revise selecting standards, so that they can continue to improve these procedures. Third, the decision on private management should be noticed in advance and be made based on standards considering each local government's condition. These standards should consider the aspects of the public good, cost saving, quality of service, managing supervision, and citizen participation. The committee's assessment takes into account both the quality and the quantity of the standards. Fourth, the contracting-out for city park management should follow the order of: announcing consignment and receiving applicants, organizing selection committees and assessing applications, selecting and contracting, midterm evaluation, and re-announcement and re-consignment. To run city parks through the contracting-out is expected to increase the number of park visitors. Additionally, private consignment will involve a participation of diverse citizenship, thus playing an important role in city parks' building of a green-culture community.

Classification and Analysis of Characteristics of Changes in Apartment Landscape Work (아파트조경공사 설계변경의 유형분류와 특성분석)

  • Park, Chun-Soo;Park, Seung-Burm
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.37 no.1
    • /
    • pp.28-42
    • /
    • 2009
  • In the wake of categorizing the design changes occurred during the period from 2004 till the first half of 2006 in Choongcheong province area, based on purpose and reason of design changes identified by the Korea National Housing Corp, it included 11 types such as the image of the apartment complex, scenic elements, consideration by the user, prevention of the defect, constructability, site conditions, incompatibility between the activities, superordinate standard, prevention of civic complaints, design details and others, along with 47 subordinate elements. And the evaluation intended to identify the corelation between the number and time of design change approval, frequency and scale of design change by type and the cost variations indicated that; firstly, enhancing the image of the apartment complex proved to be the main reason for design changes, accounting for 22% in terms of frequency and 54.9% in terms of cost variation. Secondly, the higher the increase in cost by design change aimed at improving the image of the complex, the lower the decrease in cost by design change for uncertain reasons, dubbed the inverse proportional relations, indicating that the design changes for uncertain reasons were mostly aimed at reducing the construction cost. Thirdly, with regard to the number of design change approval and the time of the initial approval, twice or less and 90 days or less before completion of the construction work, respectively, accounted for $52{\sim}53%$, indicating the design change deliberation and approval tended to have been carried out collectively in the form of ex post facto approval, which seemed to be attributable to the attempt of reducing the construction cost or budget problem, as a result of comparing with the cases in which the cost was reduced.

특수의료장비의 설치 및 운영에 관한 규칙에 의한 정도관리 시행

  • 정해조;김희중;김기황
    • Proceedings of the Korean Society of Medical Physics Conference
    • /
    • 2003.09a
    • /
    • pp.51-51
    • /
    • 2003
  • 국민건강보험재정건전화특별법 (제정 2002.1.19 법률 제 6620호)은 건강보험의 재정적자를 조기에 해소하고 재정수지의 균형을 이루도록 함으로써 건강보험제도의 발전과 국민건강 증진 도모를 그 목적으로 하며, 제14조(특수의료장비의 설치ㆍ운영)에서 의료기관은 보건복지부장관이 고시한 특수의료장비를 설치ㆍ운영하고자 하는 때에는 보건복지부령이 정하는 바에 따라 이를 등록하여야 하며 설치 인정 기준에 적합하게 설치ㆍ운영하여야 하고 정기적인 품질관리를 받아야한다고 명시하였다. 특수 의료장비의 설치 및 운영에 관한 규칙 (제정 2003.1.14 보건복지부령 제235호)은 국민건강보험재정건전화특별법이 제정됨에 따라 특수의료장비의 적정 한 설치와 활용을 위하여 의료기관에서 설치ㆍ운영하는 특수의료장비의 등록절차 설치인정기준 및 품질관리 절차 등을 정하고 특수의료장비에 대한 관리체계를 확립하려는 것이다. 특수의료장비의 설치 및 운영에 관한 규칙의 주요 골자는 가. 의료기관에서 특수장비를 설치ㆍ운영하고자 하는 경우 보건복지부장관 또는 시ㆍ도 지사에게 등록하도록 하였는바, 이 등록에 대한 절차와 특수의료장비의 설치인정기준을 정함, 나. 특수의료 장비에 대한 정기적인 품질관리검사를 서류검사와 정밀감사로 구분하여 서류검사는 1 년마다, 정밀검사는 3 년마다 받도록 함, 다. 품질관리검사기관의 장은 특수의료장비품질관리검사성적서를 신청인에게 교부하고, 보건복지부 또는 시ㆍ도지사 및 건강보험심사평가위원장에게 검사결과를 통보하도록 함, 라. 특수의료정비를 설치ㆍ운영하는 의료기관의 개설자 또는 관리자 및 품질관리검사기관의 장이 작성ㆍ비치ㆍ보존하여야할 서류를 정함이다. 보건복지부장관에게 등록하여야할 특수의료장비는 자기공명영상촬영장치와 전산화단층촬영 장치이며, 시ㆍ도지사에게 등록하여야할 특수의료장비는 유방촬영용장치이다. 본 발표에서는 특수의료장비의 설치 및 운영에 관한 규칙에 대한 개요와 연세의료원 세브란스병원에서 시행하고 있는 특수의료장비의 정도관리 검사, 팬텀영상검사, 그리고 임상영상검사를 소개하고자한다.

  • PDF

Police Officer's Verification Strengthening Device on New Appointment Procedure (신임 경찰공무원의 채용절차상 적격성 검증 강화방안)

  • Kim, Joung-Gyu
    • The Journal of the Korea Contents Association
    • /
    • v.7 no.9
    • /
    • pp.139-147
    • /
    • 2007
  • The police is huge career civil service organization. In 1999, police organization employed 7,801 persons as a new hiring. The police had revised employment system several times for competent human resources. But, it is true that much improvements need yet for person's employment which equip eligibility. Specially, discussions need for many new hirings by duty police system abrogation. Career civil service system is impossible of dismissal after permanent appointment. It is true that competitive rate of police officer examination much rose. But it's not important about organization development in addition this unconnects with competent resources. Must change police officer employment system for organization's future development. This study proposed policy about improvement way of examination for service step, field training officer and appointment.

해외건설공사 수행절차(3)

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.8 s.217
    • /
    • pp.64-67
    • /
    • 2008
  • 해외공사는 주로 해외지점망, 외국설계회사, 발주자 또는 기존 현장을 통해 입수한 공사정보(공사비 및 공사개요, 재원, 발주자, 설계회사, 입찰일정 등)를 토대로 입찰참여 여부를 결정하며, 입찰 자격심사(PQ : Pre-qualification)를 거쳐, 입찰서를 발급받아 견적서를 작성하고 입찰에 임하게 된다. 입찰, 수주활동을 하는 동안 주요사항을 국토해양부 및 해외건설협회에 단계별로 소정의 양식에 의거 보고한다. 주요보고사항 $\Delta$ 수주활동상황보고(입찰예정일 10일 전까지) $\Delta$ 계약체결결과보고(계약체결 15일 이내) $\Delta$ 시공상황보고(매분기 종료후 30일 이내) $\Delta$ 공사내용변경보고(변경 15일 이내) $\Delta$ 준공보고(준공증명서 발급 15일 이내)

  • PDF