• Title/Summary/Keyword: 실시설계관리 방안

Search Result 275, Processing Time 0.03 seconds

An Analysis of the Duration of the Construction Document Phase of Large Public Building Projects Delivered by the Total Solution Service from 2009 to 2014 (공공기관 발주 대형건축공사 실시설계 기간에 대한 분석 및 개선방안 -2009년부터 2014년까지 공공발주 맞춤형 서비스 프로젝트를 중심으로 -)

  • Jung, Wooyoung;Lee, Taewon;Rhee, Pung-wook;Lee, Ghang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.4
    • /
    • pp.89-97
    • /
    • 2015
  • This paper analyzes the duration of the construction document (CD) phase of 42 large public building projects delivered by the total solution service of Public Procurement Services in Korea from 2009 to 2014. The quality of construction documents significantly affects the quality of construction and facility management. Thus, securing appropriate time for the CD phase during project planning is important for the quality of a project. Currently, the duration of the CD phase is planned based on the construction costs of a project following a notice of the Ministry of Land, Infrastructure and Transport. However, our analysis results showed that the correlation between the actual duration of the CD phase and construction costs is very weak. The actual CD phase takes 1.33-1.79 times longer than the planned duration. The practitioners who were interviewed, were already aware that the correlation between the duration of the CD phase and the construction costs is weak. They identified the complexity of the project, the extent of the design changes, project type, client characteristics, and others as more influential factors on the CD phase than the construction costs. To improve the quality of CDs, a new guideline for determining an adequate CD phase duration should be studied and developed.

Design and Implementation of a Qualification Management System for Performance Improvement Through the use of a Internal Management System (내부관리 시스템을 이용한 자격관리 성능개선 시스템의 설계 및 구현)

  • Chang, Young-Hyun;Seo, Jeong-Man
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2008.06a
    • /
    • pp.217-224
    • /
    • 2008
  • 본 논문에서는 기술자격시스템에 대한 관리 운영상의 효율성을 향상시키기 위하여 내부관리시스템을 설계하고 구현하였다. 비정기성 기술자격시스템은 정보처리 관련기업에 개발 및 구현에 대한 전체적인 사항을 위탁업무로 수행하고 처리 결과에 대한 자료를 시행기관에서 인수하여 내부업무를 처리한다. 이러한 관리체계는 추가적 요구정보에 대한 재처리에 많은 문제점을 내포한다. 부가적인 추가적 요구사항에 대하여 재개발 절차가 필요하며 효율적인 업무처리와 관리체계를 수행하는데 불안정한 요소들을 가지고 있는바, 이러한 문제점을 해결하기 위한 방안으로 특수 자격 분야에 시범적으로 적용한 내부관리시스템을 제안하였다. 제안된 내부관리 시스템의 기능 평가는 시뮬레이션 방식으로 최소 규모의 파일럿시스템에서 구현 기술을 적용하고 검증 한 후 실시간 기술자격 시험에 시범 적용한 결과 처리 과정상의 안정성과 실용성이 인증되어 대단위 자격시스템에 확대 적용할 계획이다. 위탁기관과 연계하여 부가적 요구정보 처리 시 발생되는 추가 개발기간에 대한 문제점을 해결하였으며 안정적인 시스템 운영상태와 최대의 효율성을 보여주었다. 특히 내부관리시스템을 사용하는 전문가와 비전문가그룹으로 이루어진 자격시행기관의 시스템 평가에서 사용자 편리성과 확장성 부문에 탁월한 평가를 도출하였다. 본 논문에서 설계 및 구현한 내부관리 시스템은 다양한 방식과 구성요소를 통합하여 공통영역을 표준화 한 후, 체계적으로 실시간 자격관리시스템에 적용 될 수 있을 것으로 분석되었다.

  • PDF

Development Plan of Design for Safety in Construction (설계안전성 검토(DfS) 발전방안)

  • Shin, Ju Yeoul
    • Tunnel and Underground Space
    • /
    • v.27 no.6
    • /
    • pp.351-356
    • /
    • 2017
  • This study introduces the current status of the design for safety(DfS) introduced as one of the owner - centered construction site safety management plan, and presents the problems and the improvement plan. The design for safety has been shifting from the construction management-oriented safety management to the owner-centered safety management system, The owner has to make the design considering the safety from the design stage centered on the owner. The owner has to review and approve the adequacy of the safety-conscious design and The risk factors that can not be eliminated during design are the system to prevent the disaster at the construction site by planning to eliminate the risk factor when writing the safety management plan that is made at the construction stage. The design for safety system implemented from May 2016 will be further developed to prevent the risk of safety accidents that may occur in construction sites, contributing greatly to the reduction of construction accident. In addition, it suggests ways to develop more efficient and convenient system through continuous hazard finding and system improvement.

An Implementation Analysis of Design VE to Turn-key and Alternative Project (턴키 및 대안입찰사업의 설계VE 성과분석)

  • Kim, Ki-Han;Lee, Hyun-Suk;Lim, Hee-Dong;Kim, Byung-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.1011-1014
    • /
    • 2007
  • Design VE system in order to promote the economical efficiency and the functional elevation of construction facilities apply to conatruction over 10 billion from december 2005. But it don't achieve purpose of VE original to maximization of value creation through VE because VE perform formal and result center. This study suggests some idea and analyse implementation of design VE through design VE case of turnkey and alternative project performed in domestic.

  • PDF

A Study on the mobile-based service method of Korea river map (모바일 기반의 한국하천지도서비스 방안)

  • Hwang, Eui-Ho;Lee, Geun-Sang;Koh, Deuk-Koo
    • 한국공간정보시스템학회:학술대회논문집
    • /
    • 2007.06a
    • /
    • pp.78-83
    • /
    • 2007
  • 본 연구에서는 '02년 제작 배포된 한국하천지도의 활용성을 극대화하고 하천관리업무 지원의 체계성을 확보하기 위하여 기 구축된 한국하천지도 추진현황 및 GIS DB를 분석하여 최신 IT기술 적용방안을 검토하였다. 또한, 최신 기술 동향 분석을 통하여 한국하천지도의 활용성 극대화를 위한 위치기반서비스(LBS; Location Based Service) 기술을 선정하여 시스템 설계 구축하였으며, 실시간 하천관리기술 확보를 위하여 건교부 및 공사에서 추진 중에 있는 정보시스템 현황을 조사 분석하여 한국하천지도의 유무선통합서비스 체계 구축을 위한 추진전략을 제시하였다. 이로써, 하천관련 종합적인 정보제공 기반을 구축함으로써 하천관리 업무시 웹 및 모바일 시스템을 통하여 조사자료 및 관리정보를 실시간 조회 및 활용할 수 있는 체계 구축이 가능하여 하천업무의 효율성 및 대국민 서비스의 질을 향상시킬 수 있을 것으로 사료된다.

  • PDF

Analysis the Design Attribution to Assess the Design Quality Based on Detailed Design (실시설계도면 기반 설계속성 도출 및 설계품질평가)

  • Yang, Ji Su;Kim, Yea Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.3
    • /
    • pp.3-12
    • /
    • 2016
  • Recently, construction industry shows active expansion in overseas construction market. But the active work limited in construction work, on the other hand, design-drawing work is evaluated shortage of competitive power. So this study aim to improve the competitive of 'domestic design-drawing work'thorough objective evaluation. Objective evaluation is consist of 'design attribution'. Design attribution is based on the execution drawing and complement by existing reasearch, expert interview. And then, list up the 'design attribution' evaluation list to carry out a survey targeting hands-on worker. Survey is consist of 'Likert 5-point scale, FMEA method'. As a result, construction company and design company show different opinions in both relative position evaluation and importance evaluation.

A Strategic Cooperation Scheme Between Construction Engineering Firms and Design Subcontractors (건설엔지니어링업체와 설계협력사간의 전략적 제휴방안)

  • Kim Hyun-Jun;Park Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.248-251
    • /
    • 2002
  • The cooperative relation between construction engineering firms and design subcontractors is essential to establish design collaboration system. So, this study is initiated with providing a strategic cooperation scheme between construction engineering firms and design subcontractors. A number of literatures related to the design process for engineering firms were reviewed in order to investigate the design collaboration system. A questionnaire survey was peformed to collect and analyze the expert opinion on the current design collaboration system for engineering firms. It is expected that the cooperation scheme can be utilized to improve the cooperative relation between construction engineering firms and design subcontractors.

  • PDF

A Design of Intelligent Tutoring System for Piano Playing using MIDI Keyboard (미디키보드를 사용한 지능형 피아노 교습 시스템의 설계)

  • Kim, Hee-Sung;Choi, Chang-Min;Kim, Seong-Hoon
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2008.08a
    • /
    • pp.165-168
    • /
    • 2008
  • 이 논문에서는 멀티미디어 컴퓨터에 연결된 미디키보드를 사용하여 피아노 연주를 혼자서 배우고 연습할 수 있도록 하기 위한 지능형 교습 시스템을 개발하기 위하여, 시스템 구조 및 모듈별 기능과 기본적인 사용자 인터페이스를 설계하였다. 시스템의 구조는 미디 키보드의 실시간 연주 샘플링 모듈, 미디 데이타의 시퀀싱 모듈, 사운드 합성 모듈과 연결된 지능형 교습 시스템이 된다. 세분화된 모듈별 기능에서는 학습 콘텐츠, 학습자 모델, 진단 평가 모듈, 진도 관리 모듈, 등의 세부적인 기능 설계가 필요하다. 학습자 모델을 기반으로 진단 편가 및 진도 관리를 지능적으로 처리하기 위해서 CLIPS를 사용한 전문가시스템 접근을 사용한다. 컴퓨터 화면상의 악보 디스플레이, 실시간 연주 화면, 진단 평가 디스플레이를 위한 GUI 설계가 필요하다. 그리고, 향후 콘텐츠 구축 및 시스템 구현 시에 예상되는 문제점과 해결 방안을 논의한다.

  • PDF

A Study on The Management of A Building by Applying RFID/USN (RFID/USN의 적용을 통한 건축물 관리 방안)

  • Ju, Hyun-Tae;Kim, Kyung-Hwan;Lee, Yoon-Sun;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.331-336
    • /
    • 2007
  • The importance of a building management is embossed at construction industry and the concernment about a lengthening longevity and a efficient management of construction project is concentrated. At present, a study about maintenance management of existing building is progressed and normal papers concentrate in partial construction project for showing management method. This paper proposes Management method that make use of RFID/USN at the whole course of construction project that is composed plan, design, supply, construction, operation, maintenance management and so on. First of all, this paper analyzes process and applicable scope of RFID/USN at construction project. At each step, use scope, location, method and so on are decided at plan, design step and equipment, human power, materials and so on are established at supply step. real time progress, human power, safety, material, equipment management and so on put in operation at construction step and building is managemented real time by established sensor tag and wireless sensor network. This paper want to helps efficient project progress and management and presents convenience of maintenance management.

  • PDF

Application of Incentive on Design VE to Public Design-Build Projects (공공부문 설계시공일괄사업의 설계VE 인센티브 적용방안)

  • Lee, Hun-Woo;Jung, Jae-Hoon;Kim, Hae-Gon;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.284-288
    • /
    • 2006
  • Ministry of Construction & Transportation prescribes that all of the construction works including Design-Build whose cost more than then billion won must be applied VE at the design phase. It is difficult to apply VE at the design development phase to design-build projects under current design-build contract because design should be proceeded with fixed price by bidding. Therefore the present study suggests an application of incentive which can maximize the effectiveness of design VE in design-build projects after analysing current design-build's characteristics and difficulties of design VE application.

  • PDF