• Title/Summary/Keyword: 시트파일 공법

Search Result 4, Processing Time 0.018 seconds

A Study on the Prevention of Liquefaction Damage of the Sheet File Method Applicable to the Foundation of Existing Structures Using the 1-G Shaking Table Experiment (1-G 진동대 실험을 이용한 기존 구조물 기초에 적용 가능한 시트파일 공법의 액상화 피해 방지에 관한 연구)

  • Jongchan Yoon;Suwon Son;Junhyeok Park;Junseong Moon;Jinman Kim
    • Journal of the Korean GEO-environmental Society
    • /
    • v.24 no.7
    • /
    • pp.5-14
    • /
    • 2023
  • Recently, earthquakes have occurred frequently in worldwide. These earthquakes cause various forms of natural and physical damage. In particular, liquefaction in which the ground shows liquid-like behavior causes great damage to the structure. Accordingly, various liquefaction damage reduction methods are being studied and developed. Therefore, in this study, a method of reducing liquefaction damage in the event of an earthquake applicable to existing structures was studied using the sheet pile method. The 1-G Shaking table test was performed and the ground was constructed with Jumunjin standard sand. A two-story model structure was produced by applying the similitude law, and the input wave applied a sine wave with an acceleration level of 0.6 g and a frequency of 10 Hz. The effect of reducing structure damage according to various embedded depth ratio was analyzed. As a result of the study, the structure settlement when the ground is reinforced by applying the sheet pile method is decreased by about 71% compared to when the ground is not reinforced, and the EDR with minimum settlement is "1". In addition, as the embedded depth ratio is increased, the calculation of the pore water pressure in the ground tends to be delayed due to the sheet pile. Based on these results, the relationship with structural settlement according to the embedded depth ratio is proposed as a relational equation with the graph. The results of this study are expected to be used as basic data in developing sheet pile methods applicable to existing structures in the future.

Suction Penetration Review of Circular Steel Pipes by Field Test (현장 실험을 통한 원형강관 석션관입성 검토)

  • Kim, Hyun-Joo;Choi, Jin-O
    • Journal of the Korean Geotechnical Society
    • /
    • v.36 no.12
    • /
    • pp.35-43
    • /
    • 2020
  • Currently, cofferdams of circular cross section are widely applied as temporary facilities for the installation of bridge foundations in river/sea bridge construction in Korea. Existing caisson, sheet pile, and cell type cofferdam are widely used, but these methods take a lot of time and cost for installation and dismantling. In the case of the existing sheet pile construction method, attention is needed to secure internal and external stability because of the damage to the sheet pile due to ground penetration and difficulty in connecting element members. In this study, penetration design of circular steel pipes using suction pressure was performed on the soft ground of the west coast, and it was confirmed that penetration construction using suction pressure was possible through field tests. It was confirmed that applying the ground analysis results using the cone penetration test (CPT) to the design rather than the standard penetration test (N value) results more similar to the field test results. In addition, it was confirmed that local failure of the inside of the cofferdam was induced when a suction pressure higher than the upper limit suction pressure was applied in the silty sand.

A Study on the Self-contained Earth Retaining Wall Method Using Bracing (브레이싱을 이용한 자립식 흙막이 공법에 관한 연구)

  • Kim, Jong-Gil
    • Journal of Digital Convergence
    • /
    • v.17 no.3
    • /
    • pp.205-213
    • /
    • 2019
  • In a construction site, excavation work has a close relation with temporary earth retaining structure. In order to build the underground structure most effectively in a narrow space, prevent soil relaxation of the external behind ground in excavation work, and maintain a ground water level, it is required to install a temporary earth retaining structure that secures safety. To prevent soil washoff in underground excavation work, the conventional method of temporary earth retaining structure is to make a temporary wall and build the internal support with the use of earth anchor, raker, and struct for excavation work. RSB method that improves the problem of the conventional method is to remove the internal support, make use of two-row soldier piles and bracing, and thereby to resist earth pressure independently for underground excavation. This study revealed that through the field application cases of RSB method and the measurement result, the applicability of the method for installing a temporary earth retaining structure, the assessment result, and displacement all met allowable values of measurement, and that the RSB method, compared to the conventional method, improved constructability and economy.

New Patent Technology for Retaining Wall and Bridge Abutment (옹벽 및 교대 신기술 특허)

  • Kim, Kyeong-Ho;Choi, Jung-Ho;An, Jung-Seng;Kim, Nak-Gyeom
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.11a
    • /
    • pp.895-898
    • /
    • 2008
  • This research paper intends to investigate and review the new technology of patent registration trend for the most recent domestic retaining wall and bridge abutment, and to apply the technology appropriately to the actual retaining wall and bridge abutment construction. Investigated new technological patents for retaining wall include pre-fabricated PC retaining wall construction method that reduces section force with prestressed PS steel bars, pre-fabricated Coupler-Tension retaining wall, clay reinforced retaining wall block for road, earth reinforced retaining wall block that induces uniform settlement, and etc. Investigated new technologies for abutment are abutment construction method that uses sheet pile, monolithic bridge with complex abutments, construction method for abutment bridge, earth reinforced abutment structure and etc.

  • PDF