• Title/Summary/Keyword: 시차 적용

Search Result 263, Processing Time 0.024 seconds

Disparity Estimation Algorithm using Variable Blocks and Search Ranges (가변블록 및 가변 탐색구간을 이용한 시차추정 알고리즘)

  • Koh Je hyun;Song Hyok;Yoo Ji sang
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.30 no.4C
    • /
    • pp.253-261
    • /
    • 2005
  • In this paper, we propose an efficient block-based disparity estimation algorithm fur multiple view image coding in EE2 and EE3 in 3DAV. The proposed method emphasizes on visual quality improvement to satisfy the requirements for multiple view generation. Therefore, we perform an adaptive disparity estimation that constructs variable blocks by considering given image features. Examining neighboring features around desired block search range is set up to decrease complexity and additional information than only using quad-tree coding through applying binary-tree and quad-tree coding by taking into account stereo image feature having big disparity. The experimental results show that the proposed method improves PSNR about 1 to 2dB compared to existing other methods and decreases computational complexity up to maximum 68 percentages than FBMA.

Influence of Delay Time on the Ground Vibration (발파공간 지연시차가 지반진동에 미치는 영향)

  • Kim, Ji-Soo;Choi, Tae-Hong;Lee, Chang-Won
    • Explosives and Blasting
    • /
    • v.32 no.2
    • /
    • pp.1-8
    • /
    • 2014
  • In this study, 16 test blastings had been carried out with different spacings, burdens, drilling lengths, and charges per delay for investigating the characteristics of ground vibration propagation, which depends on the delay time. From the tests, it was possible to derive a ground vibration equation. Using the equation, the characteristics of ground vibration could be investigated by analyzing the nomogram and predicting the Peak Particle Velocity (PPV), which are influenced by the delay time and the priming location. The trend of ground vibration change depending on the delay time was analyzed for the standards charges of 0.5, 1.6, 5, and 15 kg, which were suggested in "Blasting design and construction guidelines to road construction" by the Ministry of Land, Infrastructure and Transport. From the study, it would be possible to suggest a favorable vibration control method, which depends on the charge.

A Study on Stereo Matching Algorithm using Disparity Space Image (시차공간영상을 이용한 스테레오 영상 정합에 관한 연구)

  • Lee, Jong-Min;Kim, Dae-Hyun;Choi, Jong-Soo
    • Journal of the Institute of Electronics Engineers of Korea SP
    • /
    • v.41 no.6
    • /
    • pp.9-18
    • /
    • 2004
  • This paper proposes a new and simple stereo matching algorithm using the disparity space image (DSI) technique. First of all, we detect some salient feature points on each scan-line of the image pair and set the matching area using those points and define a simple cost matrix. And we take advantage of matching by pixel-by-pixel instead of using the matching window. While the pixel-by-pixel method boost up the speed of matching, because of no using neighbor information, the correctness of the matching may not be better. To cover this point, we expand the matching path using character of disparity-space-image for using neighbor information. In addition, we devise the compensated matching module using the volume of the disparity space image in order to improve the accuracy of the match. Consequently, we can reduce mismatches at the disparity discontinuities and can obtain the more detailed and correct disparity map.

Analysis of Groundwater Recharge Characteristics Using Relationship between Rainfall and Groundwater Level (강우량과 지하 수위를 이용한 지하수 함양특성 분석)

  • Lee, Dong-Ryul;Gu, Ho-Bon
    • Journal of Korea Water Resources Association
    • /
    • v.33 no.1
    • /
    • pp.51-59
    • /
    • 2000
  • A dynamic model, which combined time series model with distributed-lag model, is applied to understand the relationship between rainfall and groundwater level. In the model, rainfall with distribution lags and past groundwater level as a dependent variables were used to estimate present groundwater level. The distribution of the lagged rainfall effects for groundwater levels was modeled by Almon polynomials. The model was applied to Banglim and Tanbu groundwater stations in Pyungchang river and Bocheong stream watershed which are representative basins for International Hydrological Program (IHP). The dynamic model represents observed groundwater levels very well and can be used to predict the levels. The model parameters reflect hydraulic characteristics of aquifer. In addition, from the parameters it appears that the increase in groundwater level due to rainfall takes place significantly within first two days of the rainfall event. The rainfall of the order of 18mm/day and 30mm/day at Banglim and Tanbu, respectively, had no significant effect on the groundwater levels.

  • PDF

Influence of Delay Time and Priming Location on the Blast-Induced Ground Vibration (발파공 사이의 지연시차와 기폭위치가 지반진동에 미치는 영향)

  • Kang, Choo Won;Ryu, Bok Hyun;Choi, Tae Hong
    • Tunnel and Underground Space
    • /
    • v.24 no.1
    • /
    • pp.97-109
    • /
    • 2014
  • In order to identify the characteristics of the propagation depending on delay time (20, 25 ms) and priming location (top priming, middle priming, bottom priming), test blasts were carried out a total of 4 times using different spacing, burden, drilling length, charge per delay and was derived the formula to predict blast vibration. This study investigated the characteristics of vibration by analysis of the nomogram and prediction of Peak Particle Velocity (PPV) from delay time and priming location by the formula to predict ground vibration. And it analyzed the trends of vibration increase by standards charge 0.5, 1.6, 5, 15 kg. Standards charge is "Blasting design and construction guidelines to road construction" by the Ministry of Land, Infrastructure and Transport. Depending on the charge in favor of vibration control method is proposed. Thus, when the design was to be used as a variable.

A Survey on the Magnitude of the Sound, Ground Vibration and Properly Delayed Interval of a Plasma Rock-Splitting Machine driven by Electric Shocks (플라즈마 지발 전력충격파암기의 적정 지발시차 및 진동과 소음크기 고찰)

  • Won, Yeon-Ho;Kang, Choo-Won;Kim, Il-Jung
    • Explosives and Blasting
    • /
    • v.27 no.1
    • /
    • pp.7-20
    • /
    • 2009
  • In this study, 5 steps of different delay intervals are applied to a plasma rock-breaking machine that is driven by electric shocks in order to improve the workability of the traditional single-shot type plasma rock-breaking operation. The sequential steps use the electrolyte volume per delay of 1, 2, 3, 4, 5 kg and it has been analyzed to measure the delay time and level of the ground vibration and noise according to exploding. The delay time of the rock-breaking machine by an electric shock of 5 steps has used about 40~50ms at the electrolyte connected from 1 to 3 holes, about 70~80ms at the electrolyte connected from 4 to 5 holes. It is identified that the extents of the ground vibration is low to 1 over 3~6 compared with that of the emulsion explosives.

An algorithm of the natural view transition in the panoramic image based navigation using Fast Fourier Transform Techniques (파노라마 영상 기반 네비게이션에서 FFT 기술을 이용한 자연스러운 장면 전환 알고리즘)

  • Kim, Dae-Hyun;Choi, Jong-Soo;Kim, Tae-Eun
    • The KIPS Transactions:PartB
    • /
    • v.10B no.5
    • /
    • pp.561-566
    • /
    • 2003
  • This paper proposes a new algorithm that generates smooth and realistic transition views from one viewpoint to another view point on the panorama based navigation system. The proposed algorithm is composed with two steps. One is prewarping that aligns the viewing direction in two panorama image, the other is bidirectional disparity morphing (BDM) that generates the intermediate scene from the aligned panorama images. For the prewarping, first of all, we compute the phase correlation between two images in order to get the information such as the displacement, rotation, and scale. Then we align the original images using these information. As soon as finishing the prewarping, we compute the block based disparity vectors (DVs) and smooth them using the two occluding patterns. As we apply these DVs to the BDM, we can get the elaborate intermediate scenes. We make an experiment on the proposed algorithm with real panoramic images and we can get the satisfactory results.

Applying Neuro-fuzzy Reasoning to Go Opening Games (뉴로-퍼지 추론을 적용한 포석 바둑)

  • Lee, Byung-Doo
    • Journal of Korea Game Society
    • /
    • v.9 no.6
    • /
    • pp.117-125
    • /
    • 2009
  • This paper describes the result of applying neuro-fuzzy reasoning, which conducts Go term knowledge based on pattern knowledge, to the opening game of Go. We discuss the implementation of neuro-fuzzy reasoning for deciding the best next move to proceed through the opening game. We also let neuro-fuzzy reasoning play against TD($\lambda$) learning to test the performance. The experimental result reveals that even the simple neuro-fuzzy reasoning model can compete against TD($\lambda$) learning and it shows great potential to be applied to the real game of Go.

  • PDF

Stereo Vision-Based Obstacle Detection and Vehicle Verification Methods Using U-Disparity Map and Bird's-Eye View Mapping (U-시차맵과 조감도를 이용한 스테레오 비전 기반의 장애물체 검출 및 차량 검증 방법)

  • Lee, Chung-Hee;Lim, Young-Chul;Kwon, Soon;Lee, Jong-Hun
    • Journal of the Institute of Electronics Engineers of Korea SC
    • /
    • v.47 no.6
    • /
    • pp.86-96
    • /
    • 2010
  • In this paper, we propose stereo vision-based obstacle detection and vehicle verification methods using U-disparity map and bird's-eye view mapping. First, we extract a road feature using maximum frequent values in each row and column. And we extract obstacle areas on the road using the extracted road feature. To extract obstacle areas exactly we utilize U-disparity map. We can extract obstacle areas exactly on the U-disparity map using threshold value which consists of disparity value and camera parameter. But there are still multiple obstacles in the extracted obstacle areas. Thus, we perform another processing, namely segmentation. We convert the extracted obstacle areas into a bird's-eye view using camera modeling and parameters. We can segment obstacle areas on the bird's-eye view robustly because obstacles are represented on it according to ranges. Finally, we verify the obstacles whether those are vehicles or not using various vehicle features, namely road contacting, constant horizontal length, aspect ratio and texture information. We conduct experiments to prove the performance of our proposed algorithms in real traffic situations.

Transfer Function Model Forecasting of Sea Surface Temperature at Yeosu in Korean Coastal Waters (전이함수모형에 의한 여수연안 표면수온 예측)

  • Seong, Ki-Tack;Choi, Yang-Ho;Koo, Jun-Ho;Lee, Mi-Jin
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.20 no.5
    • /
    • pp.526-534
    • /
    • 2014
  • In this study, single-input transfer function model is applied to forecast monthly mean sea surface temperature(SST) in 2010 at Yeosu in Korean coastal waters. As input series, monthly mean air temperature series for ten years(2000-2009) at Yeosu in Korea is used, and Monthly mean SST at Yeosu station in Korean coastal waters is used as output series(the same period of input). To build transfer function model, first, input time series is prewhitened, and then cross-correlation functions between prewhitened input and output series are determined. The cross-correlation functions have just two significant values at time lag at 0 and 1. The lag between input and output series, the order of denominator and the order of numerator of transfer function, (b, r, s) are identified as (0, 1, 0). The selected transfer function model shows that there does not exist the lag between monthly mean air temperature and monthly mean SST, and that transfer function has a first-order autoregressive component for monthly mean SST, and that noise model was identified as $ARIMA(1,0,1)(2,0,0)_{12}$. The forecasted values by the selected transfer function model are generally $0.3-1.3^{\circ}C$ higher than actual SST in 2010 and have 6.4 % mean absolute percentage error(MAPE). The error is 2 % lower than MAPE by ARIMA model. This implies that transfer function model could be more available than ARIMA model in terms of forecasting performance of SST.