• Title/Summary/Keyword: 시운전

Search Result 387, Processing Time 0.029 seconds

A study on the measurement of ice in the Arctic region (At Svalbard and Chukchi Sea on 2010 summer) (빙해역의 빙상환경 계측에 관한 연구 (2010년 여름 Svalbard와 Chukchi Sea 근해))

  • Kim, Hyun Soo
    • Journal of the Korean Society of Mechanical Technology
    • /
    • v.13 no.1
    • /
    • pp.23-29
    • /
    • 2011
  • The measurement of ice properties such as thickness, strength are important to know the performance of the ice breaking vessel. The measuring equipment of ice properties and methods are summarized in this paper. The actual measured data are also described. The strength of ice at Svalbard area on April 2010 is much stronger than the Chukchi Sea on August 2010. The mean strength of Svalbard is about 500 kPa and one of Chukchi Sea is 250 kPa. The first sea trial in Arctic sea using Araon was carried out in the Chukchi Sea. The power and speed was also measured to check the ship performance in ice. The speed was measured from GPS(Global Positioning System) and engine power was recorded from DPS(Dynamic Positioning system) of Araon. The design target of Araon in level ice is 3 knots in 1m thickness and 630 kPa flexible strength but mean speed in Chuckchi sea is 3.98 knots when 6.6 MW engine power, 2.4m ice thickness and 250 kPa strength. This results comes from the difference of ice types and the weak flexible strength of ice but it will be a good information to know the performance of Araon in similar ice condition.

Hull From Development for a High Speed Container Ship (고속콘테이너선 선형개발)

  • S.I.,Hong;C.Y.,Kim;D.S.,Gong;S.I.,Yang;K.J.,Kang
    • Bulletin of the Society of Naval Architects of Korea
    • /
    • v.27 no.3
    • /
    • pp.1-10
    • /
    • 1990
  • This paper represents the hull form development of a high speed container ship based on the thin ship theory, Hess & Smith method, the reference ship data and model test results. The high efficiency propeller designed by the lifting surface theory shows good performance in the cavitation and the pressure fluctuation force. Also, the optimum design technique based on the finite element method was adopted for the hull structure design and the hull vibration analysis. Finally, the performance of a newly developed container ship has been compared with the sea trial results and the excellent performance in speed, vibration, etc. was confirmed.

  • PDF

The Feasibility study of the scenario for 400kph maximum speed test in HEMU (High-speed Electric Multiple Unit) System (분산형 고속철도 시스템의 400kph 최고속도 시험을 위한 시운전 시나리오 고찰)

  • Kang, B.M.;Jeong, S.H.;An, H.K.;Cho, B.C.;Moon, J.S.
    • Proceedings of the KSR Conference
    • /
    • 2009.05b
    • /
    • pp.429-433
    • /
    • 2009
  • Since the "Low Carbon, Green Growth" as a social requirements is attracted public attention, the policies and investments of the railway which have been less estimated than road is re-considered. Since the starting the commercial service (2004. April), the KTX have been operated successfully while transport passengers over 100million for years. And also the project for development of KHST (Korea High Speed Train ; G7) had been accomplished with a good result, the first trainset of KTX-II which base on G7 project was manufactured and testing now. On the other hand, the world's technology of the high speed train is more faster, and changing to a distributed traction system. To catch up the world's leading technology, the HEMU(High-speed Electric Multiple Unit) project will secure new technology and aims to promote the technology of domestic high-speed train. The authors indicates the result of detail review such as a curve, slope of the track and electrical dead section of the catenary to test at 400kph and also the performance simulation of the developed rolling stock in this paper. As the result, the authors devise the test scenario to perform a maximum speed test (stability at max. speed, acceleration & deceleration etc) with the restricted conditions such as track length, track available time etc by considering above result.

  • PDF

Preliminary Study for the Development of Guidelines for the Installation of Urban Flood Sensors (도심지 침수센서 설치 가이드라인 작성을 위한 기초연구)

  • Sung Uk Kim;Kye Won Jun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.410-410
    • /
    • 2023
  • 최근 한국에서는 기후변화에 따른 영향으로 집중호우의 발생 빈도와 강우강도 증가 및 지속적인 도시침수로 인한 인명 및 재산 피해가 발생하고 있다. 도시침수 예측은 수치모델링, 강우기반의 침수예측 연구가 주를 이루고 있으며, 정량적인 침수계측데이터를 활용한 분석기술은 부족한 실정이다. 침수지도, 침수예측 결과 검증과 더불어 센서기반의 정량적인 침수심 계측 결과를 활용한 도시침수 관리기술 개발이 필요하다. 현재 개발된 침수센서는 개발 주체에 따라 센서 관리 규정이 각각 상이하며, 정해진 규격과 기본적인 성능기준이 부재함에 따라 예산, 유지관리 등 비효율적인 사례가 발생하고 있다. 이에 본 연구에서는 침수센서의 설치시 효율화와 시행착오 등을 방지하기 위해 침수센서의 설치 및 운영에 필요한 성능기준과 설치방법 등을 가이드라인으로 제시하고자 하였다. 가이드라인을 작성하기 위해 도심지 침수센서 관련 설치절차, 설치위치 선정방안, 측정주기, 점검 및 관리 방안 등에 대한 국내외 사례를 조사하였으며, 사례 분석을 통해 침수센서 가이드라인 목차를 도출하였다. 가이드라인 목차로는 침수센서 세부구성 및 작동원리를 기술한 표준모델 구축 방안과 지표, 지표하 등의 계측지점별 센서 설치방안, 현장설치 절차도, 시운전지침으로 구성하였다. 향후 가이드라인을 통해 침수센서를 효율적으로 운영하여 도시침수 발생시 선제적 대응체계 강화 방안 마련에 활용될 수 있을 것으로 판단된다.

  • PDF

Commissioning results of the KSTAR helium refrigeration system (KSTAR 저온헬륨설비 시운전 결과)

  • Cho, K.W.;Chang, H.S.;Park, D.S.;Joo, J.J.;Moon, K.M.;Kim, Y.S.;Bak, J.S.;Yang, S.H.;Fauve, E.
    • Progress in Superconductivity and Cryogenics
    • /
    • v.11 no.1
    • /
    • pp.64-68
    • /
    • 2009
  • To keep the superconducting (SC) magnet coils of KSTAR at proper operating conditions, not only the coils but also other cold components, such as thermal shields (TS), magnet structures, SC bus-lines (BL), and current leads (CL) must be maintained at their respective cryogenic temperatures. A helium refrigeration system (HRS) with an exergetic equivalent cooling power of 9kW at 4.5K without liquid nitrogen $(LN_2)$ pre-cooling has been manufactured and installed for such purposes. In this proceeding, we will present the commissioning and initial operation results of the KSTAR HRS. Circuits which can simulate the thermal loads and pressure drops corresponding to the cooling channels of each cold component of KSTAR have been integrated into the helium distribution system of the HRS. Using those circuits, the performance and the capability of the HRS, to fulfill the mission of establishing the appropriate operating condition for the KSTAR SC magnet coils, have been successfully demonstrated.

Equivalent Pre- Xenon-Oscillation Method for Core Transient Simulation (등가제논진동법을 이용한 노심천이현상의 모사계산)

  • Song, J.S.;Lee, C.K.;Lee, C.C.;Yoo, C.S.;Kim, Y.R.
    • Nuclear Engineering and Technology
    • /
    • v.27 no.6
    • /
    • pp.853-858
    • /
    • 1995
  • The initial condition of a core transient should be consistent with real core state for the simulation of the core tansient. The initial xenon distribution, which can not be measured in the core, has a significant effect on the transient with xenon dynamics. In the simulation of the transient starting from non-equilibrium xenon state, the accurate initialization of the non-equilibrium xenon distribution is essential for the prediction of the core transient behavior. In this study, a xenon initialization method to predict the core transient more accurately was developed through the equivalent pre-xenon-oscillation which represents the tenon oscillation before the transient and verified by the application of the simulation for a startup test of Yonggwang Unit 3.

  • PDF

Measurement and Assessment on the Shaft Power Measurement of Diesel Engine using Strain Gauge in Marine Vessel (선박에서 스트레인 게이지를 이용한 디젤엔진의 축 동력 측정과 평가)

  • Lee, Don-Chool;Song, Myong-Ho;Kim, Sang-Hwan
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.33 no.8
    • /
    • pp.1152-1161
    • /
    • 2009
  • The power measurement of main propulsion system on the new vessels can be classified with the direct method acquired from the shaft's strain using strain gauge and the indirect method converted and summed from all of cylinders combustion pressure using mechanical or electrical pickup device during the sea trial. This power is fluctuated by external factors which was influenced by various sea motions with long time interval and by internal factors which was influenced by varying torques of torsional vibration and bending moment, due to mis-aligned shaft and whirling vibration with short time interval. In this paper, the statistical analysis method for the shaft power measurement and assessment using strain gauge in marine vessels are introduced. And these are identified by the low speed two stroke diesel engine model and four stroke medium speed diesel engine model including reduction gear.

Engineering Status of Gasification Plant in 300MW IGCC and Performance Prediction of Gasification Block (300MW급 IGCC 가스화 플랜트의 엔지니어링 현황 및 가스화 블록 성능예측)

  • Kim, Youseok;Kim, Bongkeun;Paek, Minsu
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2010.11a
    • /
    • pp.130.1-130.1
    • /
    • 2010
  • 미국과 유럽에서는 이미 10여 년 전부터 250MW급 이상의 대용량 석탄IGCC 플랜트를 상업운전 하고 있으며, 일본과 중국을 비롯한 아시아에서도 대용량 플랜트를 시운전하고 있거나 건설 중에 있다. 한국에서는 제4차 전력수급계획에 의거 태안화력 부지 내에 300MW급 IGCC 플랜트 건설을 추진 중이며, 두산중공업은 '10년 상반기에 IGCC 가스화 플랜트에 대한 FEED 설계 (Front-Eng Engineering Design)를 완료하였다. 그 과정 중 설계조건에 의한 기본 엔지니어링 사항과 석탄 가스화 플랜트에 대한 성능예측 결과를 본 연구에서 소개한다. 가스화 플랜트의 엔지니어링은 가스화 블록과 가스정제 블록으로 구분하여 수행하였다. Process Data를 이용하여 PFD Development, P&ID Generation, Equipment Specification 개발, HAZOP 수행, Architecture Engineering 등의 순으로 FEED 설계를 진행하였다. BOD (Basis of Design)를 기준으로 운전조건별 Heat & Mass Balance와 Process Flow를 재검토하고 각 기기별 운전개념을 반영하여 P&ID를 개발하였다. 그리고 배관, 전기 및 제어에 대한 각종 Diagram 개발과 HSE (Health, Safety and Environment) 관련 설계를 수행하였다. IGCC 1호기의 엔지니어링 수행과 함께 Next 호기 자체설계 역량 확보를 위해 두산중공업은 'DIGITs'로 명명된 개념기본설계 Tool을 개발하고 있다. DIGITs는 공정모델링, 단위기기 개념설계, 공정구성 (Process Configuration) 및 종합 Database Package 형태로 구성된다. DIGITs에 의한 계산 결과 공정사 Process Data 기준시 가스화 블록 출구에서 Syngas HHV와 Syngas 현열은 각각 약 $636MW_{th}$와 약 $18MW_{th}$로, Plant 설계조건 $630MW_{th}$를 만족하는 것으로 예측되었다. 향후 DIGITs는 가스정제 블록 및 주변 BOP 설비 등과 연계한 종합 개념기본설계 Tool로써 개발 진행 중이다.

  • PDF

A Study on Ship's Maneuverability Evaluation by Real Ship Test (선박조종성능 평가를 위한 실선 실험연구)

  • Im, Nam-Kyun;Han, Song-Hee;Nguyen, Thanh Nhat Lai
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.17 no.4
    • /
    • pp.383-389
    • /
    • 2011
  • At the design stage, it is very important to know the ship maneuvering characteristics from the view point of ship performance and for the safety of navigation. IMO only gives some criteria for ships in full load even keel condition. However, the ship generally is operated not only in full load condition but also in half load condition or ballast condition. Therefore we must estimate the ship maneuvering in different loading condition to ensure that the ship will satisfy with IMO rules and navigate safely in every condition. In this paper, we have investigated the maneuvering characteristics of a ship by simulation and experiments with real ship. By comparing with the results of simulation, the real ship tests conform with simulation test and previous researches. Therefore, the method base on real data is well done to estimate the ship maneuvering in different loading conditions. The change of ship's manoeuverability accoriding to ship's operation conditions was estimated.

A Study on Loose Part Monitoring System in Nuclear Power Plant Based on Neural Network (원전 금속파편시스템에 신경회로망 적용연구)

  • Kim, Jung-Soo;Hwang, In-Koo;Kim, Jung-Tak;Moon, Byung-Soo;Lyou, Joon
    • Proceedings of the Korean Institute of Intelligent Systems Conference
    • /
    • 2002.05a
    • /
    • pp.227-230
    • /
    • 2002
  • The Loose Part Monitoring System(LPMS) has been designed to detect, locate and evaluate detached or loosened parts and foreign objects in the reactor coolant system. In this paper, at first, we presents an application of the back propagation neural network. At the preprocessing step, the moving window average filter is adopted to reject the low frequency background noise components. And then, extracting the acoustic signature such as Starting point of impact signal, Rising time, Half period, and Global time, they are used as the inputs to neural network. Secondly, we applied the neural network algorithm to LPMS in order to estimate the mass of loose parts. We trained the impact test data of YGN3 using the backpropagation method. The input parameter for training is Rising Time, Half Period, Maximum amplitude. The result showed that the neural network would be applied to LPMS. Also, applying the neural network to the Practical false alarm data during startup and impact test signal at nuclear power Plant, the false alarms are reduced effectively. 1.

  • PDF