Scheduling Risk Management at the Preconstruction Phase (공사 착공 전 단계의 공정리스크 대응방안)

  • Park Ji-Hoon;Kim Sun-Kuk;Han Choong-He
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.457-461
    • /
    • 2004
  • The insufficient management o( the risk of preconstruction phase causes the risk of construction phase so it makes bad effects such as the extension of construction time and raising of cost. Therefore, the management of the risk of preconstruction phase is being considered as an important element of success of project and the competitive power of construction companies. This study Is to suggest solution methods for each progress after examining reasons of the risk for the management of the risk of preconstruction phase 1'he progress is limited as earth work, RC work, steel work and curtain wall work. Through the introduction of Knowledge Management system, work flow is made by specialist of each part. The reasons of the risk of progress are chosen through the analysis of work flow and I suggest detailed solutions such as person in charge, the starting point of progress and the information of requirements according to the grade of importance about elements of the risk

  • PDF

Development of Fuzzy Model for Analyzing Construction Risk Factors (건설공사의 리스크분석을 위한 퍼지평가모형 개발)

  • Park Seo-Young;Kang Leen-Seok;Kim Chang-Hak;Son Chang-Bak
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.519-524
    • /
    • 2001
  • Recently, our construction market recognizes the necessity of risk management, however the application of practical system is still limited on the construction site because the methodology for analyzing and quantifying construction risk and for building actual risk factors is not easy. This study suggests a risk management method by fuzzy theory, which is using subjective knowledge of an expert and linguistic value, to analyze and Quantify risk. The result of study is expected to improve the accuracy of risk analysis because three factors, such as probability, impact and frequency, for estimating membership function are introduced to quantify each risk factor.

  • PDF

A Study on the Development of an Operation Risk Analysis Model in BTL Projects (BTL사업 운영리스크 분석 모형 개발에 관한 연구)

  • Lee, Jeong-Sun;Lee, Jeong-Hun;Oh, Se-Wook;Yoo, Hyun-Seok;Kim, Young-Suk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.475-480
    • /
    • 2008
  • In BTL project, the operation cost covering upcoming 20 years is usually alloted more than construction cost although its plan is made in short time. Therefore, it is a key issue to forecast and to analyze operation risks in the process of making contract in order to successfully finish the BTL project and to ensure the profitability of business. However, only a few domestic professional management companies are capable to carry out funding and facility management. To manage the potential risks efficiently in BLT project, it's essential to prioritize the risk factors by means of considering economical risk level, non-economical risk level and occurrence frequency. Thus, this study suggests risk analysis model for improving efficiency of BTL project from operation company's perspective by means of survey. The suggested risk analysis model is expected to establish a risk management strategy which can improve the efficiency of management affairs in BTL project.

  • PDF

Application of risk evaluation and safety management system in urban deep tunnelling (도심지 대심도 터널에서의 리스크 평가 및 안전관리시스템 적용)

  • Moon, Joon-Shik;Jeon, Kichan;Kim, Younggeun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.6
    • /
    • pp.725-744
    • /
    • 2022
  • As the construction of infrastructure using the underground tunnel in urban area have been rapidly increased, various accidents and collapses of tunnel including structure have been occurred in deep urban tunnelling. The concern and worry relating to the risk and safety of the tunnel during excavation is becoming the key issues in deep urban tunnelling. In this study, it was conducted for deep urban tunnel at GTX (Great Train Express) line which was located in Seoul metropolitan area to determine the risk characteristics for tunnel according to urban tunnelling. Also, it was reviewed the risk analysis and evaluation of the tunnel, shaft and station. And after a review of risk analysis and evaluation for risk register and hazard identification by using a risk matrix method, safety management of the tunnel according to excavation was evaluated to be secured. This study is expected to be applied as useful approach in deep urban tunnelling if you need to review the risk and safety management system of tunnel according to mitigation measures in complex urban tunnelling.

A Study on the Analysis of Delay Claim Risk in Apartment Housing Projects (공동주택공사에서의 공기지연 리스크분석에 관한 연구)

  • Kim Jae-Wook;Woo Kwang-Min;Lee Hak-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.217-221
    • /
    • 2003
  • This study proposes a new classification system and analysis methodology for time delay risk of apartment projects. And this study proposes the classification of major trades and risk level and risk index by performing expert-oriented interview and survey report on a national scale. The purpose of this study is to present basic data for time delay risk management system through the analysis of risk level, risk index and rank of major 5 trades(earth work, structure work, masonry work, window and door/glass work, and interior finish work) in apartment projects.

  • PDF

The Development and Application of Schedule Management Tools in Building Construction (건설 공정리스크 관리도구 개발 및 활용방안)

  • Jung Woo-Joon;Yoon You-Sang;Suh Sang-Wook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.384-387
    • /
    • 2004
  • It is very important to manage the risk in building construction because construction process has too many internal risk compared with others. So construction managers need more developed risk management system than the Present. While the study for the solution and management of generated risk is comparatively enough, the effort to confirm the risk of construction phase on pre-construction phase haying an major effect on total duration, is insufficient. For supporting the schedule risk management of pre-construction, this study suggests the reclassified risk breakdown structure and the investigation form for advance preparations on pre-construction Phase, which help the Poorly experienced construction manager to make more correct decisions and efficiently to execute risk management.

  • PDF

Evaluation of Privacy Impact Assessment for the Electronic Medical Record System in Saitama Hospital (사이타마 병원 전자차트 시스템에 대한 개인정보 영향평가 실시)

  • Shin, Sanhhyu;Seto, Yoichi;Takasaka, Sadamu;Sekizuka, Eiichi
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2014.11a
    • /
    • pp.419-422
    • /
    • 2014
  • 본 논문은 국립 사이타마 병원(일본)이 계획하고 있는 새로운 전자차트 시스템 도입을 위한 병원정보 시스템 시방서(안)에 대한 개인정보 영향평가 평가방법과 결과를 정리한 것이다. 의료정보 시스템이 취급하는 데이터는 민감한 개인정보를 포함하고 있으며 한 번 유출된 개인 정보를 회수하기란 어렵다. 따라서 시스템 구축에 있어서 개인정보보호에 대한 중요성이 높아지고 있다. 개인정보 영향평가는 개인정보 유출에 대한 리스크를 시스템 가동 전에 평가하여 리스트를 경감하는 방법으로, 리스크를 가시화함으로써 사전에 리스크에 대한 대책방안을 마련할 수 있다.

A study on the mitigation model development for minimizing the incidents of disk unit in information system's operational risks (디스크 장애예방을 위한 피해저감모델 개발에 관한 연구 - 정보시스템 운영리스크의 관점에서 -)

  • Hwang, Myung-Soo;Lee, Young-Jai
    • The KIPS Transactions:PartD
    • /
    • v.14D no.6
    • /
    • pp.689-700
    • /
    • 2007
  • Organizations and customers lose if business activities we discontinued by an incident of information systems under the current business environment because they pursue real time enterprise and on demand enterprise. The loss includes the intangible decline in brand image, customer separation, and the tangible loss such as decrease in business profits. Thus. it is necessary to have preparedness in advance and mitigation for minimization of a loss due to the business discontinuity and information system's operational risks. This paper suggests the mitigation model for minimizing the incidents of disk unit in information system's operational risks. The model will be represented by a network model which is composed of the three items as following: (1) causes, attributes, indicators of an operational risk, (2) a periodic time through an analysis of historical data, (3) an index or a regulation related to the examination of causes of an operational risk.