Level of Use of Construction Management Services in Private Building Projects during Pre-construction Stages (민간 건축 CM사업 시공이전단계의 CM서비스 활용도 분석에 관한 연구)

  • Cho, Hong-Keun;Kim, Han-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.5
    • /
    • pp.15-23
    • /
    • 2010
  • Construction management(CM) in the private building sector has been leading the growth of the CM market in Korea. The use of CM services during pre-construction stages has been recognized as a critical factor to succeed in construction projects. Understanding clients' needs of pre-construction CM services is important for CM fedms to strategically prepare and cope with market needs. The objective of this paper is to investigate the level of use of CM services in private building projects during pre-construction stages, and to identify key characteristics and implications. The most distinctive characteristics include the high demand and use of cost management and time management services during pre-construction stages.

A Comparative Study on the Usage Level of Construction Management Services during Pre-Construction Stages - Focused on Public and Private Building Projects - (시공이전단계 CM서비스 활용수준 비교에 관한 연구 - 공공 및 민간 건축CM사업을 중심으로-)

  • Cho, Hong-Keun;Kim, Han-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.3
    • /
    • pp.112-120
    • /
    • 2011
  • Since early 2000s, the use of construction management(CM) in the public and private building sectors has rapidly grown in Korea. In addition, the use of CM services during pre-construction stages has been increasingly recognized as a critical factor to succeed in construction projects. Understanding clients' needs of pre-construction CM services is important for CM firms to strategically prepare and cope with market needs. The objective of the paper is to investigate and compare the usage level of CM services in public and private building projects during pre-construction stages, and to identify key characteristics and implications for CM firms. The paper identified that although there are some differences in CM service needs between public and private sectors, time management and cost management commonly showed the higher usage level.

Benchmarking of US General Contractor's Pre-construction Services for a CM at Risk Project to Improve Contractor's Competitiveness (책임형 CM사 경쟁력 확보 및 선진화를 위한 미국 건설사의 시공이전단계 서비스 벤치마킹 연구)

  • Lee, Chang-Jae;Lee, Sang-Hyo;Ahn, Yong-Han
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.21 no.3
    • /
    • pp.9-18
    • /
    • 2017
  • Construction Management at Risk (CMAR) is a project delivery method that enables CM companies to deliver projects at a Guaranteed Maximum Price (GMP). General contractors can apply CMAR from the initial design phase right through the construction phase to reduce risks and improve project performance. One of the major advantages CMAR offers is that it permits a general contractor to provide a comprehensive suite of preconstruction services, including estimating, a constructability review, value engineering, drawings and a specification review, green building, and Building Information Modeling(BIM), among others. However, general contractors in South Korea currently provide only limited preconstruction services using CMAR because few CMAR projects have yet been implemented in Korea and their experience using the method is therefore limited. This benchmark study of how foreign general contractors utilize CMAR in their projects, particularly during the preconstruction process, its purpose, and the roles and responsibilities of each of the different participants in successful implementations thus provides invaluable information and will serve as a useful guide for Korean contractors seeking to incorporate CMAR preconstruction services in their projects and thus improve the competitiveness of their construction businesses.

A Study on the Role of Construction Management in the Construction Turn-Key Projects (턴키사업과 CM의 역할)

  • Kim Kyung-Nam;Kim Jong-Hoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.223-232
    • /
    • 2002
  • The government, in order to settle and activate the use of Construction Management (CM) method, clarified the legal Issues pertaining to infrastructure development and is taking an active role to promote CM through government sponsored pilot projects. However, when a CM method is applied to a turn-key protect, many applicational difficulites are expected. With design and construction are performed under the simple responsibility in a turn-key method, roles of CM's is overlapped. Also, the characteristics of turn-key method are not reflected to the present $\lceil$CM Work Guideline$\rfloor$. Over the years, various problems have been identified from turn-key projects. Korea's $\lceil$CM Work Guideline$\rfloor$ is more inclusive compared to the CM services of CMAA and overlooks the importance of CM's roles in pre-design phase. In this study, CM's roles of pre-construction phase (pre-bidding, bidding, detail design, contracting) in construction turn-key projects were identified and complementary policy for institution was suggested. We further look into dividing the roles of the CM at turn-key project Into professional role and emotional role. Also, we speculate problems of the existing experience in turn-key projects and suggest a rough methodology on how these concepts can be adjusted for improve the turn-key method.

  • PDF

An Analysis of Core Competence of Pre-construction Service of the Making Inroads into Oversea Construction Market (*for the Entry in the International Construction Business) (해외건설시장 진출을 위한 건설사의 Pre-construction Service 핵심역량 분석)

  • Byun, Il-Woo;Kim, Ye-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.2
    • /
    • pp.80-90
    • /
    • 2012
  • In 2011, the overall construction markets in KOREA are highly depressed due to decreases in orders of domestic construction markets in both private and public field. Also, we are losing competitive advantages over Chinese and Indian companies owing to the market shares on plant construction projects excessively. It is recognizable, under the circumstances that we are in interior position on high value technique to other advanced countries, that the orders of mega building and plant construction projects tend to be placed through the" Pre-construction Service", the importance of which has been emphasized domestically and internationally in recent time. However, current domestic construction companies show scarcity in understanding the general idea of the Pre-construction Service and fail in building proper structure of it. It is obvious that they cannot have any competent strategy to deal with Pre-construction Service. The Purpose of this paper is to analyze the core competence throughout preconstruction phase and, and make up for the weakness in the current pre-construction service process.

The Role of CM for Fast track Completion of Urgent Typhoon Recovery Construction Projects - Gangwon-Do Cases - (수해복구공사 조기착공을 위한 CM의 역할 재조명 - 강원도 사례를 중심으로 -)

  • Kim, Kyoung Nam;Choi, Jae-ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.3D
    • /
    • pp.355-362
    • /
    • 2008
  • Fast track completion of urgent typhoon damage recovery construction project is becoming crucial for the prevention of the secondary damage from the next year typhoon, prompt psychological stabilization of flood sufferers, the early recovery of damaged infrastructure condition and so forth. As the recovery learning process has been continued for last consecutive typhoons and experts suggested, the keys in attaining the goals of the project (preventative, sustainable, cleaner and fast tracking development) are found to be the early contracting and improved competencies in project management especially during the design phase. It can be presumed that the former is attainable through administrative supports in the form of government guidelines, but the latter necessitates more research efforts. In this regards, this study aims to find a way how to lift up the current level of project management capability facing ever changing project mangement environment of urgent typhoon recovery project. By comparing the current level of application of government guidelines in flooded districts and analyzing the time required for each phase from design contracting to construction starting, several reformative ideas are illustrated in association with the necessity of adopting CM method in the deign phase. It is highly expected that CM application in the design phase can be an effective alternative in overcoming current limits in improving the quality of the project and prevent the delay due to the lack of expertise and professional workers in the owner side.