모듈러 건설의 운송계획 최적화를 위한 시뮬레이션 모델 개발 (Development of Simulation Model for Optimization of Modular Construction Transportation Plan)

  • 김현민;권우빈;안희재;조훈희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 봄 학술논문 발표대회
    • /
    • pp.200-201
    • /
    • 2022
  • Off-Site Construction is being widely adopted as an alternative to solve endemic problems in construction industry such as low productivity and efficiency. However, it is strongly recommended to examine the transportation process to be optimized because it determines the size of a modular and influences the cost of the construction. Therefore, in this study simulation model for optimization of modular construction transportation plan was developed using AnyLogic. As a result of the study, the influence of trailer transport capacity and transport time increases as the number of modular which should be transported from factory to site increases.

  • PDF

화재시뮬레이션을 이용한 터널 내 화재시 제연설비 필요성 검토 (A Study on the necessity of smoke control system in the tunnel fire using fire simulation)

  • 하예진;전준호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 봄 학술논문 발표대회
    • /
    • pp.241-242
    • /
    • 2022
  • In this study, fire simualtion was performed to examine the necessity of smoke control system in the tunnel fire. The heat release rate was set to 5 MW and 20MW, and the visibility was measured at 1.8 m, which is the breathing limit, when there is no jet fan. Through this, it was confirmed that 5 MW did not affect the visibility even without the jet fan, and in the case of 20 MW, a jet fan was required to secure the visibility. The visibility was measured at the same location by installing the jet fan, and the simulation was performed by reducing the design volume flow rate of 8.5 m3/s by 80% and 50%, respectively. As a result, it was confirmed that sufficient visibility was secured when the design flow rate and 80% were reduced.

  • PDF

조건별 세부공종 시뮬레이션을 통한 아스팔트 포장공사의 생산성 분석 (Productivity Analysis for Asphalt Paving by Means of Simulation Technique for Site Conditions)

  • 김유진;이수민;노재윤;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.34-35
    • /
    • 2021
  • Currently, the Korean Smart Construction Corporation aims to stimulate overseas expansion of smart construction technology centered on Expressway development. In addition, the integrated classification system of construction information with Work Breakdown Structure(WBS) is currently being established in Korea, but its application to the construction industry is limited. In this study, data generation using simulation is carried out at the lowest level of WBS presented by the Korea Expressway Corporation, and detailed process productivity is predicted by site conditions.

  • PDF

생산성 영향요인을 고려한 건설현장 토공사 시뮬레이션 모델 개발 (Development of Simulation Model for Earthwork Considering Factors Affecting Construction Productivity)

  • 사세원;이찬우;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.149-150
    • /
    • 2021
  • Earthwork is the starting work of construction process, which has the greatest impact on the productivity of the construction project among the works. However, it is difficult to derive accurate productivity becuase the earthwork plan is affected by geological condition of the jobsite. Therefore, a simulation model for productivity analysis of earthwork was developed using CYCLONE modeling method in this study. In this paper, simulation model was made considering the impact factors of earthwork productivity. The proposed model can be utilized for sensitivity analysis in future studies.

  • PDF

빗물침투저류블록의 설치 최적지 선정을 위한 침수범람 시뮬레이션 프로그램의 개발 (Development of Inundation Flooding Simulation Program for Selecting Optimum Installation Site for Rainwater Infiltration Detention Block)

  • 김성표;이태규;류정림;박선미;최희용;최형길
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 가을학술발표대회논문집
    • /
    • pp.129-130
    • /
    • 2023
  • This study proposes rainwater infiltration retention blocks as a solution to the flooding problems caused by recent climate change and developed a flood prediction simulation program to select the optimal site for installing rainwater infiltration retention blocks that can minimize damage from floods. By applying the existing 2D flood analysis model G2D and adding a reservoir function, the volume of water before and after installation can be determined through simulation results.

  • PDF

몰입형 VR(Virtual Reality)을 활용한 건축 설계 도구 개발에 관한 연구 (A Study of Development of Architectural Design Tool Using Immersive Virtual Reality Simulation)

  • 고일두;김진욱;이성
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2010년도 정기 학술대회
    • /
    • pp.141-144
    • /
    • 2010
  • 건설공사 프로젝트는 기획, 설계, 시공, 운영 및 유지관리 등 각 단계의 다양한 참여 주제에 의해 프로젝트가 진행되고 각 분야 간 원활한 의사소통을 통한 협업으로 일을 진행해 나간다. 그러나 각 단계별 커뮤니케이션이 원활히 이뤄지기가 힘들며, 이러한 단계별 분절의 가장 큰 이유 중 하나가 실제적 결과물은 3차원 기반인 것에 비해, 그 과정이 2차원 CAD 시스템에 의존하는 결과와 과정의 격차 때문이다. 그로 인해 각 관련 분야에서 발생되는 정보의 불확실성, 부정확성, 표현의 애매모함 등으로 인해 재작업 및 불필요한 작업이 빈번히 발생하여 전체적인 공정의 지연 및 비용의 문제, 결과물의 품질에 대한 문제가 발생하고 있다. 또한 도면에서의 한계점인 거리감, 공간감 등 실제 사람이 느끼는 Scale감을 알 수 없어 공간에 대한 이해도가 떨어지는 한계점을 극복하지 못하고 있으며 1인칭 작업운영 방식으로 인하여 협업 설계과정에서 원활한 팀워크를 유도 할 수 없다. 따라서 본 연구에서는 협업설계 과정에서 기본설계 단계를 지원하는 설계 도구로서 건축모델의 단순 시각화에서 벗어나 가상공간에서 몰입형 VR 시뮬레이션을 구현하기 위하여 프로토타입 응용을 개발 하였고, 이것을 "Digital Studio"에 구현하여 즉각적인 공간 시뮬레이션을 통하여 실제 시공 전에 문제점들을 검토 및 보완하고 전체적으로는 생산성 향상과 설계 과정 중 오류를 최소화하기 위한 VR시뮬레이션 시스템의 제안 및 Viewer 모듈을 개발 하였다.

  • PDF

건축물 BIM 적용사례를 통한 설계 및 시공프로세스 표준화 수립에 대한 연구 (A Study on the Establishment of Design and Construction Process Standardization through Building BIM Application Case)

  • 정희웅
    • 한국건축시공학회지
    • /
    • 제22권4호
    • /
    • pp.347-358
    • /
    • 2022
  • 국내 건축물 설계 및 시공단계에서의 BIM 적용에 대한 건설 전반적 운영의 기대치인 설계 BIM의 재활용 및 시공단계에서 필요한 견적, 공정 등의 정보 추출 및 활용을 만족하기에는 연계되는 모바일 기술이나 단말기기의 현장 보급 및 적용이 부족한 상태이다. 따라서 본 연구에서는 이러한 BIM 세부 업무 프로세스에 대해 모바일 기술 적용의 4D 시뮬레이션 및 Test-Bed 신축건축물 대상으로 기획·계획·기본·실시설계 및 시공단계에서 3차원 3D와 공정관리 4D 시뮬레이션 및 5D 물량산출 BIM 모델과 라이브러리를 구축하고, 시공단계에서 BIM 모델을 통한 간섭체크 등 다양한 시공성 검토를 보다 효과적으로 활용하는 건설업무의 BIM 프로세스에 대한 표준화 수립을 제시하는데 목적이 있다.

건설시뮬레이션 사이클론 기법을 활용한 시스템 철골계단 공법의 현장적용성 평가 (Construction Performance Evaluation of Steel Staircase Systems based on Construction Simulation CYCLONE Techniques)

  • 이정훈;이경석;김현미;김영석;한승우
    • 한국건축시공학회지
    • /
    • 제10권6호
    • /
    • pp.19-26
    • /
    • 2010
  • 건설 신기술은 현장적용에 대한 불확실성, 기술적 우위의 확신결여 등으로 활성화가 어렵고 신기술 활용실적은 미흡하다. 따라서 건설신기술 현장 적용에 따른 문제를 해결하기 위해 신기술 예측자료가 필요하며, 성능평가 모델이 요구된다. 본 연구의 목적은 의사결정도구로서 건설시뮬레이션을 활용한 신기술의 현장 적용시 예측되는 생산성과 비용을 평가할 수 있는 방안을 도출하는 것이다. 이를 위하여 시스템 철골계단 공법을 선정하였다. 본 공법이 실제 적용 중인 현장에서의 데이터 수집을 기반으로 건설시뮬레이션을 적용하였으며, 이에 본 계단 공법의 1개층 1개소 설치에서부터 6개소 설치 시의 다양한 사례에 대한 시간당 생산성 및 단위비용을 예측하였다. 위의 과정을 통하여 건설시뮬레이션 기법은 현장데이터가 부족한 건설신기술의 현장적용성 평가를 위한 적용의 가능성을 제시하고 있음을 알 수 있다.

빗물침투저류블록 설치 최적지 선정을 위한 침수범람 시뮬레이션 기술 개발 (Development of Flooding and Overflow Simulation Technology for Rainwater Infiltration Storage Block Placement)

  • 김성표;류정림;김호진;최희용;이태규;최형길
    • 한국건축시공학회지
    • /
    • 제24권2호
    • /
    • pp.227-238
    • /
    • 2024
  • 본 연구에서는 최근 이상기후로 인해 양극화된 기후 패턴으로 인한 침수 피해가 증가하고 있으며, 그 해결책이 빗물 침투저류블록이라고 설명하고 있다. 또한, 기존 프로그램의 한계점으로 드론 기술과 결합된 새로운 기능이 필요함을 제안하며, 저류조 기능을 가진 빗물침투저류블록의 최적 설치 장소 선정을 목표로 하는 침수·범람 시뮬레이션 기술 개발에 대한 실험 및 평가를 진행한다. 실제 빗물침투저류블록이 실시공된 지역을 대상으로 평가를 진행하였으며, DEM과 DSM을 통한 기존 프로그램과의 비교, 침수·범람 시뮬레이션 프로그램의 실현장 적용성 검토의 2개 항목을 통해 평가를 진행하였으며, 그 결과, 침수·범람 시뮬레이션 프로그램의 실무에 적용함으로써 빗물침투저류블록의 설치 시 최적지 선정을 위한 의사결정 도구로 활용할 수 있다는 것을 확인하였다.