• 제목/요약/키워드: 시공 단계

검색결과 1,343건 처리시간 0.025초

시공단계 환경부하 저감 가이드라인 구축을 위한 주요 구성항목 도출 (Deduction of Critical Components for establishing the Environmental Load Reduction Guideline in Construction Phase)

  • 김창원;김춘학;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 추계 학술논문 발표대회
    • /
    • pp.127-128
    • /
    • 2012
  • Recently, Construction industry has been trying to reduce environmental loads reflecting the global trend 'Green Growth'. Internal and External countries are provided 'green building certification', 'relevant law/regulations', 'guideline to life cycle', however, construction phase has been overlooked though environmental loads occurred intensively in this phase. Therefore, this study intend to deduct components reflected the guideline in construction phase and assess them quantitatively. The basis data is collected through survey targeting construction managers and related researchers and analyze these data using Analytic Hierarchy Process.

  • PDF

인텔리전트 빌딩의 전원설비 자동제어 시스템의 최적화 방안 II

  • 강성태
    • 전기기술인
    • /
    • 통권282호
    • /
    • pp.24-29
    • /
    • 2006
  • 인텔리전트 빙딜은 건물의 특성상 거주자의 안전과 편의를 최우선적으로 고려해야 하는 첨단 복합빌딩이다. 미 목적을 구체화하기 위한 인텔리전트 빌딩은 빌딩자동화 시스템, 정보통신시스템, 사무자동화 시스템, 시스템 통합3부분으로 나누어서 고찰 할 수 있겠다.이 3가지 시스템의 어느 한 부분이라도 기능을 제대로 발휘하지 못하면 인텔리전트 빌딩으로서 기능을 유지하지 못하므로 이 3가지 부분이 완벽하게 설계, 시공되어 체계적으로 유지관리 될 때 인텔리전트 빌딩으로서의 기능을 발휘하게 된다. 시스템일부의 지장은 시스템 전체에 영향을 미치기 때문에 무엇보다도 시공 품질에 대해서는 일반 빌딩에 비하여 높은 수준을 필요로 함과 동시에 시공의 신뢰도 향상도 요구된다. 특히 시스템의 개획, 즉 설계단계에서 시스템 품질이 대부분 결정되므로 설계단계에서의 충분한 검토가 필요하다. 이장에서는 인텔리전트 빌딩 시스템 (Intelligent building System)의 개념을 알아보고, IBS 건물에 있어 중요한 전원설비의 최적화 방안에 대해 자동제어 설계 및 시공의 입장에서 고찰해 보려한다.

  • PDF

초고층 건축물 시공단계를 위한 태양광시스템의 적용성 분석 (Applicability Analysis of Photovoltaic System in the Construction Phase of High-rise Buildings)

  • 강고운;김태훈;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.21-22
    • /
    • 2011
  • Recently, the development of alternative energy technologies has been actively conducted for energy conservation and CO2 emission reduction. Especially, photovoltaic energy has been applied practically in construction industry, and research on the building-integrated photovoltaic system (BIPV) that can replace fossil fuel for building operation and maintenance has been performed. However, this vibrant research has been limited to the use phase of buildings, and few studies have been carried out in the construction phase. The construction duration and the scale of the sites have increased along with the high-rise trend of buildings, and it is forecasted that the temporary electricity use and CO2 emission in the construction phase is increasing. In sight of these developments, this research analyzed applicability of the photovoltaic system for the construction phase that can replace the electricity used on the high-rise construction site.

  • PDF

시공단계에서의 BIM 도입 저해요인에 관한 기초연구 (A Study on Obstacle Reasons of BIM in Construction Phase)

  • 김지선;유승규;김주형;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.61-62
    • /
    • 2011
  • Construction plans for large construction projects are problems such as Incompatibility of information, omissions due to technical limitations of 2D CAD. In addition to, Plan established for the validation such as process, cost and construction technology plan is difficult. By occurring Frequent changes in the course of business, Inefficiency of management has occurred. In the construction process, there is occurred costs and construction delays due to reconstruction or communication error. In this study, It was deemed BIM will complement Existing 2D CAD problem. And, BIM case studies in the construction phase of domestic construction were analyzed, How to apply BIM in the construction phase investigated.

  • PDF

인텔리전트 빌딩의 전원설비 자동제어 시스템의 최적화 방안 [마지막회]

  • 강성태
    • 전기기술인
    • /
    • 통권283호
    • /
    • pp.33-35
    • /
    • 2006
  • 인텔리전트 빌딩은 건물의 특성상 거주자의 안전과 편의를 최우선적으로 고려해야 하는 첨단 복합빌딩이다. 미 목적을 구체화하기 위한 인텔리전트 빌딩은 빌딩자동화 시스템, 정보통신시스템, 사무자동화 시스템, 시스템 통합3부분으로 나누어서 고찰 할 수 있겠다. 이 3가지 시스템의 어느 한 부분이라도 기능을 제대로 발휘하지 못하면 인텔리전트 빌딩으로서 기능을 유지하지 못하므로 이 3가지 부분이 완벽하게 설계, 시공되어 체계적으로 유지관리 될 때 인텔리전트 빌딩으로서의 기능을 발휘하게 된다. 시스템 일부의 지장은 시스템 전체에 영향을 미치기 때문에 무엇보다도 시공 품질에 대해서는 일반 빌딩에 비하여 높은 수준을 필요로 함과 동시에 시공의 신뢰도 향상도 요구된다. 특히 시스템의 계획, 즉 설계단계에서 시스템 품질이 대부분 결정되므로 설계단계에서의 충분한 검토가 필요하다. 이장에서는 인텔리전트 빌딩 시스템 (Intelligent building System)의 개념을 알아보고, IBS 건물에 있어 중요한 전원설비의 최적화 방안에 대해 자동제어 설계 및 시공의 입장에서 고찰해 보려 한다.

  • PDF

BIM 프로젝트 시공단계의 설계오류 검토 방안에 관한 연구 (A Study on the Review Methods of Design Errors in Construction Phase of BIM Project)

  • 이세잎;심운준;안용선
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.25-27
    • /
    • 2012
  • The domestic construction industry recognize that review of design and construct-ability has the devastating effects. The way to take advantage of BIM for increase the possibility of discovered the design errors in advance are being discussed a lot recently. Since 2012, Public procurement published that the Turn-key project which is the more than 50 billion won in construction have to let the BIM-based design be mandatory. However, people expected the advent of BIM technology can resolve the existing design errors. But the situation is the connection of design stage and construction stage is very insufficient in domestic. Therefore, in this study understanding the types of design errors in construction phase. according the review of design errors before construction. Then can acceleration the application of BIM to improve the workability in a construction site.

  • PDF

시공단계 환경성능 평가를 위한 평가지표 및 중요도 도출 (Indicators for Environmental Performance Assessment of Construction Activities)

  • 이상규;강고운;이명도;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.145-146
    • /
    • 2012
  • With the increasing public concerns on sustainability in construction industry, a variety of standards for green buildings have been developed and implemented. However, most of their criteria are not adaptable to evaluate environmental performances of construction activities. Besides, the great part of existing studies are focusing only on energy consumption and CO2 emissions, overlooking the impact of pollution sources which occur intentionally in the construction phase. In this study, indicators and their importances are investigated to assess the overall environmental performance of construction activities.

  • PDF

철골공사 현장조사를 통한 설계프로세스 개선방안 (The Improvement Plan of Design Process by Case Study of Steel Structural Work)

  • 방성원;오승준;김진호;임남기
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2003년도 학술.기술논문발표회
    • /
    • pp.121-126
    • /
    • 2003
  • Steel frame construction is divided into subsidiary materials with column, beam, girder and bracing. After these are processed in factory for using installing in construction field. These prefabricated furniture is very important in accordance with design drawing about processing and prefabricating. In the case of design process using information transmission in blueprint, omission of material number, processing measure and finishing material, or discordance of each structure drawing and selecting incongruent structural material generated an error in the process of design. These error caused delaying tine and increasing cost and increasing safety accident in the steel-structure work operating process. therefore, design process should consider problem of operating process.

  • PDF

시공단계 탄소배출량의 건축물 용도별 차이 검정: 아파트와 학교를 중심으로 (Comparative study of the carbon emissions in the construction phase for different building usages: a case study of apartments and schools)

  • 강서경;강고운;유위성;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.221-222
    • /
    • 2015
  • Since the input data such as types and quantities of materials cannot be acquired during the planning and designing phases, it is difficult to estimate the carbon emissions from the construction phase. As the materials are closely related to the building usages, an approximate estimation by the usages can be suggested. However, before confirming the estimation, the difference test among the carbon emissions of the building usages should be implemented. This study executed t-test or Mann-Whitney test between apartments and schools. The result of the study statistically verified the significant difference between the carbon emissions of apartments and schools.

  • PDF

막구조 건축물의 구조설계

  • 박즐림
    • 전산구조공학
    • /
    • 제4권1호
    • /
    • pp.32-35
    • /
    • 1991
  • 본 고에서는 막구조 해석.설계시의 주요 내용을 각 해석단계별로 간략히 소개하였다. 막구조는 막이론 자신이 가진 근사성, 요소의 탄성 특성의 근사, 막면 요소로 곡면을 나타내는 기하학적 근사 등으로 구조물의 형태, 막재료의 동특성에 따라 해석시 오차가 발생하게 되며, 또한 구조설계 단계에서 막 판넬 제작 및 시공에 대한 고려가 되지 않으면 그 오차는 더욱 크게 된다. 따라서 향후, 보다 정확한 막구조의 설계를 위해서는 섬유직포에 코팅한 막재의 역학적 특성을 보다 잘 표현할 수 있는 막재모델의 정식화, 막재단도 해석시 무장력 상태의 설계곡면을 구하는 방법, 막판넬을 접합하고, 장력을 도입하는 시공과정을 고려한 실초기 평형상태 및 시공과정 해석법에 대한 연구가 계속 되어야 한다. 또한 초기형상 해석에서 시공과정 해석까지 전 설계과정을 공통 Data Base에서 일관 작업이 가능하도록 막구조통합 설계 System의 개발이 필요하다.

  • PDF