• Title/Summary/Keyword: 시공줄눈

Search Result 41, Processing Time 0.024 seconds

Development of Mechanistic-empirical Joint Spacing Design Method for Concrete Pavements (역학적-경험적 콘크리트 포장 줄눈간격 설계방법 개발)

  • Park, Joo-Young;Hong, Dong-Seong;Lim, Jin-Sun;Jeong, Jin-Hoon
    • International Journal of Highway Engineering
    • /
    • v.13 no.4
    • /
    • pp.51-59
    • /
    • 2011
  • Tensile stress occurs and random crack develops in concrete pavement slab when it contracts by variation of temperature and humidity. The tensile stress decreases and the random crack is minimized by sawcutting the slab and inducing the crack with regular spacing. The random crack, joint damage, decrease of load transfer efficiency are caused by too wide joint spacing while too narrow joint spacing leads to increase of construction cost and decrease of comfort. A mechanistic-empirical joint spacing design method for the concrete pavement was developed in this study. Structurally and environmentally weakest sections were found among the sections showing good performance, and design strengths were determined by finite element analysis on the sections. The joint width for which the load transfer efficiency is suddenly lowered was determined as allowable joint with referring to existing research results. The maximum joint spacing for which the maximum tensile stress calculated by the finite element analysis did not exceed the design strength were found. And the maximum joint width expected by the maximum joint spacing were compared to the allowable joint width. The new method developed in this study was applied to two zones of Hamyang-Woolsan Expressway being designed. The same joint spacing as a test section constructed by 8.0m of joint spacing wider than usual was calculated by the design method. Very low cracking measured at 6 years after opening of the test section verified the design method developed in this study.

Evaluation of Endurance for Roadway Sealant (도로용 줄눈재의 내구성 평가)

  • Lee, Hyoung-Wook;Kim, Seung-Jin
    • International Journal of Highway Engineering
    • /
    • v.11 no.2
    • /
    • pp.133-139
    • /
    • 2009
  • Joints on concrete road prevent failure and crack securing the moderate space when concrete slab expands and contracts as a function of varying temperature throughout all seasons. Filling joint sealants in joints can prevent the interruption of slab movement and failure due to the infiltration of alien substances, and also can prevent crack caused by freezing and thawing and Dowel bar corrosion resulted from water - rainfall and snowfall infiltration through the inside the pavement. They lead to the improvement of the commonality of road. This paper evaluates physical strength, weatherability and deicer resistance of a two-year aged sample from joint on concrete road and its virgin sample. It was found that there are significant differences in aspects of weatherability and adhesive force between the tested sample and silicon materials.

  • PDF

Numerical Analysis off-Shape Cracking in Jointed Concrete Pavements (줄눈콘크리트 포장의 T형 균열 발생 원인 수치 해석)

  • Yun, Dong-Ju;Seo, Young-Guk;Kim, Seong-Min
    • International Journal of Highway Engineering
    • /
    • v.11 no.2
    • /
    • pp.141-149
    • /
    • 2009
  • This study was conducted to investigate the causes that induce the T-shape cracks at the joints in the jointed concrete pavements(JCPs). The finite element models of JCP including dowel bars were developed and the stress distribution in the slab was investigated under environmental loads. To investigate the effect of dowel bars on the transverse stresses at the joints that induce the T-shape cracks, the slab curling behavior was analyzed with and without dowel bars. In addition, the stress concentration was investigated when the dowel bar was not installed at the mid-depth of the slab. The results of this study showed that the transverse stresses were not affected by the dowel bars if the dowel bars were installed at the mid-depth of the slab. However, if the dowel bars were not installed at the mid-depth, the transverse stresses were concentrated at the dowel bar locations when the slab curled. The stress concentration was dependent on the contact characteristics between the dowel bar and concrete, and was significantly large when the dowel bar not installed at the mid-depth was located far from the edge of the slab. Therefore, to mitigate T-shape cracking in JCP, dowel bars should be very carefully installed and leveled at the proper locations.

  • PDF

An Introduction to the Shrinkage Strip for the Crack Control in the Underground Parking Structure (지하주차장의 수축대 시공사례)

  • 김록배;김욱중;이도범;이운세
    • Magazine of the Korea Concrete Institute
    • /
    • v.14 no.2
    • /
    • pp.77-82
    • /
    • 2002
  • 일반적으로 공동주택 지하주차장과 같이 구조물이 대형화되거나 복잡할 경우 구조물의 응력취약 부위에서 균열, 누수 등의 문제가 발생할 확률이 크다. 이에 대한 대책으로 설계자들은 신축줄눈을 선호하고 있으나 신축줄눈은 시공상의 어려움과 사용 중 잦은 하자 발생이라는 문제점을 안고 있다. 이 때문에 근래에 들어 대형 건물을 한 단위로 처리하고 철근으로 보강하려는 경향이 있으나 구속도 차이에 따라 균열, 누수 등의 문제가 여전히 발생하고 있다. 이를 해결하기 위하여 수축대를 설치하여 일정 요구량의 초기 수축량을 수축대에서 흡수하고 이후 수축대 부위에 콘크리트를 메워 일체화시킴으로써 초기 수축에 의한 균열을 상당부분 방지할 수 있다.(중략)

Evaluation of Properties of Ultra-Low Shrinkage Concrete for Omission of Paking Lot Floor Joint (주차장 바닥 줄눈 생략을 위한 초저수축 콘크리트 물성 평가)

  • Kim, Kang-Min;Lee, Hyun-Seung;Yoon, Seob;Seo, Tae-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.194-195
    • /
    • 2022
  • The jointing of unsupported concrete on the parking lot floor is a process for cracking and stress relief due to concrete drying shrinkage and restraint, but curling occurs due to long-term drying shrinkage after the initial age. will be lowered Therefore, by using an expansion material and a shrinkage reducing agent, the dry shrinkage of concrete is realized to 200 με or less.

  • PDF

Evaluation of AASHTO Joint Opening Equation Based on the Analysis of Joint Movement of Concrete Pavement in Korea highway Test Road (시험도로 줄눈콘크리트포장 줄눈폭 변화분석을 통한 AASHTO 줄눈폭 예측식 타당성 연구)

  • Choi, Jeong Keun;Jeong, Jin Hoon;Lee, Seung Woo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.5D
    • /
    • pp.805-812
    • /
    • 2006
  • To investigate the usefulness of AASHTO joint opening equation, joint movement of Korea Highway Test Road was monitored and analyzed. The monitored section included Lean, Rubble, BB3 subbase. Demac gauges were installed at each joint in the monitored section, and joint movements with temperature changes were monitored. The measured joint movements with temperature change were then analyzed based on ER (Effective Ratio). The effect of subbase, which was considered as 'C' value in AASHTO equation, was not shown in the observed joint movement. To study the effcet of sealing on joint opening two unsealed sections were included in the monitored section, and no effects of sealing on joint movement were observed.

Development of Extraction Method of Slab Curling Shape of jointed Concrete Pavement Using Profile Data (줄눈 콘크리트포장의 프로파일 데이터를 이용한 슬래브의 컬링형상 추출기법 개발)

  • Chon, Beom-Jun;Lee, Seung-Woo;Mun, Sung-Ho
    • International Journal of Highway Engineering
    • /
    • v.10 no.4
    • /
    • pp.9-18
    • /
    • 2008
  • Curling is caused by the difference in the temperature and humidity by the depth of the slab in Jointed Plain Concrete Pavement. Slab curvature shape and size change due to curling exert a profound influence on the internal stress and roughness of the pavement, affecting structural and functional performance of the pavement. Direct measurement of the slab curvature entails many problems. Many measuring instruments have to be installed at the early-stage of the pavement construction, and the behavior of the slab curvature needs to be measured accurately from the early-stage. Moreover, the cost and technical difficulty are very formidable to measure the slab curvature. This study develops a measurement method for slab curvature in jointed concrete pavement at any given time by applying Power Spectrum Density Analysis and Inverse Fast Fourier Transformation to the profile data, that can be easily obtained at the construction field site. The effectiveness of this developed method is verified by measuring the profile data of the test road of jointed concrete pavement at an inland central expressway by the hour and by examining the result of extracting the slab curvature shape from this profile data. Additionally, the profile data of CRCP(Continuously Reinforced Concrete Pavement) sections on the same expressway were obtained and analyzed at the same time. The validity of the method developed for the slab curvature shape extraction is verified by comparing the result from the analysis of the profile data of CRCP sections with that from the analysis of the prof1Ie data of jointed concrete pavement sections.

  • PDF

A Study on Performance Warranty Criteria for Expressway Jointed Concrete Pavements (고속국도 줄눈 콘크리트 포장 성능보증 기준 연구)

  • Yeo, Hyun-Dong;Ahn, Deok-Soon;Suh, Young-Chan;Jeong, Jin-Hoon
    • International Journal of Highway Engineering
    • /
    • v.13 no.3
    • /
    • pp.65-73
    • /
    • 2011
  • Recently, researches to introduce the performance warranty contract are in progress for quality improvement of road pavements. The performance warranty contract is a type of contract in which contractors guarantee to maintain certain level of performance during a period from completion of construction. The contract use in Europe and the U.S is being increased because it has been known to contribute to improvement of structure quality, reduction of life cycle cost, development of construction techniques, and etc. The research on performance indicators, threshold values, and warranty durations is essential to effectively introduce the contract in Korea. In this study, literatures on the performance warranty contract for concrete pavements of the Minnesota, Indiana, and Florida of the U.S. were reviewed. Major distresses influencing the pavement performance were investigated and analyzed in the jointed concrete pavement sections of 21 Korean expressway routes to be compared to the performance indicators, threshold values, and warranty durations of the states. More accurate comparison is expected by investigation in planned sections for a long time.

Behaviors of Early-Age Cracks on the JCP (무근 콘크리트포장 초기균열 거동 연구)

  • Park, Dae-Geun;Suh, Young-Chan;Ann, Sung-Sun;Kim, Hyung-Bae
    • International Journal of Highway Engineering
    • /
    • v.6 no.2 s.20
    • /
    • pp.47-59
    • /
    • 2004
  • The temperature variation of concrete pavement at early-age significantly affects the initiation and propagation of its early-age cracks. This implies that the measurement and analysis of early age temperature trend are necessary to examine the causes of early age cracks in the concrete pavement. In this study, it is investigated how the early age temperature trend in concrete pavement affects the random crack initiation and behaviors of saw-cut joints using the actual construction site which is located at the KHC test road. During 72 hours after placing the concrete pavement, the ambient air temperature and temperatures at the top, middle, and bottom in concrete pavement were measured and the random crack initiation in concrete slabs and early age behaviors in the joints were surveyed. The investigation results indicate that the first random crack was initiated at one of the slabs placed in the early morning which have higher temperature changes during early 72 hours. The movement of slab was influenced by the early-age crack in the joint. It suggested that the different occurrence time of the cracks in the joint had an influence on the behavior of the cracks. Besides, the slab constructed In the morning had higher possibility of crack initiation than that in the afternoon. The rarely occurred cracks had bigger gap than other cracks.

  • PDF

Crack Control of Wall type Structures by Shrinkage and Temperature Reinforcement (수축ㆍ온도 철근에 의한 벽체형 철근 콘크리트 구조물의 균열 제어)

  • 김영진;김상철
    • Magazine of the Korea Concrete Institute
    • /
    • v.14 no.2
    • /
    • pp.52-60
    • /
    • 2002
  • 지하철 구조물과 같은 매스 콘크리트 구조물을 시공할 때 온도 측정을 하는 경우는 많으나 이는 내외부 온도차를 적정한 수준으로 유지하여 균열 발생을 제어하기 위한 수단일 뿐 균열폭을 일정한도 내로 제어할 수 있는 조치는 아니다. 매스 콘크리트 구조물에서 균열폭을 제한 값 이하로 하기 위해서는 적절한 양의 철근을 배치하여야 한다. 또한 시공 이음 등을 작은 간격으로 설치하는 것은 구속도를 완화시키고 온도응력이나 균열폭을 저감시켜 균열 제어상 매우 효과적인 수단이 될 수 있다. 그러나 시공 이음, 균열 유발 줄눈 등의 이음간 간격을 좁히면 내하력 수밀성, 내구성 등에 악영향을 미칠 가능성이 높고, 타설 회수가 많아져 동일한 공정이 반복 투입되므로 시공 속도의 저하 및 공사비 상승 등의 단점이 나타날 수 있다.(중략)