Development and Verification of Static-Dynamic Cone Penetrometer (정동적 콘관입실험 장비의 개발과 검증)

  • Bae, Myeong-Ho;Yu, Jung-Dong;Kim, Ju-Han;SaGong, Myung;Lee, Jong-Sub
    • Journal of the Korean Geotechnical Society
    • /
    • v.27 no.1
    • /
    • pp.77-86
    • /
    • 2011
  • The advanced geotechnical information has been required to determine the accurate design parameters for complex construction. However, the Standard Penetration Test (SPT), which has low reliability, has been used to estimate the subsurface condition in the field. The objective of this paper is development and application of the Static-Dynamic penetrometer, which detects the resistances in soft clay, sand and rock. The energy losses according to the rod connection methods (perfect or non-perfect connection, and number rods) are experimentally evaluated. The reflection and transmission ratios are used to investigate the energy loss by a simulation. The static-dynamic cone penetrometer, in which the accelerometers and strain gauges are installed on the cone tip and the rod head, is used to estimate the energy loss during penetration by impacts. The experimental and simulation studies show that the transferred energy through rods with non-perfect connection dramatically decreases. Furthermore, the transferred energy on the rod head is not the same as that on the cone tip. This study demonstrates that the energy loss should be evaluated on the cone tip.

Evaluation of Loss of Prestress Force of Tensile Anchor by Long Term Measurement (장기계측을 통한 인장형 앵커의 인장력 손실 평가)

  • Lee, Bongjik;Lee, Jongkyu
    • Journal of the Korean GEO-environmental Society
    • /
    • v.16 no.10
    • /
    • pp.15-22
    • /
    • 2015
  • In this study, to evaluate the long-term behavior characteristics and the loss of prestress force, the long-term measurement of the tensile anchors in the actual construction was performed and the results were analyzed comparing with the existing estimation. As the reinforcement member used for the purpose of slope stability or uplift-resisting of the permanent structure, etc, the permanent anchor should maintain the functions during the performance period of the structure differently from the temporary anchor. However, as the time passes by, since the relaxation and the creep of the anchor occur constantly, the management for the loss of tensile force is essential to perform the functions stably. So far, the loss of the tensile force has been estimated according to the reduction of the prestress using elasticity theory and using the relaxation value according to the type of tension member and the test using the long-term measurement is limited. Therefore, in this study, the site condition and the ground were investigated for the tensile anchor in the actual construction and the long-term measurement results more than 500 days was analyzed by installing the loadcell, inclinometer and the groundwater level gauge. In addition, the long-term behavior characteristics were evaluated by comparing the disposition of the measured earth retaining wall and the tension force loss of the anchor with the existing interpretation results. In the evaluation results, the most of the tension force loss occurs within 90 days and the loss was measured less than the estimated values.

A Study on Concrete Lining Stress Changes Considering Load Supporting Capacity of Primary Supports of NATM Tunnel (NATM 터널에서 1차지보재의 지보압을 고려한 콘크리트라이닝 응력변화에 관한 연구)

  • Jeon, Sang Hyun;Shin, Young Wan;Yoo, Han Kyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.4C
    • /
    • pp.147-154
    • /
    • 2011
  • Currently NATM tunnels are designed by applying the initial ground loads caused during construction to the primary supports, conisting of shotcrete, steel ribs and rock bolts. For long term considerations, it is assumed that the primary supports lose its functionality and therefore the secondary support, i.e. concrete lining, is design to resist against the entire ground loads. But the steel ribs, usually applied to bad ground conditions, are embedded in shotcrete causing very little corrosion and therefore the assumption that the primary support will lose all of its functionality is too conservative. Also even though shotcrete carbonates in long term, excluding it from design is also too conservative. In this study, we have, through analytical and numerical analysis, set a rational level of support pressure and allowable relaxed rock mass height sustainable by the primary support for long term design. Changes in sectional forces of the concrete lining considering the calculated support pressure of the primary supports was also carried out. Shallow subway tunnels were considered in the analysis with weathered rock and soft rock ground conditions. The analysis results showed that, by considering the support pressure of steel ribs, an economical design of the concrete lining is possible.

A Basic Study on the Prediction of Collapse of Tunnels Using Artificial Neural Network (인공신경망 기법을 이용한 터널 붕괴 예측에 관한 기초 연구)

  • Kim, Hong-Heum;Lim, Heui-Dae
    • Journal of the Korean Geotechnical Society
    • /
    • v.32 no.2
    • /
    • pp.5-17
    • /
    • 2016
  • Collapse of a tunnel can occur anytime, anywhere due to the special characteristics of tunnel structures and unexpected geological conditions during construction. Tunnel collapse will lead to economic losses and casualties. So various studies are continually being conducted to prevent economic losses, casualties and accidents. In this study, we analyzed data from 56 domestic construction tunnel collapse sites, and input factors to be applied to the artificial neural network were selected by the sensitivity analysis. And for the artificial neural network model design studies were carried out with the selected input factors and optimized ANN model to predict the type of tunnel collapse was determined. By using it, in 12 sites where tunnel collapse occurred applicability evaluation was conducted. Thus, the tunnel collapse type predictability was verified. These results will be able to be used as basic data for preventing and reinforcing collapse in the tunnel construction site.

A Study on the Correlation between Underwater Noise and Ground Vibration (지반진동과 수중소음의 상관성 연구)

  • Park, Jung-Bong;Kang, Choo-Won;Lee, Chang-Won
    • Explosives and Blasting
    • /
    • v.31 no.1
    • /
    • pp.11-22
    • /
    • 2013
  • This study compared and analysed ground vibration, size of underwater background noise in fish farms and underwater object noise of blasting and obtained ground vibration prediction equation through a regression analysis and correlation equation between underwater object noises in order to predict degrees of underwater noise in blasting and organize underwater noise control regulations. Before the study, when background noise of fish and shellfish farms with different conditions was measured, levels of background noise were different according to environmental characteristics of each farm. Ground vibration which causes underwater noise was measured to obtain a correlation equation between ground vibration and underwater object noise. Therefore, if underwater noise is predicted for each construction with a use of a correlation and permissible standards appropriate for each condition are applied for design and construction, financial loss from damages to fish and shellfish caused by development of insufficient technological and engineering logic can be prevented and successful construction with safety of underwater creatures guaranteed can be achieved.

Analysis on Impact Factors of Open-cut Type Excavation Work using Numerical Analysis Method (수치해석기법을 이용한 개착식 지반굴착공사의 영향인자 분석)

  • Seong, Joo-Hyun;Kim, Yong-Soo;Shin, Byoung-Gil
    • Journal of the Korean Geosynthetics Society
    • /
    • v.12 no.3
    • /
    • pp.43-53
    • /
    • 2013
  • In this study, an analysis about the causes of different types of excavation on accidents is required in order to prevent the frequently occurring accidents related to the earth retaining structure and excavation. Also, analysis of influence was performed by using numerical typical soil conditions and construction trend using numerical analysis method. According to the analysis results of 25 accident cases, the main influence factors were found as following: insufficient of soil survey, instability of temporary facility and lack of groundwater treatment, etc. Furthermore, in the numerical analysis result of 22 cases, drainage method was occurred larger settlement than waterproof method in the Inland. In case of applying the earth anchor method, it needs more detailed in the regions, which are discovered soft ground or rock discontinuities. Also, The consolidated clay absolutely needs further consideration of excess hydrostatic pressure.

Analysis of Disaster for Common Utility Tunnel & Schemes of Establishing Construction criteria (공동구 재해사례와 건설기준 제정방안)

  • Yoo, Jai-Sung;Lim, Jong-Min
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.1236-1245
    • /
    • 2009
  • 공동구는 도시생활을 영위하는 데 필요한 전기, 가스, 상 하수도, 전화, 통신 등의 공공시설물을 지하매설물 형태로 설치하여 시민들의 일상생활 및 사회 경제활동의 편의성을 제공하고 안전하고 안락한 도시환경을 유지시키며, 효율적인 도시운영이 가능케 하는 공공시설물이다. 그러나, 최근 들어 여의도 공동구 화재(2000년), 여수 공동구 침수(2003년), 구리시 전력구 화재(2006)등과 같이 공동구 및 전력구에서의 화재, 혹은 침수 등에 의해 재해가 발생하여 이로 인한 국가적 경제적, 사회적 손실이 늘어가고 있다. 하지만 국내에서는 공동구내 설비를 화재 및 재해로부터 보호하기 위한 법적 장치가 미비한 실정이며, 현재 운영되고 있는 공동구의 관리 또한 시설관리공단이나 위탁관리기관 등으로 분산되어 있어 일정한 시설물 설치기준이나 유지관리제도가 정립되지 못하여 효율적인 운영이 이루어지지 않다고 판단된다. 본 연구에서는 근래 국내에서 발생한 공동구 재해사례와 공동구 관련 법규를 검토 분석하였으며, 다양화되어 가는 공동구 수용시설 조건에 부합하고 체계적이고 효율적인 공동구의 시공을 위한 공동구 건설기준 제정방안을 도출하였다.

  • PDF

Fire Resistance Assessment of Precast Duct Slab with Fireproof using Hardening Accelerator (경화촉진제를 사용한 내화재 일체형 프리캐스트 슬래브의 화재저항성능 평가)

  • Soon-Wook, Choi;Tae-Ho, Kang;Chulho, Lee;Se Kwon, Kim;Tae Kyun, Kim;Soo-Ho, Chang
    • Tunnel and Underground Space
    • /
    • v.32 no.6
    • /
    • pp.363-372
    • /
    • 2022
  • Precast concrete is an effective method to increase the construction quality and construction speed by optimizing and making the manufacturing conditions similar. In order to more effectively produce a fireproof material-integrated precast duct slab, the purpose of this study was to determine whether the fire resistance performance of the fireproof layer is maintained when a method of increasing the curing rate using a hardening accelerator is used. As a result of performing a fire resistance performance test on specimens classified according to whether or not the hardening accelerator was included, increase of temperature inside the specimen was high in the specimens using the hardening accelerator, and the section loss of the fireproof layer occurred locally on the surface exposed to fire heating. In conclusion, it is judged that the fireproof layer in the case where the strength at 3th day of age is gained within 1 day curing age using a hardening accelerator does not guarantee sufficient fire resistance performance in the conditions used in this study.

Investigation of soil behaviour due to excavation below the grouped pile according to shape of tunnel station (터널 정거장 형상에 따른 군말뚝 하부 굴착 시 지반거동 연구)

  • Kong, Suk-Min;Oh, Dong-Wook;Lee, Jong-Hyen;Lee, Yong-Joo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.1
    • /
    • pp.83-97
    • /
    • 2018
  • Tunnels are widely used for special purposes including roads, railways and culvert for power transmission, etc. Its cross-section shape is determined by uses, ground condition, environmental or economic factor. Many papers with respect to behaviours of adjacent ground and existing structure tunnelling-induced have been published by many researchers, but tunnel cross-section have rarely been considered. A collapse of tunnel causes vaster human and property damage than structures on the ground. Thus, it is very important to understand and analyse the relationship between behavoiurs of ground and cross-section type of tunnel. In this study, the behaviour of ground due to tunnel excavation for underground station below the grouped pile supported existing structure was analysed through laboratory model test using a trap-door device. Not only two cross-section types, 2-arch and box, as station for tunnel, but also, offset between tunnel and grouped pile centre (0.1B, 0.25B, 0.4B) are considered as variable of this study. In order to measure underground deformation tunnelling-induced, Close Range Photogrammetry technique was applied with laboratory model test, and results are compared to numerical analysis.

Investigation of ground behaviour between plane-strain grouped pile and 2-arch tunnel station excavation (2-arch 터널 정거장 굴착 시 평면변형률 조건에서 군말뚝의 이격거리에 따른 지반거동 분석)

  • Kong, Suk-Min;Oh, Dong-Wook;Ahn, Ho-Yeon;Lee, Hyun-Gu;Lee, Yong-Joo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.6
    • /
    • pp.535-544
    • /
    • 2016
  • Special tunnel design and construction methods have been suggested due to developments of subway and tunnel. Collapse accidents of tunnel bring enormous damage. So, observation and analysis for the safety of tunnelling and behaviour of surrounding ground are important. But, it is not economical to implement the field test in every time. Therefore, this study has measured ground behaviour due to excavation of 2-arch tunnel station according to offset between grouped pile and tunnel by laboratory model test. For the model test, trapdoor device was adopted. Tunnelling is simulated by volume loss of 2-arch tunnel. Ground displacements are observed by close range photogrammetric method and image processing. In addition, these data are compared with numerical analysis.