• Title/Summary/Keyword: 시공수준

Search Result 553, Processing Time 0.022 seconds

건설정책 - 국내 건설공사 품질관리 대폭 강화 -국토해양부, 건설공사 품질관리개선 종합대책 마련-

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.231
    • /
    • pp.30-31
    • /
    • 2009
  • 건설공사 품질관리 기준이 대폭 강화된다. 국토해양부는 최근 건설공사의 품질확보와 부실시공 방지를 위해 건설공사 품질관리개선 종합대책을 마련하여 추진할 계획이라고 밝혔다. 국토해양부는 이번에 수립된 대책을 통하여 국내 건설현장의 품질관리 수준을 선진국 수준으로 끌어 올리고 주요국책사업은 물론 민간건설현장의 부실시공을 지속적으로 차단해 나갈 계획이다. 자세한 내용은 다음과 같다.

  • PDF

A Study on the Expression Level of BIM Model for utilizing in Construction Phase (시공단계 활용을 위한 BIM모델의 표현수준에 관한 연구)

  • Noh, Hae-Ra;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.253-254
    • /
    • 2016
  • In the trend of building enlargement, high-rise and irregular shaped building, domestic application of BIM in construction phase is increasing in recent years. BIM that is based on a three-dimensional, requires a specific building expression. Model expression level required for each phase such as design, construction, and maintenance of the construction project can be different. BIM model to apply in practice is difficult because it is not clear to set up the criteria for the expression level of construction BIM model. And it has a limit that is lower productivity in construction project. Therefore, this study considers the way of the improvement and analyzes the application for representation level of construction BIM model through the survey. By analyzing of the survey results, this study will be to present a basis for an appropriate expression level setting of construction BIM model.

  • PDF

The study on the tunnel double-deck blasting methods using electronic blasting systems (더블데크 전자발파를 이용한 터널 발파공법 개발 연구)

  • Lee, Jong-U;Mun, Hong-Pyo;Kim, Nam-Su;Lee, Gang-Il
    • Magazine of korean Tunnelling and Underground Space Association
    • /
    • v.23 no.4
    • /
    • pp.38-48
    • /
    • 2021
  • 최근 국내 건설현장들은 도심지 근접구간에서 발파진동피해를 최소화하기 위하여 전자뇌관을 이용한 미진동 전자발파공법 적용사례가 증가하고 있는 추세이다. 그러나 미진동 전자발파는 무진동 암파쇄 대체공법으로 경제성은 우수하나 시공현장에서 진동을 제어하는 공법으로 1회 굴진장을 1m 이하로 적용하고 있어 시공속도가 저하되는 문제점이 발생하고 있다. 따라서, 미진동 전자발파 수준의 진동제어와 굴착비 절감 및 시공속도를 높일 수 있는 더블데크 발파공법을 연구 및 시험을 수행하였다. 미진동 전자발파와 더블데크 전자발파 비교 시험결과 진동레벨, 발파효율, 파쇄입도, 여굴량 등이 비슷한 수준으로 평가되어 현장 적용시 굴진장 증대로 인한 공사기간 단축 및 시공비 절감이 가능할 것으로 판단되었다.

3D Rebar Placing and Drawing System (3차원 배근 설계 및 배근시공도 작성 시스템)

  • Lee, Byeong-Kwun;Kim, Chee-Kyeong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.529-532
    • /
    • 2010
  • 본 연구에서는 철근가격 급등과 배근시공도 작성 인력 부족에 대비하여 SDM# 제품군을 사용하여 이음/정착을 고려한 3차원 철근 배근 자동화 기술(RAP)로 철근 배근 자동생성 및 배근시공도 작성 시스템을 개발하였다. 최근 철근가격 급등으로 인한 공사원가상승/인건비 상승/배근시공도 작성 인력 부족 등의 기존현황의 문제점 등을 SDM# 제품군의 철근 배근 자동화 기술(RAP)을 이용하여 자동 철근배근/배근시공도 작성/정밀 골조물량 산출/인력절감/시공 정밀도 향상/골조 공사비 절감 등의 효과와 기존의 현장가공으로 인한 철근 손실률 8%를 공장가공을 적용함으로써 3% 수준으로 낮출 수 있어 5% 내외의 절감효과를 얻을 수 있다. 철근현장가공에서 공장가공 전환으로 골조물량 절감을 기대할 수 있고, 이음/정착/응력분포가 고려된 3차원 철근 배근 자동화 기술(RAP)을 이용하여 자동배근 알고리즘에 의한 배근시공도/가공도 작성 효율을 높이고, 기술 자립을 통해 건설시공 분야의 기술력 향상을 기대할 수 있다.

  • PDF

An Experimental Study on the Trenchless Construction Method For Small Diameter Cable Conduits (소구경 비개착 관로건설 기술연구)

  • Seo, Dong-Seob
    • 한국정보통신설비학회:학술대회논문집
    • /
    • 2005.08a
    • /
    • pp.217-221
    • /
    • 2005
  • 도시의 기능이 날로 커져가고 땅속 지하매설물은 포화상태에 이르렀다. 또한 시민들의 의식 수준이 높아가면서 도시에서의 굴착시공은 민원유발과 교통소통장애 문제로 날로 어려워지고 있는 것이 현실이다. KT에서는 무인 및 유인 통신구를 건설할 수 있는 장비를 이미 개발한바 있으며, 본 연구를 통해 도심지에서 보다 효율적으로 통신관로 ${\Phi}50mm,\;{\Phi}150mm,\;{\Phi}300mm$를 시공할 수 있는 장비를 개발하게 되었다. 도시는 복잡하기 때문에 비개착 시공에 있어서 시공 점용면적이 상대적으로 많을 경우 어려움을 겪게된다. 소구경 비개착 장비인 XS-300은 길이 1.45m 폭 0.8m 높이 0.97m 이며 중량은 700kg인 소형장비인 것이 특징이다. XS-300은 도심지에서 통신맨홀 터파기 부분을 압입구로 활용할 수 있으며 경제적인 비용으로 개착식 시공이 불가한 구간에 대한 인입관로 구성과 지하장애물 하월시공, 도로횡단 시공 시에 적합한 장비이다. 특히 타 시설물을 관통한 불량통신시설과 재해에 취약한 통신시설에 대해 안전하고 경제적인 비용으로 이설시공을 할 수 있으며 통신인프라 기초시설 안정화 및 품질고도화에 기여할 수 있을 것이다.

  • PDF

A Comparative Study on the Usage Level of Construction Management Services during Pre-Construction Stages - Focused on Public and Private Building Projects - (시공이전단계 CM서비스 활용수준 비교에 관한 연구 - 공공 및 민간 건축CM사업을 중심으로-)

  • Cho, Hong-Keun;Kim, Han-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.3
    • /
    • pp.112-120
    • /
    • 2011
  • Since early 2000s, the use of construction management(CM) in the public and private building sectors has rapidly grown in Korea. In addition, the use of CM services during pre-construction stages has been increasingly recognized as a critical factor to succeed in construction projects. Understanding clients' needs of pre-construction CM services is important for CM firms to strategically prepare and cope with market needs. The objective of the paper is to investigate and compare the usage level of CM services in public and private building projects during pre-construction stages, and to identify key characteristics and implications for CM firms. The paper identified that although there are some differences in CM service needs between public and private sectors, time management and cost management commonly showed the higher usage level.

Automation of welding process for steel water pipes (상수도강관 파이프 용접공정의 자동화)

  • 나석주
    • Journal of Welding and Joining
    • /
    • v.9 no.3
    • /
    • pp.1-9
    • /
    • 1991
  • 근래에 들어 국민들의 소득이 높아지고 생활수준이 향상됨에 따라 어려운 일은 하지 않으려고 하는 풍조가 사회전반에 걸쳐 만연되고 있다. 용접공정은 우리사회에서 가장 어렵고, 고된 일종의 하나로 인식되어 있고, 그 중에서도 특히 수도용 대형 강관의 용접시공은 열악한 작업현장 환 경과 전자세 용접등의 어려움 때문에 매우 높은 임금을 제시해도 용접공들사이에서 기피되는 대표적 사례이다. 따라서 앞으로의 원활한 상수도 공급을 위해서 긴급하게 요구되는 대형강관의 설치를 위해서는 용접공정의 자동화가 절실히 요구되는 실정이다. 이와 같은 문제의 해결을 위한 연구의 일환으로 선진국의 수도용 대형 강관 용접시공 방법 및 자동화의 현황을 파악하고, 우리나라의 용접시공 현황과 비교, 검토하여 현실에 적합한 수도용 강관의 용접시공 방법 및 자동화기법을 도출하기 위해서 미국, 이태리, 일본의 관계되는 회사들을 방문하였다. 이와 같은 해외방문목적을 요약하면 아래와 같다. 1) 선진국 대형 강관 용접시공의 현황파악 2) 수도용 대형 강관 용접시공자동화의 가능성 조사. 3) 대형 강관 용접시공 자동화를 위해서 필요한 장치들의 성능조사.

  • PDF

The Evaluation of Technology for Temperature Reduction of Mixing & Compaction for Polymer Modified Asphalt (폴리머 개질 아스팔트의 생산 및 시공 온도 저감기술 평가)

  • Jo, Shin-Haeng;Ryu, Ju-Yeol;Lee, Jin-Gu;Kim, Nak-Seok
    • 한국방재학회:학술대회논문집
    • /
    • 2010.02a
    • /
    • pp.46.2-46.2
    • /
    • 2010
  • 아스팔트 포장의 공용성능 행장을 위해 널리 사용되고 있는 폴리머 개질 아스팔트(PMA)는 높은 생산온도와 다짐온도로 인해 생산 시 연료 소비가 많고 시공관리가 어려운 단점을 가지고 있다. 이에 중온형 아스팔트 기술을 접목하여 고온에서의 아스팔트 점도를 낮춤으로써 이와 같은 문제점을 해결하고자 하였다. 바인더의 전반적 공용성능 향상을 위해서 폴리머 (SBR)와 작업성 개선을 위해 Wax 및 기타 첨가제를 혼합하여 아스팔트 바인더를 제조하였으며, 실험결과 PG 82-22의 높은 공용등급의 바인더를 얻었으며, 생산 및 시공온도는 기존의 PMA 아스팔트와 달리 일반 스트레이트아스팔트와 비슷한 수준을 확보하였다. 이를 이용한 아스팔트 혼합물의 공용 성능 면에서도 PMA개질 아스팔트와 비슷한 수준을 나타내었다.

  • PDF

Improvement of Synthesis Construction Plan through 6sigma (6시그마를 통한 종합시공계획서 작성 프로세스 개선)

  • Baek, Ho-Jin;Yoo, Chang-Kyu;Lee, Yoon-Sun;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.613-617
    • /
    • 2007
  • To achieve project successfully in domestic construction site, pre-management of risk is important factor. Synthesis Construction Document made early construction is representative as means of pre-management of risk. But, Synthesis Construction Document is not working properly for pre-management of risk because the level is low as Synthesis Construction Document is made formally and the time is too late to pre manage the risk for various factor. A epoch-making method that differ with existing need to solve this deep-rooted problem of domestic construction site. So, this study is analyzing to achieve subject to heighten level Synthesis Construction Document and shorten creation period with "S"construction company(introducing 6sigma by tool of management innovation 6 sigma)'s data and offering an opportunity that heightens effectiveness and goes forward and aims possibility about construction site suitability of 6sigma by confirming Pilot Test.

  • PDF