• Title/Summary/Keyword: 시공성 평가

Search Result 1,814, Processing Time 0.031 seconds

A Study on the Constructability of Modular Steel Frame (해체.조립식 모듈러 철골조 건물의 시공성에 관한 연구)

  • Zheng, Sheng-Lin;Kang, Joo-Won;Park, Sung-Moo
    • Journal of Korean Association for Spatial Structures
    • /
    • v.8 no.4
    • /
    • pp.65-71
    • /
    • 2008
  • The object of this paper is to evaluate on constructability of modular steel frame with the hollow structural steel section to LEB C-shape. A modular building is built with factory-manufacture and site-construction. The advantage of a Modular building presents that enhanced building quality, shortened construction period and easy at an expansion and enlargement for buildings but also has demerits such as size restriction of the modular units according to the Road Traffic Law and Inflexibility of the unit composition. So in this study we use light-weighted structure members with bolted joint for easy Knock-down and traffic, also we evaluated the constructability of this bolted joints type modular buildings.

  • PDF

Engineering geologic evaluation of TBM tunneling compatibility on Sujongsan drainage tunnel project (부산시 수정산배수지터널 TBM 굴진시 공법적합성을 평가하기 위한 암반의 지질공학적 평가)

  • 양인재;은성민;김우종;우상우
    • Proceedings of the KSEG Conference
    • /
    • 2002.04a
    • /
    • pp.211-218
    • /
    • 2002
  • TBM 터널굴진시 공법적합성을 평가하기 위한 현장조사 및 물리탐사와 세부지질조사를 수행하였다. 해당지역은 부산시 진구 가야동과 동구 수정동이며 인근 수원지인 덕정정수장에서 생산하는 수돗물을 수정산 배수지까지 확대 공급함으로서 송수공급 계통의 이원화로 안정적인 수돗물공급을 수행하기 위한 배수지터널이다. 이론적으로 굴착속도는 암반의 반발경도, 일축압축강도, 석영함량 및 각종 지질특성에 의하여 좌우되는데, 실지 시공에 있어서는 현장여건상 지질조건이나 일축압축강도등 한정된 자료들을 토대로 시공에 임할 수밖에 없다. 이러한 한계를 극복하기 위한 모형개발을 목표로 본 연구에서는 다양한 현장시험을 토대로 한 TBM 굴진 적합성을 검토하고자 하였다. 국내 시공경험상 및 지질특성만을 고려 할 때 본 과업구간의 TBM 적용성은 양호할 것으로 판단하였으나, 뚜렷한 근거에 의거하지 않은 설계는 시공단계에서 엄청난 손실을 야기하게 되므로 보다 상세한 검토를 수행하게 되었다. 본 연구에서는 TBM 공법선정의 적합성을 검토하기 각종 조사 자료들을 정리하였고, 국내시험의 한계점들을 극복하기 위한 적합한 모형개발의 필요성을 제시하고자 하였다.

  • PDF

Constructional Verification Evaluation for Securing the Field Quality of Composite Membrane Waterproofing Material (멤브레인 복합 방수재의 현장품질 안정성 확보를 위한 시공성 실증 평가 연구)

  • Kim, Meong-Ji;Lee, Sang-Wook;Kim, Soo-Yeon;Oh, Sang-Keun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.1
    • /
    • pp.87-95
    • /
    • 2021
  • In this study, seven companies(A~G) designated as new construction technology selected and evaluated KS F 2622: Method of test for performance evaluation of membrane roofing systems that are similar to field application conditions. As a result of the test, it was confirmed that although all test specimens exceeded KS standards in the basic physical, it was difficult to obtain field quality performance in weak areas such as joints and vertical parts of the adhesive coating method in water-tightness, sagging resistance, swelling resistance tests except for fatigue(crack behavior) tests.

A Study on Construction Evaluation Criteria for Securing the Objectivity in Public Construction (공공공사 시공평가 항목의 객관성 확보를 위한 주요 개선 항목 도출에 관한 연구)

  • Seo, Se Deok;Kim, Ok Kyue;Park, Hyung Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.6
    • /
    • pp.913-921
    • /
    • 2019
  • The government introduced the comprehensive evaluation bidding system with the goal of pursuing the best value and the global standard in 2016. However, for the evaluation criteria on the construction evaluation reflected to the comprehensive evaluation bidding system, the problems of the objectivity insufficiency, the inclusion of multiple subjective evaluation items, and the irrationality of the weight for each evaluation item are continue to be presented. The central office group, the local government, the relevant industry, and the expert group share recognition, but the solution is not derived. Hence, the major evaluation items to be improved were derived with the characteristics analyzed to secure the objectivity of the construction evaluation. For the analysis method, the standard deviation and the Fleiss Kappa analysis method were used by utilizing the characteristics that the construction evaluation criteria consist of all 4-point measures (good, average, insufficient, and poor). According to the result, the 10 evaluation items of the total 25 construction evaluation items were derived as the evaluation items to be improved. It was found in the analysis on the major characteristics of the derived evaluation items that the qualitative evaluation criteria such as 'Very Suitable' and 'Suitable' were commonly included in the detailed evaluation guidelines. Hence, as far as the future construction evaluation standards are concerned, the qualitative evaluation standards are sublated, and the improvement should be made mainly for the quantitative evaluation criteria enabling the objectivity assurance.

A Study on the BIM Data Guidelines for the Review of Constructability and Economic Evaluation of Apartment Houses (공동주택 시공성 검토 및 경제성 평가를 위한 BIM 데이터 구축 가이드라인 작성에 관한 연구)

  • Lee, Hae-Chan;Kim, Jin-Man;Lee, Dong-Gun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.149-150
    • /
    • 2019
  • Recently, major public owner and general contractors in Korea are actively preparing and improving BIM manuals and guidelines to effectively apply BIM technology in construction projects. These guideline has a purpose to define the scope of the applying BIM technology to each construction phase and to explain the minimum technology guidance required for the initial stage. In situations where BIM data are to be submitted within a limited time and cost at the design stage, a BIM data preparing process should be carried out in advance to meet the BIM interoperability between the pre and post of construction precess. In this research, we propose the scope of the BIM guidelines to meet and to be considered for the BIM based review of constructability and economic evaluation of Apartment.

  • PDF

Evaluation of Applicability of HWAW (Harmonic Wavelet Analysis of Waves) Method in Determining Grouting Effect in Dam and Embankment (제체 그라우팅 효과 평가를 위한 HWAW방법의 적용성 평가)

  • Noh, Hee-Kwan;Park, Hyung-Choon
    • Journal of the Korean Geotechnical Society
    • /
    • v.32 no.5
    • /
    • pp.15-26
    • /
    • 2016
  • Dam and embankment are very important civil structures. Grouting is widely used to repair and maintain dam and embankment, and it is important to evaluate the effect of grouting for dam safety. The non-destructive method based on determination of wave velocity in the dam or embankment is effectively used to evaluate grouting effect because wave velocity is identical with stiffness and grouting increases local stiffness in a dam. In this paper, HWAW (Harmonic wavelet analysis of waves) method was applied to evaluate the grouting effect. HWAW method can determine two-dimensional shear wave velocity map with good spatial resolution and the shear velocity profile by the proposed method is sensitive to a variation of stiffness of target system. Through numerical simulation and field tests, the applicability of HWAW method in determining grouting effect is shown.

대단면 근접병설터널의 설계 및 안정성 평가기법에 관한 연구

  • 김도형;박준경;김영근;오세준;이두화
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 2003.03a
    • /
    • pp.51-66
    • /
    • 2003
  • 최근 용지매입의 제한과 자연환경훼손의 최소화를 도모하는 사회적 환경으로 인해 대단면 근접병설터널 계획이 점차 증가하고 있다. 지금까지는 주로 중앙벽체부의 지지기능을 활용한 2Arch터널의 형태로 도심지 지하철의 정거장이나 고속도로의 일부구간에 계획되고 있으나, 대단면 근접병설터널에 대한 시공실적 및 설계사례가 부족한 국내에서는 이에 대한 역학적 거동과 합리적 시공방안에 대한 연구가 미흡한 실정이다. 따라서, 대단면 근접병설터널에 대한 국내·외의 설계 및 시공사례를 정리·분석하므로서 차후 제한된 구간에서의 터널계획시 합리적인 설계 및 시공이 되고자 하였다. 또한, 최근 도심지 구간에 계획중인 터널의안정성 검토 사례를 중심으로 터널 및 인접구조물, 중앙필러부 및 콘크리트 라이닝에 대한 상세 안정성 검토방법을 고찰함으로써 기존 병설터널의 거동특성과는 구별되는 대단면 근접 병설터널의 안정성 평가기법에 대한 방향을 제안하였다.

  • PDF

Tunnel Safety Diagnosis in Near-excavation by In-depth Inspection of Tunnel (기존터널 안전진단 결과를 통한 근접시공 시 터널 안정성 평가)

  • Kim, Seok-Jae;Kim, Min-Seok;Kim, Jun-Chul;Yoo, Young-Il;Oh, Joung-Bae;Oh, Sae-Joon
    • Tunnel and Underground Space
    • /
    • v.16 no.4 s.63
    • /
    • pp.347-356
    • /
    • 2006
  • We analyzed case studies doing in-depth inspection of tunnel to maintain safety of existing tunnel in constructing new tunnel near to a existing tunnel with single track. Futhermore, We accomplished in-depth inspection of existing tunnel and numerical analysis. We suggested remedies to security safety of existing tunnel. We applied line drilling and pre-large hole boring method not to have an effect on existing tunnel and convinced the safety of existing tunnel from blast-vibration and blast-noise of numerical analysis. We planed to install basset system to measure displacement of existing tunnel according to excavating new tunnel.

Evaluation Method of Constructability Performance by Implementing Construction Engineering at the Design Phase of Building Construction (건축공사 설계단계에서의 시공엔지니어링 업무 수행에 따른 시공성 평가 방안)

  • Kim, Tae-Hoon;Cho, Kyu-Man
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.128-129
    • /
    • 2018
  • With the increase of tall building construction, efforts for enhancing constructability are required from the pre-construction stage. Therefore, in this study, we proposed an evaluation method of constructability performance by performing construction engineering activities at the design phase. Based on some results of previous studies, we estimated the importance of design factors and categories influencing the constructability in each engineering activity related to temporary work and then presented a method for evaluating the constructability performance of design alternatives.

  • PDF

Constructability Analysis in Aged-Housing Remodeling Demolition Work for Maximizing Waste Recycling (폐기물 재활용성 향상을 위한 리모델링 철거공사의 시공성 평가 및 사례적용)

  • Chae, Seong-Hyun;Kim, Ki-Hyun;Cha, Hee-Sung;Kim, Kyung-Rai;Han, Ju-Yeoun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.3
    • /
    • pp.13-22
    • /
    • 2010
  • From now on, the aged apartment or house is expected to increase rapidly. So, we have to build a process of remodeling and develop the new technique. Demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stability of building. Therefore, we need a step to develop a assessment system, verify and make specified. This paper evaluated how much improve on construction speed, work efficiency, intensity of work and influence with another process comparing the existing method with the new demolition method. The qualitative and quantitative assessment system are developed with these output. The case study was carried out experimental group and control group, based on developed assessment system, which have the same condition. The existing method was made up of 3 steps- 1)Demolish windows, doors and iron goods, 2)Demolish indoor and outdoor walls, 3)Drop the waste. The new demolition method was made up of 5 steps- 1)Demolish windows, doors and iron goods, 2)Demolish the ceiling and wall's finishing materials, 3)Demolish the floor's finishing materials, 4)Demolish indoor and outdoor walls, 5)Drop the waste. Work time, idle time, the character of a work unit are analyzed by mock-up test. This study's output is expected to establish a systematic process of new demolition method and based on the maximizing waste recycling work in our construction industry.