The Analysis about Construction Costs and Profitability of Direction between Subcontracting Construction in General Construction Industry (일반건설업의 직접시공과 하도급시공의 공사원가 및 수익성 비교분석)

  • Hwang, Ug-Sun;Lee, Hyun-Suk
    • Korean Business Review
    • /
    • v.19 no.1
    • /
    • pp.25-34
    • /
    • 2006
  • This research executed research that analyze construction cost and profitability through construction example of direction and subcontracting construction based on common private construction less than 3 billion. The results of this research, is summarized as follows. (1) Analyzed profitability about construction gross and operating profit of direction and subcontracting construction. The construction gross profit rate is 15.2% direction construction, subcontracting construction was analyzed by 1.3% high by 16.5% subcontracting construction, and the operating profit rate is 9.4% direction construction, subcontracting construction was construed by 2.3% high by 11.7% subcontracting construction. (2) Analyzed profitability about operating profit before and after deduction of 4 insurance cost of direction construction. The direction construction operating profit rate is 9.4% before deduction of 4 insurance cost, after deduction was construed that is 7.3% and operating profit rate difference after and before deduction was construed that is 2.1%. Therefore, subcontracting construction (operating profit rate 11.7%) was analyzed that last operating profitability after 4 insurance cost deduction produces more 4.4% about direction construction.

  • PDF

Application of Non-Open Cut H.A.S Method to Improve Constructability (시공성 향상을 위한 비개착 H.A.S 공법 적용에 관한 연구)

  • Choi, Jung-Youl;Jang, Sung-Ho;Chung, Jee-Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.8 no.6
    • /
    • pp.765-773
    • /
    • 2022
  • This study is a study on the application of a horizontal excavation machine system to improve constructability. In this study, the structural stability of non-covered temporary facilities was evaluated by comparing field measurements and numerical analysis. In addition, the appropriateness of the measurement results was analyzed by comparing and analyzing the results of numerical analysis with the analysis results applying the Gaussian probability density function to the measurement results. In this study, structural safety and long-term durability of the linkage were analyzed based on numerical analysis. As a result of the study, it was analyzed that the non-open cut method (H.A.S. method) of this study secures structural safety and constructability as the behavior in the actual construction process is more safe than the numerical analysis results, even if the uncertainty of the ground condition is taken into account.

Development and Performance Evaluation of Under Cut Anchor Stone Curtain Wall Construction Method (언더컷 앵커 방식의 석재 커튼월 공법 개발 및 성능평가)

  • Chang, Kug-Kwan;Park, Nam-Wook
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.18 no.4
    • /
    • pp.138-146
    • /
    • 2014
  • Structural safety as well as variety and aesthetics of building facade are currently gathering more attention in building construction and stone curtain wall is widely used in exterior wall. However, two main problems are existed in curtain wall construction method. One is an uniformity of construction quality and the other is a repair work of stone panels. Also, the noise and vibration occurring in construction may be cause of civil complaint. Therefore, a new method is needed to overcome these problems. This paper presents a new stone curtain wall system using under cut anchor and secondary holes that was developed in this study. Additionally, structural performance evaluation was conducted to verify the constructability and structural safety for wind pressure and seismic load. Through the evaluation of this method, improved constructability and economic efficiency were verified.

Van Fraassen on Empirical Equivalence Argument and Interpretations of Space-time (반 프라쎈의 경험동등성 논변과 시공간에 대한 해석)

  • Yang, Kyuong-Eun
    • Korean Journal of Logic
    • /
    • v.15 no.1
    • /
    • pp.85-107
    • /
    • 2012
  • This essay criticizes Van Fraassen's argument for empirical equivalence among competing theories, which is based on his interpretation of Newtonian space-time. I argue that his misleading interpretation of the ontology of absolute space-time results in his ineffective attacks against a residual structure of space-time, absolute velocity. Van Fraassen's argument basically misleads us into empirical equivalence in that his literal reading of Newtonian space-time disregards a variety of aspects of its model.

  • PDF

Identifying Construction Engineering Tasks at the Design Phase for Enhancing Constructability in High-rise Building Construction - Focused on Temporary Work - (고층 건축공사의 시공성 향상을 위한 설계단계의 시공엔지니어링 업무 도출 - 가설공사를 중심으로 -)

  • Lee, Jin-Woong;Cho, Kyu-Man;Kim, Tae-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.5
    • /
    • pp.453-463
    • /
    • 2017
  • Due to the increase in the size of buildings and scale, the importance of construction engineering that reflects the constructability from the design stage of the project is increasing. Especially, engineering efforts related to facilities, equipment and construction methods for temporary work at the design stage can significantly contribute to improvement of constructability and project performance. The purpose of this study is to derive construction engineering tasks on temporary work at the design phase of the high-rise building projects. 27 preliminary tasks were firstly investigated through literature review and experts' group interview, and the necessity and importance analysis of each tasks were then performed based on questionnaire survey. Most of the tasks related to plans on structural framework and lifting equipment were analyzed as relatively more important ones. Lastly, 21 engineering tasks, which are classified into 5 factors, were proposed through factor analysis. The factors were determined as 1) structural framework, measurement and circulation, 2) lifting equipment and pumping, 3) space zoning, 4) water supply, 5) temporary facility, electric power supply and lighting. The results of this study can be used as basic data for establishing efficient work process of construction engineering on temporary work at the design phase.

Application of Partnering and Constructability in the Design Development Phase of Public Design-Build Projects (공공부문 일괄사업 실시설계단계의 파트너링과 시공성 분석 적용방안)

  • Nam, Yong-Ho;Yeon, Hee-Jung;Hong, Tae-Hoon;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.531-534
    • /
    • 2007
  • In the current domestic design-build contract, design and construction are separated due to prohibition of outside work. but instead the design-build contract adopts a method of fulfilling each assignment as a joint venture, which makes it difficult for participants to communicate each other and often require changes of design. also, It is difficult to performance efficiency project that they don't want to share useful information related to design and construction. In this study suggests how to maxmize the effiency of the project by proposing a process model connected with an efficient partnering and constructability in a deign development phase of design-build constract.

  • PDF

A study on the Economical Installation of Ground Electrodes for Distribution Line (경제적 배전설비 접지극시공 방안에 대한 연구)

  • Kim, Chang-Wan;Seon, Sang-Jin;Wong, Yoon-Chan;Kim, Sang-Gyu
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.418_419
    • /
    • 2009
  • 경제적 배전설비 접지시공을 위해 직렬시공 및 병렬시공에 대한 접지저항 특성을 검토하여 우리나라 배전설비 접지시공의 개선점을 살펴 보았다. 접지저항감소를 위해 병렬로 시공하는 경우 5P이상 시공하는 것은 비경제적임을 알 수 있었고, 접지저항측정값과 계산값이 일치함을 통해 접지설계시 계산식의 신뢰성을 확인하였다. 또한 경제적이며 계절의 변화특성이 좋은 직렬시공의 우수성과 현장실증결과 4S이상 직렬시공이 가능함을 알 수 있었다. 현장여건에 의해 부득이 하게 병렬 시공을 하는 경우 접지시공의 경제성을 확보하기 위해서는 현장실증을 통한 접지극간 이격거리 선정이 필요함을 알 수 있었다.

  • PDF

A Study on the Mechanized Construction for Common Ducts in a Road Tunnel (도로터널 공동구의 기계화 시공에 관한 연구)

  • Moon, Kyoung-Sic;Kim, Sung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.6
    • /
    • pp.1937-1944
    • /
    • 2014
  • In recent years, common ducts have been installed and operated in the sidewalls of tunnels to prepare for emergencies in tunnel construction and maintenance. The installation of common ducts is done mainly by humans. Problems with cost increases are inherent in tunnel construction by humans due to the safety risks and the economic inefficiency of humans performing construction activities. Among the problems that arise are poor illumination due to the use of temporarily installed electricity, the risk of accidents due to the confined workspaces, and workers avoiding work tasks because of the poor environment in tunnel. Ideas for solving these problems were developed using a value engineering (VE) process, and mechanized construction was identified as a promising solution. To verify the effectiveness of mechanized construction of a common duct in tunnels, experimental construction work was carried out, and mechanized construction was proven to directly improve the constructability and economic efficiency of common duct construction. In addition, reducing human involvement in common duct construction in tunnels is expected to improve safety, and because of the continuous concrete placement technique used, the finish and appearance of the ductwork are improved.

Analytical study for effects of shoring stiffness and slab cracking on construction loads of flat plates (플랫 플레이트 시공하중에 대한 동바리 강성 및 슬래브 균열 효과 분석)

  • Kim, Jae-Yo;Hwang, Hyeon-Jong;Park, Hong-Gun;Hong, Geon-Ho;Lim, Joo-Hyuk;Kim, Yong-Nam
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2009.04a
    • /
    • pp.438-441
    • /
    • 2009
  • 휨강성이 작은 바닥시스템인 플랫 플레이트 구조는 응력조건 뿐만 아니라 사용성조건에 의하여 구조적 성능이 결정될 수 있으며, 특히 과도한 시공 하중의 작용은 시공 중 안전성에 대한 단기적인 손상 뿐만 아니라 사용성에 관련된 장기적인 손상을 발생시킬 수 있다. 이러한 플랫 플레이트의 시공하중은 동바리지지 층 수, 시공주기, 슬래브 콘크리트의 재료적인 강성 뿐만 아니라, 동바리의 강성과 슬래브에 발생하는 균열에 의한 영향에 의하여 결정된다. 본 논문에서는 다양한 설계조건에 대한 해석연구를 통하여, 동바리-슬래브의 강성비 변화 및 콘크리트 균열에 의한 단면강성저하가 슬래브들 간의 하중 분포에 미치는 영향을 분석하고, 이러한 동바리 강성 및 슬래브 균열의 영향을 고려한 시공하중 산정법을 제안한다.

  • PDF

Application of the Evaluation System of Rock Mass in a Mountain Tunnel Constructed by NATM (NATM 시공 산악터널에서의 암반평가시스템 적용 연구)

  • 김영근;장정범;정한중
    • Tunnel and Underground Space
    • /
    • v.5 no.4
    • /
    • pp.297-307
    • /
    • 1995
  • 터널은 긴 선상구조물로서 사정조사결과와 다른 지질조건이 나타날 수 있으므로, 안전하고 합리적인 터널공사를 위해서는 시공중 지질조건에 적합한 지보설계를 실시하는 것이 필수적이다. 이를 위해서는 시공중 터널주변자반에 대한 정량적이고 공학적인 평가가 매우 중요하다. 그러나 시공중 암반을 평가하는 것은 매우 어렵고 조사자의 경험과 지식의 차이에 의해 평가정도가 크게 달라져 그 불합리성이 심화되고 있는 실정으로 터널주변암반에 대한 합리적인 평가방법이 절실히 요구되고 있다. 본 연구에서는 터널화상처리, GeoCAD, 역해석으로 구성된 평기시스템을 개발하였다. 본 시스템은 터널막장에서의 조사.시험 및 화상처리기법을 통하여 암반분류.평가를 실시하고, 터널주변 지반구조 및 굴착/지보과정의 3차원 모델링을 통하여 전방지질을 예측가능하게 하며, 터널계측자료의 역해석을 통하여 터널주변 지반의 물성을 정량적으로 평가할 수 있는 체계적이고 종합적인 평가시스템이다. 또한 이를 NATM 공법으로 시공되는 터널현장에 적용하므로써 본 시스템의 현장적용성을 검증하였으며, 이를 통해 적절한 지보공을 시공하여 터널의 안정성을 확보하고 합리적인 시공관리를 달성할 수 있었다.