Buildability of 3D Printed Concrete Structures at Various Nozzle Speeds and Aspect Ratios (노즐이동속도와 변장비에 따른 3D 프린팅 콘크리트 구조물의 시공성)

  • Park, Ji-Hun;Lee, Jungwoo;Joh, Changbin;Yang, In-Hwan
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.7 no.4
    • /
    • pp.375-382
    • /
    • 2019
  • In this study, an experimental study on the buildability of the structure using the developed printing materials and equipment was performed. Experimental variables included the moving speed of nozzles(=80 and 100mm/s), the revolutions per minute (RPM) of screw in discharge buckets, and the aspect ratio(=1.67 and 5.00) reflecting wall length of the structures. Buildability of the 3D printed concrete structures was analyzed based on the maximum decomposition layer and collapse patterns of the structures according to the experimental variables. The nozzle movement speed of 80mm/s and the aspect ratio of 1.67 were favorable for 3D printing in this study. The collapse process of structure due to uneven layer decomposition was also analyzed through the relative displacement measurement of the lower part of the structure during printing.

The Constitutional Directions of Construction Information Management System Between Design and Construction in the Building Project (설계/시공간의 효율적인 정보통합관리를 위한 건설정보처리시스템 구축 방안)

  • Oh Seung-Jun;Lee Kyung-Kook;Chun Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.464-467
    • /
    • 2002
  • In Korea construction project case, architectural construction project is curtailed production because information network process within multidisciplinary isn't smooth. Particularly, the construction is not insufficient about performance, cost and material, construction process, etc. in result various question arises because of design error in construction step. And various mistake is made because communication path within multidisciplinary isn't smooth in architectural design and design change process. This research proposed the optimization method of building system which is satisfied with performance of building, cost, constructability, and proposed the information management plan which is connected with that. And The construction information in this research is restricted to design/construction information which is considerate in design step.

  • PDF

Sensory Evaluation of Quality and Constructability of Cement Mortar for Tile Direct Setting Method Depending on Mix Proportions (타일 떠붙임 시멘트 모르타르의 배합비 변화에 따른 품질 특성 및 시공성에 대한 관능 평가)

  • Hwang, Yin-Seong;Ki, Tae-Kyoung;Han, Dong-Yeop;Noh, Sang-Kyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.1
    • /
    • pp.11-19
    • /
    • 2021
  • The aim of the research is providing a fundamental data on quality and constructability of direct tile setting method depending on various cement to sand ratio for tiling dry cement mortar. A large number of tile setting failures reported is related with the cement mortar and its construction for tiling. Because of different materials of tiles, the properties of tiling dry cement mortar, an adhesive for tiling, can influence on quality and constructability of tiling differently. Practically, the easiest way of controlling the properties of the tiling dry cement mortar is to control the proportion of cement and sand. Hence, in this research, sand to cement ratio (S/C) was controlled. Since there is no standarized method on evaluating performance of dry cement mortar for tiling, a several sensory evaluation methods were suggested and executed. According to the experiments conducted in this research, the adhesive performance of cement mortar for tiles can be different depending on the sides such as tile and substrate. Additionally, depending on S/C, finishability, initial adhesive performance, and tile shifting resistance can be changed for ceramic tile. Therefore, under the conditions of this research, about 5 of S/C can be recommended for appropriate performace of tiling dry cement mortar.

A Study on the Constructability of Modular Steel Frame (해체.조립식 모듈러 철골조 건물의 시공성에 관한 연구)

  • Zheng, Sheng-Lin;Kang, Joo-Won;Park, Sung-Moo
    • Journal of Korean Association for Spatial Structures
    • /
    • v.8 no.4
    • /
    • pp.65-71
    • /
    • 2008
  • The object of this paper is to evaluate on constructability of modular steel frame with the hollow structural steel section to LEB C-shape. A modular building is built with factory-manufacture and site-construction. The advantage of a Modular building presents that enhanced building quality, shortened construction period and easy at an expansion and enlargement for buildings but also has demerits such as size restriction of the modular units according to the Road Traffic Law and Inflexibility of the unit composition. So in this study we use light-weighted structure members with bolted joint for easy Knock-down and traffic, also we evaluated the constructability of this bolted joints type modular buildings.

  • PDF

Improving Constructability for Partnering in Large Hospital Construction Projects (대형병원 프로젝트의 시공성 증대를 위한 파트너링 모델 구축)

  • Kim Sang-Il
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.3 s.19
    • /
    • pp.153-165
    • /
    • 2004
  • Most engineering tasks require collaboration between many users in major hospital construction projects that have many reconstructions. Loss and change orders occurred in factors such as information exchange, misunderstandings, advanced technology in hospital projects. Moreover, changes in context, costs, requirements, deadlines, etc. require negotiation of issues that may modify important project characteristics. The objective of this paper is to reduce reconstruction for the pre-construction process of hospital projects, reconstruction factors were analyzed in recent hospital construction project the system was established in order to solve reconstruction factors, and this system was validated through applying to the real project. Therefore it is a major challenge to make high level of communication and to have mutual understanding.

An Application of Construction Sequence Analysis for Checking Structural Stability of High-Rise Building under Construction (초고층 건물의 시공 중 구조적 안정성 검토를 위한 시공단계해석의 적용)

  • Eom, Tae-Sung;Kim, Jae-Yo
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.22 no.3
    • /
    • pp.211-221
    • /
    • 2009
  • With recent trends of super-tallness, atypical plan shapes and zoning constructions in high-rise buildings, a structural stability of the building under construction is arising as a key issue for design and construction plan. To ensure the structural stability under construction, the differential column shortening of vertical members, the lateral displacement of tower frames, and differential settlement of raft foundation by unbalanced distributions of a tower self-weight before the completion of a lateral load resisting system should be checked by construction sequence analysis, which should be performed by systematic combinations with structural health monitoring, construction compensation program, and construction panning. This paper presents the scheme of zone-based construction sequence analysis by using the existing commercial analysis program, to check the stability of high-rise building under construction. This scheme is applied to 3-dimensional structural analysis for a real high-rise building under construction. The analysis includes real construction zoning plans and schedules as well as creep and shrinkage effects and time-dependent properties of concrete. The simplified construction sequence and assumed material properties were continuously updated with the change on construction schedule and correlations with in-situ measurement data.

Design and Constructibility of an Engineered Cementitious Composite Produced with Cement-based Mortar Matrix and Synthetic Fibers (시멘트계 모르타르 매트릭스를 활용한 섬유복합재료 ECC(Engineered Cementitious Composite)의 설계와 시공 성능)

  • Kim, Yun-Yong
    • Composites Research
    • /
    • v.20 no.2
    • /
    • pp.21-26
    • /
    • 2007
  • This paper summarizes the design procedure and constructibility of an ECC (Engineered Cementitious Composite), which is a synthetic fiber-reinforced composite produced with the Portland cement-based mortar matrix. This study employs a stepwise method to develop useful ECC in construction field, which possesses different fluid properties to facilitate diverse types of processing (i.e., self-consolidating or spray processing). To control the rheological properties of the composite, the aggregates and reinforcing fibers were initially selected based on micromechanical analysis and steady-state cracking theory. The stability and consequent viscosity of the suspensions were then mediated by optimizing the dosage of the chemical and mineral admixtures. The rheological properties altered through this approach were revealed to be effective in obtaining ECC-hardened properties, represented by pseudo strain-hardening behavior in uniaxial tension, allowing the readily achievement of the desired function of the fresh ECC.

Analysis of the Nonlinear Staged Construction in Tall Buildings Considering the Creep and Shrinkage (Creep과 Shrinkage를 고려한 초고층구조물 비선형 시공단계 해석)

  • Park, Tae-Jun;Park, Hak-Kil
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.742-745
    • /
    • 2010
  • 본 논문은 초고층구조물의 해석방법으로 탄성변형과 아울러 시간의존성을 가진 크리프와 건조수축에 의한 비탄성변형을 고려한 비선형 시공단계 해석법을 제시한다. 기존의 초고층구조물 해석에서 주로 행하는 기둥 축소량 해석은 실무자의 경험과 프로그램을 통한 간략화에 맞추어져 있다. 이는 실제 시공 시 발생하는 구조해석 요소들을 충분히 반영하지 못하여 계산 값과 실제 값 사이에 오차가 발생된다. 비선형 시공단계 해석은 실제 시공 때 발생되는 해석변수들을 고려한 단계별 해석의 수행이 가능하며, 시간의 의존성을 가진 creep과 shrinkage의 효과를 함께 고려하여 일괄해석의 문제점을 구조해석 단계에서 실제상황에 가까운 해석을 가능하게 할 수 있다. 이를 위해 시공단계해석이 가능한 범용 프로그램을 이용한 50층 규모의 3차원 골조 프레임 모델 예제 해석을 통하여 기존 해석법들과의 비교, 분석으로 시간의 의존성을 고려한 시공단계해석의 필요성을 제시한다. 본 논문에는 범용프로그램인 SAP2000(ver.14)와 CEB-FIP모델 코드를 사용 하였다.

  • PDF

Case Study on Application of DMU to Civil Infra Structures to Improve Constructibility (토목구조물분야에서 DMU 적용을 통한 시공성개선 사례 연구)

  • Park, Kyoung-Lae;Lee, Kwang-Myong;Lee, Yoon-Bum;Lee, Chung-Hee;Lee, Tae-Young
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2011.04a
    • /
    • pp.320-323
    • /
    • 2011
  • 본 논문에서는 BIM의 기술 중 하나인 DMU(Digital Mock-Up)을 실제 프로젝트에 적용하여 업무 효율에 기여한 결과를 소개한다. 삼성물산 건설부문의 경우 DMU는 건설 프로젝트의 입찰단계 및 시공계획 단계에서 적용되어 많은 성과를 거두었다. 입찰단계의 경우 대상 프로젝트의 교량, 터널 등의 구조물을 실제와 같은 지형조건 및 설계 조건으로 모델링하여 프로젝트의 개요 파악, 정보의 공유, 선정된 공법의 효과 분석 등에 적용하였으며 시공단계에서는 주로 복잡한 구조물의 철근 간섭 검토 및 효율적인 배근 방법 분석을 위한 도구로 사용되었다. 적용결과 공기단축, 원가절감, 시공성 향상에 기여하였으며, DMU는 향후 프로젝트 관리도구로 통합되어 구조물공사의 원가절감 및 생산성 향상에 기여할 것으로 예상된다.

  • PDF

A Study on Controlling the Negative Reaction of Cable Stayed Bridge Considering Constructability and Economy : Vam Cong Cable Stayed Bridge in Vietnam (시공성 및 경제성을 고려한 사장교 부반력 제어 연구 : 베트남 밤콩 사장교 사례)

  • Lee, Yong-Jin;Lho, Byeong-Cheol;Kim, Chang-Kyo;Bae, Sang-Woon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.18 no.5
    • /
    • pp.87-95
    • /
    • 2014
  • Cable stayed bridge is supported by cables and the negative reaction occurs by cables at anchor pier. To solve this problem, the proper side span ratio and the negative reaction measure of anchor pier are needed. And structural system of cable stayed bridge is determined by solution of the negative reaction as installation of the intermediate pier, counterweight and so on. In feasibility study, Vam Cong bridge was planned as 5 span cable stayed bridge. However, it was changed to 3 span cable stayed bridge in detailed design because of constructability and economy. The intermediate pier was excluded in order to improve the constructability, and side span ratio increased to control the negative reaction. As a result, Vam Cong bridge secure constructability, structural safety, and efficiency.