• Title/Summary/Keyword: 시공성개선

Search Result 775, Processing Time 0.041 seconds

The Improvement of Work Structure in the Private Investment SOC Project (민자 SOC사업의 시공단계 업무체계 개선방향)

  • Kim Daejin;Shin Seungtae;Lee Younghwan;Woo Sungkwon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.486-489
    • /
    • 2004
  • To enlarge the international competition and construction productivity, the domestic construction market attracts the private capital and expands the facility of :iocial Overhead Capital(SOC). However, the application of the business system used at the public project didn't utilize the effect of social overhead capital. It caused problems that parties' business was inefficient and their allotment of the risk was inadequate. This paper presents the course to reorganize the business system which the coincides with the origin aim of the SOC. For the reformation of the supervisor's work scope and business system and the government's overall project management, in other words, this paper proposes the professional organization to replace the superintendence and the formation of optimal business system. This paper confirms the privity of contract among parties of SOC project and parties' work scope and system between relative laws and concession agreement that government made a contract with Special purpose Company (SPC).

  • PDF

Applicability Evaluation of Precast Deck to the Maglev Guideway System : Mock-Up Construction Test (프리캐스트 바닥판의 자기부상열차 가이드웨이 시스템 적용성 평가 : 모의 시공 실험)

  • Jin, Byeong-Moo;Kim, In-Gyu;Kim, Young-Jin;Oh, Hyung-Chul;Ma, Hyang-Wook;Lee, Yung-Seok
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.57-60
    • /
    • 2008
  • Maglev is a system that a train runs levitated above a rail. Therefore it is very important to maintain a constant levitation gap for achieving serviceability and ride comfort. This study is a cooperation research subject of the 3-1 subject, performance improvement of maglev track structures, of the Center for Urban Maglev Program in Korea, started in 2006. The aim of this study is development of rapid constructions of bridge superstructure for maglev. At present, precast deck is widely used because of its superiority to cast-in-place concrete on quality and the term of works. The research group suggested basic systems of maglev guideway with PSC-U type and trapezoidal open steel box type girder, and precast deck, cooperating with Korea Railroad Research Institute, the managing institute of the 3-1 subject. In this study, a mock-up consisted of girders, decks and rail was fabricated and test was performed for constructability, serviceability and maintenance evaluation of PSC U-type girder, precast deck, and new guide rail system.

  • PDF

A Suggestion for Improving the Demolition Efficiency of Building Structures (구조물 발파 효율 개선 방안)

  • 안명석;최영천;최원규
    • Explosives and Blasting
    • /
    • v.15 no.1
    • /
    • pp.26-35
    • /
    • 1997
  • The research on the safe and efficient demolition technique of building structure is required due to rapid increase in structures which has the problems of safety and endurance. The techniques of blasting and operation and parameters affecting the efficiency of demolition were analyzed to maximize demolition efficiency. And successful, unsuccessful and near-miss demolition cases in Korea have been investigated so that demolition operation can be safe and accurate.

  • PDF

법령과 고시 ② - 최저가낙찰제가 종합심사낙찰제로 개정

  • 대한기계설비건설협회
    • 월간 기계설비
    • /
    • s.306
    • /
    • pp.94-98
    • /
    • 2016
  • 300억원 이상의 국가 및 공공기관 발주공사에 대해 최저가낙찰제를 대신하여 종합심사낙찰제 전면 실시 등의 내용을 담은 국가계약법 시행령이 개정되어 2016년 1월 1일부터 시행에 들어갔다. 종합심사낙찰제는 가격 뿐만 아니라 공사수행능력, 사회적책임을 종합 평가하여 낙찰자를 선정하는 제도로 기존의 최저가낙찰제에서 발생한 덤핑낙찰 및 이로 인한 잦은 계약변경, 부실시공, 저가하도급, 임금체불, 산업재해 증가 등의 문제점을 해소하기 위해 도입된 제도이다. 종합심사낙찰제 도입에 따라 공사 품질이 제고됨으로써 생애주기(lifecycle, 유지보수비용 등을 포함) 측면에서의 재정효율성 제고를 비롯하여 불공정 하도급 관행 개선 등 건설산업의 생태계 개선과 함께 시공결과에 책임짐으로써 기술경쟁 촉진 등 건설산업의 경쟁력 강화 효과도 기대된다. 또한 국가계약예규도 개정되어 주계약자관리방식에 의한 공동계약(주계약자 공동도급)이 최저가낙찰제에서 종합심사낙찰제로 전환됐다.

  • PDF

Analysis of Requirements for Improvement of the Work-Life Balance of Construction Managers (건축공사 현장관리자의 워라밸 개선에 대한 요구사항 분석)

  • Lim, Hyeong-Eun;Noh, Ju-Seong;Kim, Jae-Yeob
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.124-125
    • /
    • 2018
  • The objective of this study is analyzing of requirements for improvement of the work-life balance of construction managers working in Korean construction companies. A survey has been conducted to analyze the requirements for improvement of construction managers. The survey was conducted on construction managers working in the field of architectural construction. 59 field managers working in 18 Korean construction companies responded to the survey. Upon analysis of the survey, the working hours were excessive and recreational time was very poor for the construction managers. There were differences in the answers regarding the areas that require improvement in the working conditions based on the age groups of the construction managers. A majority of young technicians selected that the recreational time and content of work require improvement, and technicians with a lot of experience selected that the stability of occupation and wage require improvement.

  • PDF

A Case Study of BIM-based Framework on Constructability Tasks (BIM기반 골조공사의 시공성분석 업무 적용사례에 관한 연구)

  • Lee, Seung-Il;Kwon, Nam-Ha;Cho, Young-Sang
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.5
    • /
    • pp.45-54
    • /
    • 2010
  • Recently more and more construction projects have become high-rise, complex and intelligent. Accordingly, such projects require an integrated management system for tasks, with a lean approach to construction with work processes for management and productivity. In particular, Construction Information Technology (CIT) fields are concerned with Building Information Modeling (BIM), which represents the process of generating and managing building data during its life cycle. Constructability research has progressed for the project goal which is a cost-time-quality of optimization by integrated construction knowledge and experience. However, the current constructability process has not been performed efficiently, as the existing 2D drawings and papers lack consistent and accurate information, it is difficult to share the contents of work, and the use of information is inefficient. This study proposes that the reformation and enhancement of BIM-based constructability work process can lead to brilliant performance in the framework of the construction phase through achieving collaboration between the design team and the workers at the site.

A Case Study about Problem EPS Plastic Displacement on High Embankment (고성토 지반의 EPS 소성변형 문제점에 대한 사례연구)

  • Shin, Chang Gun;Seo, Jeong You;Lee, Jong keyn;Chae, Min Lee
    • Journal of the Korean GEO-environmental Society
    • /
    • v.12 no.11
    • /
    • pp.5-12
    • /
    • 2011
  • Numerous studies on the improvement of low strength for soft ground have been performed. EPS, light weight filling material, is used at the study site for stability on consolidation settlement. However, several problems such as settlement of pavement layer and damage of curb occurs. The elevation is lower 1 m than that of designed value by consolidation. It is caused by excessive load during construction. In this study, problems due to overloading on the soft ground where the EPS is used were analyzed and some cases for reasonable improvement method were described. From the results, instructions for design and construction are suggested.

Consideration of Geosynthetics Chemical Resistance Test for Long-Term Performance Evaluation (장기성능 평가를 위한 토목섬유 화학저항성 시험 고찰)

  • Jeon, Han-Yong;Jang, Yeon-Soo
    • Journal of the Korean Geotechnical Society
    • /
    • v.25 no.7
    • /
    • pp.55-64
    • /
    • 2009
  • In this study, improved test methods, which consider the real site test conditions, were suggested to measure for geosynthetics chemical resistance. For this purpose index and performance tests were done to specify and regulate the test method most approaching to the installation condition and accelerated model by Arrhenius equation was applied to interpretate the experimental data. Through the analysis and comparison of the overall experimental results, we could suggest the possibility and setup of the advanced chemical resistance test method for geosynthetics fitting to the field installation conditions.

Questions and Solutions on Repair of Lime-Soil Consolidation in Traditional Buildings (전통 건축물 석회다짐층 보수 시공시의 문제점 및 개선 방안)

  • Kim, Jin-Man;Kwak, Eun-Gu;Suh, Man-Cheol;Cho, Heon-Young
    • 한국문화재보존과학회:학술대회논문집
    • /
    • 2002.02a
    • /
    • pp.21-31
    • /
    • 2002
  • Lime-soil consolidations are very important as structural material, bonding material, waterproofing material, and finishing material in korea traditional buildings. In this study, we investigated site application trouble in korea traditional buildings being repaired or restored, and propose following solutions. 1) To diminish quality variation occurred by slaking quick-lime in site, it is desirable to use slaked-lime for lime-soil consolidation. 2) For uniform construction of lime-soil consolidation, we would recommend builders to use mixer to be uniform mixture, premixed type materials and compacting machine in field, 3) and to use rigid suitable temporary construction as scaffold for preventing traditional buildings from additional damage occurred in demolition and construction of a layer of lime-soil consolidation of a roofing. 4) For suitable repair of traditional buildings, it is necessary to specify definitely materials and construction methods suggested by the standard specifications for repair of the cultural property.

  • PDF

Design of Large-Diameter Drilled Shaft Bearing on Gravel Layer (대구경 현장타설말뚝의 자갈 지지층 적용 설계사례)

  • Lee, Jae-Hoon;Joo, Soo-Il;Ryu, Tae-Ha;Choi, Jae-Ho
    • 기술발표회
    • /
    • s.2006
    • /
    • pp.115-132
    • /
    • 2006
  • 본 글은 부산-김해간 경량전찰 건설공사의 기초설계시 현장타설말뚝 기초의 지지층을 모래자갈층으로 적용한 사례이다. 낙동강 유역은 퇴적층이 발달하여 풍화암 이상의 기반암층이 지표하 60~80m 이후에서 출현하며, 40m 이상의 심도에서 매우 조밀한 상태의 모래자갈층이 10-20m 두께로 분포하고 있어, 모래자갈층을 관통하여 기반암에 말뚝기초를 지지할 경우 기초공사에 상당한 기간이 소요될 뿐만 아니라, 시공성과 경제적인 측면에서 매우 불리하다. 이에 대한 개선방안으로 대구경 현장타설말뚝을 N치 50 이상의 조밀한 상태의 모래자갈층에 지지하였으며, 인근현장의 적용사례, 기초 구조물 안전성 검토 및 현장재하시험 등의 비교분석을 통하여 모래자갈 지지층의 적정성을 확인하였다. 따라서, 풍화암 이상의 지지지반 출현심도가 60m 이상으로 매우 깊고, 지지지반 상부에 모래자갈층이 두껍게 분포하는 경우에는 모래자갈층을 말뚝기초의 지지층으로 활용하는 방안이 시공성 및 경제성 측면에서 합리적이라 판단된다.

  • PDF