• Title/Summary/Keyword: 시공비용

Search Result 680, Processing Time 0.025 seconds

Cost Performance Evaluation Framework through Analysis of Unstructured Construction Supervision Documents using Binomial Logistic Regression (비정형 공사감리문서 정보와 이항 로지스틱 회귀분석을 이용한 건축 현장 비용성과 평가 프레임워크 개발)

  • Kim, Chang-Won;Song, Taegeun;Lee, Kiseok;Yoo, Wi Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.1
    • /
    • pp.121-131
    • /
    • 2024
  • This research explores the potential of leveraging unstructured data from construction supervision documents, which contain detailed inspection insights from independent third-party monitors of building construction processes. With the evolution of analytical methodologies, such unstructured data has been recognized as a valuable source of information, offering diverse insights. The study introduces a framework designed to assess cost performance by applying advanced analytical methods to the unstructured data found in final construction supervision reports. Specifically, key phrases were identified using text mining and social network analysis techniques, and these phrases were then analyzed through binomial logistic regression to assess cost performance. The study found that predictions of cost performance based on unstructured data from supervision documents achieved an accuracy rate of approximately 73%. The findings of this research are anticipated to serve as a foundational resource for analyzing various forms of unstructured data generated within the construction sector in future projects.

Analysis of Defect Repair Cost by Work Type based on Defect Inspection of Apartments (공동주택의 하자진단에 기초한 공종별 하자보수비용의 분석)

  • Lee, Jin-Eung;Kim, Byung-Yun;Jeong, Byung-Joo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.5
    • /
    • pp.491-500
    • /
    • 2015
  • This study investigated defect status by work type, based on the report data of defect inspection results, acquired by consumers' request to safety inspection agencies, before the expiration of legal defect repair warranty period. In fact, the data was not acquired by centering on suppliers, namely, construction companies in relation with the defects becoming causes to increase construction cost of apartments. This study aims to provide objective and basic data for quality improvement at construction stage and for solution to defect disputes. The study results are presented below: (1) The number of defect cases occurring from architectural work among total work types were 1,986, defect occurrence rate was 62.5%, and defect repair cost was KRW $25,851/m^2$, which stood at 78.2% of the total work types. This means the defect occurrence rate and defect repair cost in architectural work are bigger than those of other work types. (2) Major defects in architectural work were revealed in the following order: cracks from frame work, inferior interior finishing work, inferior finishing work of plaster/masonry works, water leak/damage from waterproof work and withering/omission from landscape work. The total repair cost of the major selected defects was KRW $12,220/m^2$, and was analyzed to take up 37% of the total defect repair cost.

Economic Analysis of Box Mechanical Behavior Materials Using LCC Analysis (LCC를 고려한 BOX구조물 뒷채움 재료의 경제성 분석)

  • Park, Young-Min;Kim, Soo-Yong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.6
    • /
    • pp.40-47
    • /
    • 2009
  • The lightweight bubble mixture soil is used for soft ground rear-filling material by applying reduced weight on structure. However, comparing with the general soil, it is not applied in domestic because of initial phase cost of construction. General soil, which has lower initial phase cost is usually used for rear-filling, but the use of overlay method of general soil is reduced as the number of layers increases. Especially box structure placed in soft ground or the overlay method when gap near pier rear-filling can be replaced with temporary alternative method, however, it can't be a solution to gap by generation of extra weight of thickness of overlaying. Therefore, execute LCC analysis of two alternative-the general and the lightweight bubble mixture soils, which are rear-filling material of box structure- and present economical analysis in order to make resonable decision from the economics. As a result, although the lightweight bubble mixture soil takes higher initial phase cost than the general soil, it has been analyzed to procure economical efficiency by having less cost of maintenance.

The Numerical Analysis of Two-Dimensional Electrokinetic Remediation Characteristics Dependent on Electrode Configurations (전극배치에 따른 2차원적 동전기 정화 특성의 수치해석)

  • Kim, Soo Sam;Han, Sang Jae;Kim, Byung Ill
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.5C
    • /
    • pp.291-301
    • /
    • 2006
  • In this study the characteristics of electrokinetic remediation, which is dependent on a various electrode configuration, was predicted from 2-D numerical analysis program (HERO-2D). Based on the predicted results for one dimensional and two dimensional electrode configurations, the optimized electrode configuration was determined by analyzing remediation efficiency, consumed electric power, installation cost of electrode and so on. When proposed electrode configurations were applied for in-situ remediation of the soils contaminated by heavy metals, the electrode configuration of high remediation efficiency should be chosen in case the high removal effect would be required, and one dimensional electrode configuration should be chosen in case the hard field works would be expected. Because the rectangular electrode configuration is better than others for consumed electric power, remediation efficiency per unit power, installation cost of electrode and so on, it can obtain the best results for the cost reduction.

Estimation of Optimum Maintenance Cycle for the Chloride Damaged RC Structure (염해를 입은 RC 구조물의 최적 보수주기 산정 기법에 관한 연구)

  • Yun, Sun-Young;Lee, Han-Seung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.235-236
    • /
    • 2010
  • Since many structures in the sea environment are damaged by chloride, appropriate repair strategy is required. Therefore in the paper, optimum period for the RC structure's repair is calculated with consideration of economic efficiency. Moreover, when the concrete members are repaired with the other material such as polymer mortar forr section restoration, their expected service life also calculated to predict more accurate repair period during the life span.

  • PDF

User Interface Design for Life Cycle Cost Estimation System (LCC 산정 시스템의 사용자인터페이스 설계)

  • Yang, Hoe-Ryeong;Shin, Han-Woo;Kim, Tae-Hui
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.149-150
    • /
    • 2012
  • According to the increase of demand of the deteriorated building. The interest of the building's maintenance is continually increased, so studies about how to increase building's stability & prolonged life span are increased. This study's purpose is to maintain building's function, so we suggest a protocol type system of UI to estimate reasonable planning of demand of repair & replacement and to distribute budget.

  • PDF

Analysis of Major Factors of Window Work in Construction Phase Considering Recurrence of Defects in the Maintenance Phase (유지관리단계의 하자 재발생을 고려한 창호공사 시공단계의 중점관리요소 분석)

  • Jeong, U Jin;Kim, Dae Young;Lim, Jeeyoung;Park, Hyun Jung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.6
    • /
    • pp.653-664
    • /
    • 2021
  • As the construction standards for energy-saving eco-friendly housing have recently been strengthened, the proportion of window work has increased with the demand for high-efficiency housing. Windows have high frequency of use, and there is the potential for many defects to occur depending on the characteristics of construction. According to a government agency's survey of defects in public rental apartment housing, defects in the windows work accounted for the highest portion of complaints received. Accordingly, related previous studies were considered, and it was found that the existing studies in Korea lacked research that reflected the construction characteristics of window work and the importance of maintenance. In addition, existing overseas studies considered both the constructor and the resident's position, considering the cost aspect together, and showed a trend of structuring the relationship between defects and causes. Therefore, this study will analyze the causes of defects that can occur in the construction phase of the windows work, reflect the construction characteristics, and derive major factors that consider the importance of maintenance based on the possibility of recurrence after repairing defects. Ultimately, this research will contribute to preventing defects in the construction phase and reducing maintenance costs by presenting a highly effective defect management plan through selecting the major factors for each defect type that can be intuitively judged by analyzing the causal relationship between defect types and causes.

A Study on the Influencing Factors for the Establishment of a Public Asset Management System Based on AHP-ISM (AHP-ISM기반의 공공자산관리 관리체계 영향요인 도출 연구)

  • Lee, Han-Sol;Lee, Ung-Kyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.4
    • /
    • pp.403-414
    • /
    • 2022
  • Many studies have been conducted on asset management of public facilities, as the importance of such management has been increasing. This basic study aims to present strategies for the practical use of public asset management, and seeks to propose efficient management and utilization measures from a cost perspective by comparing and analyzing the importance and impact relationship between cost items for public asset management. In this study, 19 sub-items and the top 4 items were chosen by deriving cost factors based on the previous literature. A survey was conducted, and the results of the survey were analyzed by using the Analytic Hierarchy Process(AHP) and Interpretive Structural Modeling (ISM) methods. The AHP was used to derive the priority between items, and ISM was used to identify major groups and mutual influences. As a result, those items showing both high priority and high importance, such as user cost, dismantling/disposal cost, replacement cost, maintenance/repair cost, etc. are determined as priority items to be considered for public asset management of public facilities. Also, it is necessary to minimize the impact on other items in public asset management by those items which are impacted less by other items but have significant impact on the items such as initial construction costs, conceptual design costs, construction costs, and supervision costs. It is expected that the results and analysis methods presented in this study can be used to provide strategies for asset management of public facilities.

Field Instrumentation of Load of R/C Apartment under Construction according to Construction Stage (시공단계에 따른 RC공동주택의 동바리 하중 계측)

  • Oh, Jae-Keun;Kang, Su-Min;Kim, Ook-Jong
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.117-120
    • /
    • 2008
  • Recently, according to the increasement of high-rise building construction and domestic situation, requirements of rapid cycle construction are increasing. For more economical and rapid cycle construction, it is required to reduce formwork cost. So formwork have to be stripped as soon as possible. But as fresh concrete is loaded with construction load, it is likely that the structure will have problems with safety and serviceability. To reduce construction cycle economically, safety and serviceability of structure against construction load have to be considered. But as behavior of structure under construction is so complicated, behavior of structure has to be investigated according to construction stage. Therefore, through field instrumentation of apartment, behavior of structure under construction was analyzed.

  • PDF

A Study on Improvement of Road Compaction Method in Soft Ground (연약지반 상 노상다짐 방법 개선에 대한 연구)

  • Choi, Hyeonsuk;Jang, Hohun
    • The Journal of Engineering Geology
    • /
    • v.29 no.4
    • /
    • pp.427-437
    • /
    • 2019
  • The purpose of this study is to improve construction cost, time, and field management when constructing a road on soft soil foundation by eliminating extra-banking of subgrade layer after completion of the consolidation process. The subgrade layer was pre-constructed before the soft ground improvement. And then it was confirmed by the field test that the compaction effect was maintained or not after consolidation settlement. As a result of the experiment, all subgrade layers were kept constant except for the top subgrade layer. So it would be advantageous to secure economical and practical in road construction if subgrade layers were constructed exclusive of the top subgrade layer.