• Title/Summary/Keyword: 시공방법론

Search Result 162, Processing Time 0.03 seconds

Estimation of Cycle Time for Construction Process of NATM Tunnel by using RFID Technology (RFID기술을 이용한 NATM터널 작업 프로세스의 사이클타임 산정방안 연구)

  • Park, NamJin;Kim, HyounSeung;Moon, HyounSeok;Kang, LeenSeok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.1D
    • /
    • pp.41-49
    • /
    • 2012
  • Radio Frequency Identification(RFID) technology, which replace BAR CODE technology that has been widely utilizing in the field of the manufacturing industry for a long time, has been proven in the whole industries including national defense, transportation, and construction as well as manufacturing industry. Recently, with this trend, researches for adapting the RFID technology have been attempting continually centering on the architectural project in the construction industry. However, those researches are mainly focusing on the experimental utilization such as simple activity and material management. To solve these issues, this study demonstrated methodologies for adapting the RFID technology by the construction steps aiming to analyze cycle time of five types of construction process to the NATM method of tunneling work. Besides, the application of RFID technology in civil engineering work was verified by demonstrating the suggested methodology to actual sites. Therefore, it is expected that the suggested methodology will be utilized for predicting the progress rate and establishing of follow-up work plans, and the site applicability of the RFID technology will be expanded to the civil engineering projects.

Economic Evaluation System for Deteriorated Military Facilities (노후 군시설물의 경제성 평가 시스템)

  • Jang, Won-Suk;Lim, Tae-Kyung;Lee, Dong-Eun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.2
    • /
    • pp.181-192
    • /
    • 2013
  • Given both structural safety and economic benefits of aging facilities, remodelling of the existing facilities is preferable to reconstruction. This recognition provides an opportunity to reduce the commitment of resources and national budget. However, when a subordinate troop asks for remodeling or reconstruction of a deteriorated facility, it is difficult to ensure the consistency and objectivity in the process of decision making for the alternatives due to the absence of systematic and quantitative rating methodology. Their economic evaluation methodology only exists in a manual format. Thus, further research is required for converting the methodology into an automated system in view of practicality such as rapid and accurate data processing. The contributions of this study are as follows: 1) Literature review found out a representative economic evaluation model focused on military facilities, and comparative analysis with a similar study identified the strength and weakness. 2) this study presented how to convert the theoretical framework which enables to solve a specific subject matter into an automated system. 3) it developed a user friendly interfaces which consist of four functional modules by considering the usability and accessibility of the system user. 4) the developed system was verified by a case study in terms of four kinds of performance indicators.

Assessment for Extending Span Ranges of PSC Girder Bridges : II. Application to a Sample Bridge (PSC 거더교의 장경간화 평가 기법 : II. 예제 분석)

  • Jeon, Se Jin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.3A
    • /
    • pp.243-250
    • /
    • 2009
  • The purpose of this study is to investigate several strategies that can be used to extend the span of conventional PSC girder bridge and to propose a systematic procedure to evaluate the effect of each strategy on the span. In the preceding companion paper, fundamental equations were derived which constitute the assessment graphs and a possible domain for the design. Quantitative evaluation for extension of the span follows here by adopting a sample PSC girder bridge. It apparently shows a number of advantages of the proposed scheme in finding out why and how each strategy contributes to the span extension and in suggesting further improvement for a longer span. The results imply that increasing the strength of a girder, the multistage prestressing with the secondary tendons prestressed before composite action with a deck, and Decked PSC girder are very effective among the strategies examined. It is expected that the span of the PSC girder bridge can be well extended up to 50 m to 70 m which corresponds to a span of the conventional box girder bridges.

Case History of Sea Dyke Construction Using Geotextile Mat (토목섬유매트를 활용한 호안축조공사 사례 연구)

  • Park, Jeong-Jun;Kim, Sung-Hwan;Shin, Eun-Chul
    • Journal of the Korean Geosynthetics Society
    • /
    • v.7 no.2
    • /
    • pp.7-13
    • /
    • 2008
  • Geosynthetic damage has attracted a major attention since the introduction of geotextiles for civil construction applications. Geotextile is one of the most useful and effective polymer material in civil construction works and the main function of geotextile is separation, reinforcement, filtering and drainage. Recently, because of the shortage of natural rock, traditional forms of river and coastal structures have become very expensive to build and maintain. This study tries to suggest the method of estimating valid stitching rate and the methodology of sea dyke construction over soft soils for more reasonable application of geotextile mat by studying tensile strength, bursting strength, punching strength, tear strength that are considered when analyzing and designing geotextile mat of a field.

  • PDF

Sight Distance at Crest Vertical Curves Under Consideration of Construction Errors (볼록형 종단곡선에서 시공오차를 고려한 정지시거에 관한 연구)

  • Lee, Myeong-Han;Kim, Dong-Nyong
    • Journal of Korean Society of Transportation
    • /
    • v.23 no.8 s.86
    • /
    • pp.153-162
    • /
    • 2005
  • This study is carried out to evaluate the sight distance change due to construction errors of vertical crest curves. Various design speeds and grades as well as various size of construction errors are incorporated in this study. After showing theoretical methodology numerical results are compared and analysed for the given ranges of parameters. New vertical curve change rate(m/%) is suggested to guarantee minimum sight distance under construction errors. As to the results, the reduction of sight distance are $2.8{\sim}21.3m$ at 120km/h, $2.0{\sim}15.1m$ at 100km/h, $1.4{\sim}10.6m$ at 80km/h, $1.0{\sim}7.5m$ at 60km/h $0.5{\sim}3.9m$ at 40km/h. Vortical curve change rates need to be increased about $6{\sim}25%$ to provide minimum stopping sight distance according to design speed.

Methodology for Selecting Optimal Earthmoving Haul-Routes using Genetic Algorithm (유전알고리즘을 이용한 토사운반 최적경로 탐색 방법론)

  • Gwak, Han-Seong;Yi, Chang-Yong;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.4-5
    • /
    • 2014
  • Planning earthmoving haul-route must be preceded for appropriate equipment fleet assignment. However, traditional haul-route planning methods have limitations relative to practical usage because multiple variables (e.g., grade/rolling resistance, length, equipment's weight etc.) should be considered at a time. Genetic algorithm(GA) was introduced to improve these traditional methods. However, GA based haul-route planning method still remains in inefficiency relative to computation performance. This study presents a new haul-route searching method that computes an optimal haul-route using GA. The system prototype is developed by using MATLAB(ver. 2008b). The system identifies an optimal haul-route by considering equipment type, soil type, and soil condition.

  • PDF

Contingency Estimation Method based on Stochastic Earned Value Management System (추계적 EVMS 기반 예비비 산정 방법론)

  • Gwak, Han-Seong;Choi, Byung-Youn;Yi, Chang-Yong;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.72-73
    • /
    • 2018
  • The accuracy of contingency estimation plays an important role for dealing with the uncertainty of the financial success of construction project. Its' estimation may be used for various purposes such as schedule control, emergency resolve, and quality expense, etc. This paper presents a contingency estimation method which is schedule control specific. The method 1) implements stochastic EVMS, 2) detects a specific timing for schedule compression, 3) identifies an optimal strategy for shortening planned schedule, 4) finds a probability density function (PDF) of project cost overrun, and 5) estimates the optimal contingency cost based on the level of confidence. The method facilitates expeditious decisions involved in project budgeting. The validity of the method is confirmed by performing test case.

  • PDF

Methodology Developments based on CO2 Emission Information from Construction Equipment for Greenhouse Gas Regulations (온실가스 규제에 대비한 건설장비 이산화탄소 배출량정보 활용방법론 개발)

  • Go, Jee-Eun;Lee, Jin-Woo;Chae, Yoon-Byung;Han, Seungwoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.35-36
    • /
    • 2018
  • According to the nation's greenhouse gas emission statistics, greenhouse gas emissions have been stiffly increasing. Accordingly, the importance of CO2 reduction is more getting focused over the world. This trend makes the construction equipment be considered as a major target of reduction due to the large volume of emission. This study suggests the feasible methodology for estimating CO2 emission from construction equipment and for being easily applied on the job sites. The methodology is based on the collection from the segmented CO2 emission information of construction equipment. This study allows site personnels to estimate the total amount of CO2 and to take appropriate actions for reasching the environmental regulations.

  • PDF

Crashing Method for Repetitive Project hybridizing concurrent engineering and LOB (동시공학 및 LOB를 사용한 반복 프로젝트 공기단축 방법론)

  • Min, Gyu-Tae;Lee, Hong-Chu;Li, Xian-Jun;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.41-42
    • /
    • 2018
  • Various methods that crash the project completion time have been studied. Line-of-Balance (LOB) is well accepted as a useful method that enables steady resource utilization without frequent hire-and-fire of resources for a project having repetitive units. Existing studies involved in LOB-CPM focuses on thesis such as resource leveling and optimization in construction scheduling community. However, crashing methods are not arrived at a full maturity in LOB scheduling, because no one handles steady resource utilization while keeping activity-relationships. This paper proposes a method that crashes project completion time by hybridizing concurrent engineering and LOB scheduling without using additional resources.

  • PDF

Evaluation of Safety Items in Building Demolition Works Utilizing AHP Method (AHP 방법론에 의한 건축물 해체공사의 안전관리 개선사항 평가)

  • Cha, Hun-Ju;Choi, Jong-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.7 no.3
    • /
    • pp.99-105
    • /
    • 2007
  • Current domestic safety training in building demolition works are heavily relies on the limited number of experienced people and thus, it implies the demand of preparing the systematic program and stricter yardstick is soaring. Questionnaire survey and in-depth interview results with demolition engineers were analyzed adopting AHP methodology. Analysis results reveal that the most urgent items which required improving current safety training system are to increase investment level, prepare more structured training system and secure experts, and so on. In addition, field labors and managers strongly requested the improvement of environment-related safety matters. Based on the evaluation results, guidelines were suggested for the improvement of safety training system in building demolition works.