• Title/Summary/Keyword: 시공단계

Search Result 1,348, Processing Time 0.027 seconds

Study on Establishing Comprehensive Management Measures to Ensure Stability of Existing Metro when Constructing Ground Structures Adjacent to Subway (지하철 인접 지상구조물 설치시 기존 지하철 안정성 확보 위한 종합관리대책 수립 연구)

  • Jae-Hong Lim;Guk-Hwan Cho
    • Tunnel and Underground Space
    • /
    • v.34 no.3
    • /
    • pp.196-207
    • /
    • 2024
  • In this study, a comprehensive management plan was proposed to ensure the stability of the existing subway when constructing ground structures adjacent to the subway. In the first step, the measurement inspection cycle is selected through proximity evaluation, in the second step, the stability of existing subway and station structures such as displacement and stress is reviewed through 3D numerical analysis considering the construction stage and groundwater influence, and in the third stage, the safety of train operation was reviewed by examining the track stability, and based on the numerical analysis results in the fourth stage, the displacement concentration section was selected as an intensive management section and it was proposed that intensive measurement management be performed.

감사원, 2단계 부실공사 방지대책

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.51
    • /
    • pp.40-42
    • /
    • 1994
  • 감사원은 준공된 부실공사에 대해 관련공직자의 책임추궁을 대폭 강화하고 부실시공업체에 대해서도 제재를 강화해 해당업체가 더이상 건설업계에 발을 붙이지 못하게 할 방침이다. 또한 이같은 영업활동제한과는 별도로 부실시공부분은 원칙적으로 철거$\cdot$재시공하도록 하고, 시설물의 내구성 및 기능 저하땐 손해보전요구도 병행해 부실시공업체는 업계생존이 불가능하도록 할 방침이다. 그리고 준공검사와 하자검사제도를 품질검사위주로 전환하고 이를 담당할 전문검사기관을 육성하는 등 부실시공 방지대책을 강력히 추진하기로 했다. 본고는 감사원의 $\ulcorner$2단계 부실공사 방지대책$\lrcorner$ 추진방향을 종합적으로 살펴본 내용이다.

  • PDF

시스템정보-일반건설사, 현장관리시스템 구축(3)

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.2 s.211
    • /
    • pp.56-60
    • /
    • 2008
  • 일반건설사들이 최근 시공 합리화를 통한 고부가가치 창출을 위해 건설현장의 전 과정을 데이터화한 정보시스템 개발 및 도입에 들어갔다. 건설사들이 선보인 현장관리시스템은 건설 프로젝트의 전 과정을 데이터화 및 공유하는 건설관리 정보화 시스템이다. 최근 들어 건설 산업의 전산화·정보화는 건설업무 진행 단계인 기획, 설계, 시공, 유지관리 절차에 따라 다양한 형태로 개발·활용되고 있다. 특히 시공단계에서 협력업체들 간의 다양한 정보공유로 불필요한 노동력 및 재정 낭비를 줄여 생산성 향상을 꾀하고 있다. 이번호에는 롯데건설(주)의 현장관리시스템을 살펴본다.

  • PDF

일반건설사, 현장관리시스템 구축(1)

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.9 s.206
    • /
    • pp.42-45
    • /
    • 2007
  • 일반건설사들이 최근 시공 합리화를 통한 고부가가치 창출을 위해 건설현장의 전 과정을 데이터화한 정보시스템 개발 및 도입에 들어갔다. 건설사들이 선보인 현장관리시스템은 건설 프로젝트의 전 과정을 데이터화 및 공유하는 건설관리 정보화 시스템이다. 최근 들어 건설 산업의 전산화·정보화는 건설업무 진행 단계인 기획, 설계, 시공, 유지관리 절차에 따라 다양한 형태로 개발.활용되고 있다. 특히 시공단계에서 협력업체들 간의 다양한 정보공유로 불필요한 노동력 및 재정 낭비를 줄여 생산성 향상을 꾀하고 있다. 이번호에는 GS건설(주)의 현장관리시스템을 살펴본다.

  • PDF

Identifying Construction Engineering Tasks at the Design Phase for Enhancing Constructability in High-rise Building Construction - Focused on Temporary Work - (고층 건축공사의 시공성 향상을 위한 설계단계의 시공엔지니어링 업무 도출 - 가설공사를 중심으로 -)

  • Lee, Jin-Woong;Cho, Kyu-Man;Kim, Tae-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.5
    • /
    • pp.453-463
    • /
    • 2017
  • Due to the increase in the size of buildings and scale, the importance of construction engineering that reflects the constructability from the design stage of the project is increasing. Especially, engineering efforts related to facilities, equipment and construction methods for temporary work at the design stage can significantly contribute to improvement of constructability and project performance. The purpose of this study is to derive construction engineering tasks on temporary work at the design phase of the high-rise building projects. 27 preliminary tasks were firstly investigated through literature review and experts' group interview, and the necessity and importance analysis of each tasks were then performed based on questionnaire survey. Most of the tasks related to plans on structural framework and lifting equipment were analyzed as relatively more important ones. Lastly, 21 engineering tasks, which are classified into 5 factors, were proposed through factor analysis. The factors were determined as 1) structural framework, measurement and circulation, 2) lifting equipment and pumping, 3) space zoning, 4) water supply, 5) temporary facility, electric power supply and lighting. The results of this study can be used as basic data for establishing efficient work process of construction engineering on temporary work at the design phase.

Three Dimensional Construction Stage Analysis and Deformation Monitoring of a Reinforced Concrete Highrise Building (철근콘크리트조 초고층건물의 3차원 시공단계 해석 및 시공중 변형 계측)

  • Jeong, Daegye;Yu, Eunjong;Ha, Taehun;Lee, Sungho
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.27 no.6
    • /
    • pp.573-580
    • /
    • 2014
  • In this paper, axial strains and lateral displacements of columns in a 58-story reinforced concrete building were measured using vibrating wire gauge and laser scanner, respectively, and compared with predicted values. Predictions were obtained using ASAP, which is a 3D construction stage analysis program developed based on PCA report. Comparisons indicated that columns in the middle of floor plan showed good correlation with predictions. However, the columns in the corners showed some deviations. Lateral displacement of columns between measurement and estimation showed similar trends but considerable deviations, which are seemingly caused by construction error of column faces, and inaccuracy in differential vertical displacement prediction.

A Case Study on Construction Management Based on BIM Data (BIM 데이터 기반 현장 시공관리 사례 분석 연구)

  • Lee, Dong-Jun;Hyun, Jin-Oh;Min, Sung Gyu;Lim, Ji-Yong;Shin, Min Cheol;Kwon, Suk Hyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.44 no.2
    • /
    • pp.223-229
    • /
    • 2024
  • The Ministry of Land, Infrastructure and Transport presented the "Construction Industry BIM Enforcement Guidelines Constructors Edition" to reflect the design BIM data in the construction stage. The enforcement guidelines were prepared with the aim of providing guidelines for detailed common implementation plans such as minimum BIM business methods and procedures necessary for ordering, designing, and construction stages for the full-scale BIM application in all fields of the construction industry. In this study, interference and design errors were examined based on the enforcement guidelines, and the application effects were grasped for various sites where equipment placement and operation plans were established. As a result, intuitive examination was possible by comparing the digital field 3D model and the planned model in one space, and the optimum equipment arrangement and operation plan were derived through simulation examination according to the execution stage.

Erection Sequence Analysis of Suspension Bridge Considering to Sliding of Main Cable (주케이블의 슬라이딩을 고려한 현수교의 시공단계 해석)

  • Yhim, Sung-Soon;Kong, Min-Sik;Kim, Byeong-Cheol
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.13 no.3 s.55
    • /
    • pp.164-172
    • /
    • 2009
  • Anchors and saddles are used to have sufficient geometrical rigidity and make target configuration of main cable of suspension bridge. Neglecting the sliding effect at saddles, points at them have been idealized as fixed nodes in lots of former studies. In general, sliding effects are reported to show significant structural behaviors of main cable and cause to the different responses of bridges. During early erection steps of the suspension bridge, especially, the sliding effect occurs easily because there is large difference of cable tension between main and side span in removing set-back ropes or not applying set-back. This study presents the finite element analysis considering to cable sliding effect and shows the comparison of differences between sliding and non-sliding at election sequence. The analysis of sliding between main cables and saddles needs to obtain more realistic responses because the analysis result can represent unfavorably different responses of bridges. Moreover, the sliding analysis method and results in this study can be used to basic criteria in engineering design and construction steps.

원자력발전소 시공공인검사

  • Jeon, Jin-Su;Park, Ban-Uk;Lee, Ju-Seok
    • 기계와재료
    • /
    • v.10 no.2 s.36
    • /
    • pp.129-137
    • /
    • 1998
  • 원자력발전소 기기의 구조, 건전성 확보를 위해 기기가 적절한 기술기준에 따라 제작, 설치 및 운전되고 있는지 여부를 정부가 인정한 제3자에 의해 시행되는 검사를 원자력공인검사라하며 세부적으로 기기의 제작 및 시공단계에서 수행되는 공인검사를 제작/시공공인검사, 시운전 및 운전단계에서 수행되는 공인검사를 가동전/중공인검사로 분류하여 검사를 수행하고 있다. 현재 우리 연구원에서는 월성원자력 2,3,4호기를 비록하여 울진원자력3,4호기를 비롯하여 울진원자력3,4호기, 영광원자력5.6호기에 대한 시공공인검사를 수행하고 있으며 울진원자력5,6호기와 KEDO에서 시행하는 북한원전에 대한 시공공인검사를 준비하고 있는 실정이다. 여기에서는 현재 검사가 진행중인 월성원자력 2,3,4호기 시공공인검사를 중심으로 원자력발전소 시공에 적용하고 있는 공인검사에 대해 소개하고자 한다.

  • PDF