• Title/Summary/Keyword: 승인절차

Search Result 130, Processing Time 0.022 seconds

Classification and Analysis of Characteristics of Changes in Apartment Landscape Work (아파트조경공사 설계변경의 유형분류와 특성분석)

  • Park, Chun-Soo;Park, Seung-Burm
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.37 no.1
    • /
    • pp.28-42
    • /
    • 2009
  • In the wake of categorizing the design changes occurred during the period from 2004 till the first half of 2006 in Choongcheong province area, based on purpose and reason of design changes identified by the Korea National Housing Corp, it included 11 types such as the image of the apartment complex, scenic elements, consideration by the user, prevention of the defect, constructability, site conditions, incompatibility between the activities, superordinate standard, prevention of civic complaints, design details and others, along with 47 subordinate elements. And the evaluation intended to identify the corelation between the number and time of design change approval, frequency and scale of design change by type and the cost variations indicated that; firstly, enhancing the image of the apartment complex proved to be the main reason for design changes, accounting for 22% in terms of frequency and 54.9% in terms of cost variation. Secondly, the higher the increase in cost by design change aimed at improving the image of the complex, the lower the decrease in cost by design change for uncertain reasons, dubbed the inverse proportional relations, indicating that the design changes for uncertain reasons were mostly aimed at reducing the construction cost. Thirdly, with regard to the number of design change approval and the time of the initial approval, twice or less and 90 days or less before completion of the construction work, respectively, accounted for $52{\sim}53%$, indicating the design change deliberation and approval tended to have been carried out collectively in the form of ex post facto approval, which seemed to be attributable to the attempt of reducing the construction cost or budget problem, as a result of comparing with the cases in which the cost was reduced.

FPGA Implementation of a Grant Distribution Algorithm for the MAC in the ATM-PON (ATM-PON에서 MAC을 위한 승인분배 알고리즘의 FPGA 구현)

  • Kim, Tae-Min;Chung, Hae;Shin, Gun-Soon;Kim, Jin-Hee
    • Journal of the Institute of Electronics Engineers of Korea TC
    • /
    • v.38 no.10
    • /
    • pp.1-9
    • /
    • 2001
  • The MAC (Medium Access Control) protocol is needed for the OLT(Optical Line Termination) to allocate bandwidth to ONUs(Optical Network Units) and ONTs(Optical Network Terminations) dynamically in the ATM PON(Passive Optical Network). With the protocol, the OLT gathers ONUs' informations and provides grants efficiently to each ONU. Two important functions of the MAC protocol is the grant request procedure and the grant distribution algrithm. The latter has the greatest arithmetic portion in the TC(Transmission Convergence) module, occupies a relatively large portion of the overall chip area, has often been the limiting factor in terms of speed, and should be designed to guarantee the quality of service for various traffics. In this paper, we implement the MAC with the FPGA which can allocate grants dynamically according to the queue length information and the number of active ONUs and distribute grants uniformly to minimize the cell delay variation for each ONU. The structure of the MAC scheduler for the dynamic bandwidth assignment has a programmable look-up table. Also, it has a simple structure, the less chip area, and the lower delay time.

  • PDF

A Study of the Regulations for Calculation of Acceleration Costs on Construction Work (건설공사 공기단축으로 인한 추가비용의 산정규정에 관한 연구)

  • Min, Byeong-UK;Park, Hyung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.2
    • /
    • pp.409-417
    • /
    • 2017
  • The study is concerned with doing research on the plan to prevent the dispute occurring between contract parties regarding the additional cost generated when the construction period is shortened during construction work. After the review of the claim cases and the judgment cases of the court regarding the additional cost caused by the shortened construction period, the representative problem is the incomplete regulations on calculating the additional cost. In the 1st stage of the results of the research on the problem, the procedure handling the additional cost is presented, and the process of planning and approving the shortening of the construction period is gone through in the stage of the procedure to prevent the dispute on the additional cost between contract parties. In the 2nd stage, the plan on enacting and revising the regulations on removing the incomplete problems of the current regulations relating to the calculation of the additional cost. The basis for the advanced contract management is provided by resolving the incomplete problems of the current regulations relating to the shortening of the construction period with the prevention of a dispute and the resultant loss.

Analysis on the submittal process for a small local environmental construction company: a case study (지역 소규모 환경건설회사의 제출/승인 절차 분석에 관한 사례 연구)

  • Lee, Do Gyun
    • Journal of Urban Science
    • /
    • v.6 no.2
    • /
    • pp.73-80
    • /
    • 2017
  • A submittal, as a part of three main project management processes: production control, submittals and change orders, is the transmission of information from the subcontractor to the general contractor to the owner, architect, and structural engineer, for review and approval. The purpose of the submittal process is for submittals to be approved in order to start construction. This benefits the contractor by ensuring that the finished project will meet the expectations of the owner. This paper analyzed a case study regarding the submittal process for the local-based environmental construction company, which typically works as a subcontractor and may hire other subcontractors for additional work when applicable. The aim of this study was to roughly evaluate a project management process and understand the submittal process through the study of a case involving the local company.

  • PDF

Design and Implementation of the tool which support data standization of multi project (다중 프로젝트간의 데이터 표준화 지원을 위한 도구의 설계 및 구현)

  • 박준기;이병엽;양성모;김현정
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 1998.10b
    • /
    • pp.535-537
    • /
    • 1998
  • 소프트웨어 개발에 있어서 표준을 지키는 것은 개발하는 동안에는 개발생산성을 높일 수 있고, 유지보수를 용이하게 해 주는 장점이 있다. 데이터 표준화 지원을 위하여 데이터를 승인된 약어의 조합으로서 구성하고, 코드, 규칙 및 메시지를 관리하여 소프트웨어 내에 사용되는 데이터를 표준화 시킨다. 본 연구에서는 여러 소프트웨어를 개발하는 환경에서 데이터 표준화 지원을 위한 방법론을 제시한다. 데이터의 표현 구조를 정의하고, 각 데이터에 대한 등록 절차를 제시함으로써 표준화를 이룰 수 있다. 이러한 방법론을 이용하여, 대우정보시스템에서 전사의 데이터 표준화 지원을 위하여 NICE-GEN 이라는 CASE(Computer Aided Software Engineering) 도구를 개발했고, 실제 소프트웨어 개발에서 높은 개발생산성을 보여 주었다.

A Study on the Concept of Operation of UAVs in Civil Airspace (무인기의 민간공역 사용에 대한 운용개념 연구)

  • Yeom, Chan-Hong;An, Seok-Min;Nam, Gi-Uk
    • 한국항공운항학회:학술대회논문집
    • /
    • 2016.05a
    • /
    • pp.240-244
    • /
    • 2016
  • 현재 다양한 능력을 갖춘 무인기의 이용이 공공, 민간 분야에서 빠른 속도로 증가 추세에 있다. 무인기의 원활한 이용을 위해 그리고 관련 산업의 발전을 위해 국가 공역을 이용할 수 있어야 하지만 현재는 개별적으로 무인기 운용을 특별 승인해 주는 정도이다. 따라서 안전하고 효율적인 무인기 운용을 위한 정책, 제도, 절차 등을 정비하는 등 여건을 구비해야 한다. 이에 본 연구에서는 이를 위해 필요한 기술적 사항들을 미국의 경우를 중심으로 분석하였다. 유인기와 통합공역운용을 위한 선결과제들과 이를 위한 요구조건 및 가정 들을 정리하고, 무인기 인증과 민간공역 운용허가 및 분리 보장 등에 대해 검토하였다.

  • PDF

해외건설공사 수행절차(5)

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.10 s.219
    • /
    • pp.48-50
    • /
    • 2008
  • 해외건설공사를 성공적으로 수행하기위해서는, 낙찰통보전 낙찰가능시점부터, 현장소장을 비롯한 현장준비팀을 조직 운영하여, 계약서류상의 각종 요구사항, 승인사항, 인 허가사항, 현지법,공법,계약조건, 공정계획, 인원소요계획, 장비소요계획 등을 검토 한다. 또 현장답사 등을 통하여 견적시에 계획되고 작성된 모든 내용을 검토 보완, 수정 및 Update함과 동시에,선발대를 현장에 투입해 발주자로부터 현장을 인수하고 가설공사를 시작하며 조기착공에 서두른다. 단, 현장투입 전 발주자로부터 접수한 Letter of Intent(낙찰/계약의향서)상의 착공관련 조건을 확인하거나 Notice to Proceed(착공지시서)의 접수를 확인해야 한다. 시공자의 입장에서 건설공사의 궁극적인 목표를 이익의 극대화로 볼 때, 공사초기에서의 신속한 동원이야말로 목표달성에 이르는 지름길이며, 발주자 및 감리자로부터 신뢰를 받아 공사 전반에 걸쳐 순조로운 현장운영을 가능케 하는 것이다.

  • PDF

주파수거래제의 활성화를 위한 법.제도적 제언

  • Gye, Gyeong-Mun
    • Information and Communications Magazine
    • /
    • v.24 no.9
    • /
    • pp.60-66
    • /
    • 2007
  • 이동통신서비스의 증가와 관련 산업의 비약적인 발달은 필연적으로 그 매개체인 이동통신사업용주파수 수요의 폭발적인 증가를 가져왔는데 현재의 주파수배분표는 그 공급이 매우 제한적임을 보여주고 있다. 이러한 변화에 발맞추어 전파관리의 패러다임도 바뀔 수밖에 없는데 기존의 국가관리체제에는 변함이 없을 것이나 이미 할당받은 주파수이 이용을 활성화하기 위하여는 시장 기반의 거래로 그 관리철학이 바뀌어야 한다. 그 제도적 뒷받침을 위하여는 우선 주파수할당시의 용도와 기술기준을 주무부처가 일일이 지정해야 하는가에 대한 근본적인 검토가 필요하고 주파수 양도 임대시 정보통신부장관의 승인제도는 그 법문에 맞게 최소한의 것에 행사되어야 한다. 이는 배분된 주파수대역에서의 주파수이용기술의 발전을 민간레벨에서 촉진시킨다는 의미에서도 매우 중요한 것이다. 더불어 주파수 할당을 비롯하여 전파자원의 분배는 행정절차법이 정한 그 것에 따라야 하며, 나아가 일정한 전파자원의 분배는 관리주체인 정보통신부가 아닌 제3의 독립기관이나 국회의 소관사항으로 하는 것이 바람직하다.

Developing an Execution Strategy for FPSO

  • Kang, Jae-Sung;Kang, Ho-Keun;Park, Jae-Hong;Ha, Tae-Bum
    • Proceedings of the Korean Society of Marine Engineers Conference
    • /
    • 2012.06a
    • /
    • pp.43-46
    • /
    • 2012
  • 2011년 IMA의 자료[1]에 의하면, 현재 251척의 부유식 생산설비가 운영되고 있으며, 이중 FPSO가 차지하는 비율은 64%에 이른다. 또한, 가장 각광을 받고 있는 부유식 생산설비의 유형인 FPSO는 현재 40여척을 건조 (New building) 및 개조(Conversion)를 하고 있다. 전체적인 FPSO의 개발 및 건조 프로젝트는 일반 선박 프로 젝트와는 다르게 환경적, 정치적, 상업적인 영향을 많이 받는다. 예를 들면, 같은 구역에 석유/가스 채굴을 위한 프로젝트를 승인받은 기업들은 각자의 기술력, 재정상태, 채굴구역의 정치적인 영향력에 따라서 프로젝트의 초기 개념설계부터 전혀 다른 방향으로 구축할 수 있다. 이러한 변수가 많은 프로젝트를 성공적으로 수행하기 위해서는 각 단계별 세부 계획도 동시에 이루어져야 한다. 본 연구에서는 이러한 세계적인 해양구조물의 대표 격인 FPSO의 특성을 보고하고 이와 관련되는 프로젝트의 다양한 수행 절차 및 시스템/장비에 대해 설명한다.

  • PDF

An Approval Method of the Credit Cards using Mobile Phone (휴대폰을 이용한 신용카드의 결재 방법)

  • Lee, Young-Gyo;Ahn, Jeong-Hee
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2010.07a
    • /
    • pp.181-182
    • /
    • 2010
  • 1940년대에 등장한 신용카드는 현재 전세계적으로 널리 사용되고 있는 결재 수단이며 사용자 및 결재 금액이 꾸준히 증가하고 있지만 아직도 초기의 결재절차를 그대로 사용하고 있어 위조 등의 문제가 발생하고 있다. 따라서 현재와 같은 일방적인 정보만을 가지고 결재가 이루지는 신용카드의 안전성을 높이기 위하여 본 논문에서는 휴대폰을 이용한 카드 사용자에 대한 인증 방법을 제안하고자 한다. 고객이 신용카드를 사용시에 신용카드사 거래승인 시스템에서는 이동통신사를 통하여 고객의 휴대폰으로 SMS 문자를 보내게 되고 이에 대해 응답 SMS 문자를 보냄으로써 사용자 인증을 수행하게 된다. 이러한 방법은 추가적인 하드웨어가 필요하지 않으며 적용이 용이하고 신용카드의 안전성을 높여 주게 될 것이다.

  • PDF