Quantified Evaluation on the Qualitative Criteria for the Selection of Appropriate Concrete Slab Form-works for Residential Buildings (델파이 기법을 이용한 정성적 공법 선정 요인의 정량적 평가 분석)

  • Lee, Kyung-Suk;Lee, Tae-Hee;Shin, Young-Keun;Kim, Tae-Hyung;Han, Seung-Woo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.2
    • /
    • pp.136-144
    • /
    • 2011
  • The form-work operation of concrete structures is a major element determining the period and cost of construction projects. However, the selection of the appropriate form-work system is dependent on the experience of the site personnel only. In this paper, existing methods (Aluminum form, Sky deck) and new slab form-work methods (AFB: Aluminum panel Form with dropping Beam) were selected. Each method was estimated by means of Delphi techniques based on the qualitative analysis data. This paper suggests an evaluation methodology of slab form-work application in construction sites by calculating qualitative evaluation scores. The methodology finding quantified scores of qualitative criteria can be available to be applied to other construction operation evaluation methods.

Development and Implementation of a Low-noise and Safe Dismantling Method for Full-Span Aluminum Slab Formwork Supported by Filler Supports (필러겸용 스포터로 지지되는 전구간 알루미늄 슬래브 거푸집의 저소음 안전낙하 공법개발 및 적용연구)

  • Lim, Nam-Gi
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.2
    • /
    • pp.261-271
    • /
    • 2024
  • The widespread adoption of aluminum slab formwork in modern construction, evident in both domestic and international projects, offers numerous advantages. However, a critical challenge persists regarding the dismantling process for these slabs. The current industry standard involves dropping the slabs to the ground floor upon removal. This practice raises several concerns, notably the generation of significant noise pollution that disrupts nearby communities. More importantly, the risk of worker injuries due to falls from height during the dismantling process is a serious safety hazard. Additionally, the impact from dropping the slabs can damage the aluminum itself, leading to increased replacement costs. These drawbacks necessitate the exploration of alternative dismantling techniques that prioritize worker safety, material sustainability, and overall process efficiency. Accordingly, in this study, when the entire first-generation slab formwork of an apartment house is simultaneously lowered to a reachable position for workers, it is then disassembled and lifted for transport to the next floor. This approach has the potential to demonstrate improvements in safety, quality, economy, and process efficiency.

An Experimental Study on the Performance and Field Application of Low Noise Beam-slab Formwork using Table Type Multi-stage Drop System (테이블형 다단 드롭 시스템을 이용한 저소음 보-슬래브 거푸집의 구성부재 성능 및 현장적용에 관한 실험적 연구)

  • Ryu, Hwa-Sung;Jeong, Woo-Jin;Kim, Deuck-Mo;Song, Seong-Yong;Shin, Sang-Heon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.4
    • /
    • pp.349-360
    • /
    • 2017
  • In concrete construction work, formwork is an important process that accounts for 10% of the total construction cost. Recent buildings are becoming bigger and higher. In order to maximize the efficiency and safety of this formwork, the system of formworking has been systematized. However, the human accidents and the noise complaints arise from dismantling processes frequently occur. In order to solve these problems, most of them are dependent on foreign technology, but they do not take into consideration the conditions of domestic construction site. In this study, we developed a table type multi-drop system form for a slab and beam which can improve the process, safety and reduction of disassembly noise, and evaluated the physical properties of the main members which are used in the system. The results of this study show that there is sufficient strength to be used as a slab and a laying material for both a yoke beam and a supporting post. The noise level is improved compared to existing method.

A Process Improvement in Building Constructions using Value Stream Analysis - Focused on slab works - (가치흐름 분석을 통한 건설공사의 공정개선방안 - 슬래브 공사를 중심으로 -)

  • Lee Hyung-Soo;Yoon You-Sang;Suh Sang-Wook;Jang Chan-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.527-530
    • /
    • 2002
  • The purpose of this study is to present an improvement of the form work process. The current slab form work has waste factor by unnecessary process and not complete integration with the finishing process. Therefore the study used value stream analysis methodology for effective improvement of slab form work process. The main contents of the study are as follows; 1) Understanding of non-value adding activities in existing slab form work process 2) Process integration by value stream mapping 3) Effect analysis of time-cost reduction. The study recommends that, as a future research, development of tool and technique for the non-value adding activities are eliminated in building construction.

  • PDF

An Improvement of Concurrent Placement of Footing and Slab Concrete (기초 및 바닥층 동시타설 공사의 개선방안 연구)

  • Lee, Dong-Hoon;Choi, Jae-Hwi;Kill, Jong-Il;Seo, Deok-Seok;Kim, Sun-Kuk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.6
    • /
    • pp.121-129
    • /
    • 2009
  • The construction sites of small and medium buildings have small scale groundwork and the depth of excavation is often shallow. In this case, if the groundwork, girders, and ground slabs are built simultaneously by embedded assisting form rather than the existing conventional method to place concrete twice using the general form, we can expect to reduce the frame duration of the basement, resulting in cost savings. The existing embedded assisting form is restricted from use because there are cost problems with materials, labor costs,and with quality depending on the form's type. Therefore, this study is to provide an improved suggestion of building the groundwork, girders, and ground slabs simultaneously with Polystyrene by using the embedded assisting form. It also will compare the technique with existing methods of construction, and will verify its usefulness by evaluating each method of construction.

Development of Forms for Cold Weather Concrete by Combination of Insulation (단열재 조합에 의한 한중콘크리트용 거푸집 개발)

  • Han, Cheon-Goo;Oh, Seon-Kyo;Sin, Dong-An;Kim, Kyoung-Min
    • Journal of the Korea Concrete Institute
    • /
    • v.15 no.3
    • /
    • pp.392-399
    • /
    • 2003
  • This paper discusses the validities of insulating curing of cold weather concreting at early stage by applying insulation forms. Tests were carried out using modified insulating form combining existing insulating form and various other insulations in order to develop improved insulation form. Temperature history of concrete using various insulating forms and insulation was measured to determine most effective combination of insulting form. According to results, as for the wall form, under the curing temperature of $-10^{\circ}C$, the temperature of concrete using Euro form drops sharply before 24 hours and lasts below $0^{\circ}C$ for 7 hours. The temperature of concrete using the form combining Polypropylene panel, styrofoam and plywood panel keep above $0^{\circ}C$. And, it is confirmed that the form mentioned above has a favorable effects on enhancing strength development of concrete and the cost to make the forms shows more reasonable than that of existing forms. However, as for the combination methods of insulation form for slab, which is composed of insulating form at the bottom of slab and various surface curing materials at the top of slab, in case of exposed condition at the top of slab, temperature history of concrete goes below $0^{\circ}C$ after 10 hours. In case of the combination of vinyl sheet and curing blanket, it drops below $0^{\circ}C$ after 42 hours. However, in case of the combination of vinyl, styrofoam and curing blanket, it does not go below $0^{\circ}C$ until 55 hours. Accordingly, compared to the case of exposure and the combination of vinyl and curing blanket, it indicates that the combination mentioned above has more effective insulating performance.

Study on Stress Variation in Slab and Support of Shearwall-Type RC Apartment during Construction (전단벽식 아파트에서 시공중 슬래브 및 동바리의 응력변화에 대한 연구)

  • Kim Young-Chan
    • Journal of the Korean Society of Safety
    • /
    • v.19 no.4 s.68
    • /
    • pp.161-165
    • /
    • 2004
  • Safety and efficiency in the construction of RC structures mainly depends on optimal operation of shore-slat systems. The disasters in RC construction are mainly due to excessive load applied to falsework and premature removal of supports. Development of sufficient compressive strength of early-age connote is essential for the safety of structures during construction. Most of studies on shore-slab interaction have focused on flat slab structures. In this study, load distributions in floor slabs and supports during the construction of shear wall-type RC apartment building structures is investigated using finite element analysis.

A Study on the Structural Behavior of the Composite Slab with New-Shaped Deckplate (신형상 데크플레이트를 이용한 합성슬라브의 구조적인 거동에 대한 연구)

  • Huh, Choong;Moon, Tae Sup
    • Journal of Korean Society of Steel Construction
    • /
    • v.9 no.3 s.32
    • /
    • pp.341-350
    • /
    • 1997
  • The objective of this study is to investigate the structural behavior of the composite slabs with the new metal deckplate. The new deckplate can be used as structural member with topping concrete. So several experiments of this structural test and the fire resistance test were done. From this experiments. slabs with new metal deckpklate were verified as composite slabs. In this paper, this verifications were compared with the international design methods. For experiment. 49 specimens were made. the main parameters are deckplate thickness (1.2mm. 1.6mm) depth of topping concrete(85mm. 90mm). support condition(simple, 2-span), shear reinforcment(studs), span(2.7m, 3.0m, 3.3m. 3.6m. 3.9m) and shear span(L/3, L/4, L/7). We analyzed the structural behavior of composite slab throughout the moment-curvature relationship which is obtained with the program using the computer language. Turbo C. From this development for slab system, the reinforced concrete or steel structure building may be easy, economical for construction, And informations about the structural behavior of composite slabs will be utilized to established korea standard.

  • PDF