• Title/Summary/Keyword: 슬래그 처리

Search Result 167, Processing Time 0.029 seconds

A Study on the Resource Recovery of Fe-Clinker generated in the Recycling Process of Electric Arc Furnace Dust (전기로 제강분진의 재활용과정에서 발생되는 Fe-Clinker의 자원화에 관한 연구)

  • Jae-hong Yoon;Chi-hyun Yoon;Hirofumi Sugimoto;Akio Honjo
    • Resources Recycling
    • /
    • v.32 no.1
    • /
    • pp.50-59
    • /
    • 2023
  • The amount of dust generated during the dissolution of scrap in an electric arc furnace is approximately 1.5% of the scrap metal input, and it is primarily collected in a bag filter. Electric arc furnace dust primarily consists of zinc and ion. The processing of zinc starts with its conversion into pellet form by the addition of a carbon-based reducing agent(coke, anthracite) and limestone (C/S control). These pellets then undergo reduction, volatilization, and re-oxidation in rotary kiln or RHF reactor to recover crude zinc oxide (60%w/w). Next, iron is discharged from the electric arc furnace dust as a solid called Fe clinker (secondary by-product of the Fe-base). Several methods are then used to treat the Fe clinker, which vary depending on the country, including landfilling and recycling (e.g., subbase course material, aggregate for concrete, Fe-source for cement manufacturing). However, landfilling has several drawbacks, including environmental pollution due to leaching, high landfill costs, and wastage of iron resources. To improve Fe recovery in the clinker, we pulverized it into optimal -sized particles and employed specific gravity and magnetic force selection methods to isolate this metal. A carbon-based reducing agent and a binding material were added to the separated coarse powder (>10㎛) to prepare briquette clinker. A small amount (1-3%w/w) of the briquette clinker was charged with the scrap in an electric arc furnace to evaluate its feasibility as an additives (carbonaceous material, heat-generating material, and Fe source).

Feasibility study of indirect coal liquefaction process (석탄 간접액화 공정의 경제성 분석)

  • Kim, Hak-Joo;Jung, Heon;Lee, Ho-Tae;Yang, Jung-Il;Chun, Dong-Hyun;Yang, Jung-Hoon;Park, Ji-Chan;Kim, Byung-Kwon
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2011.05a
    • /
    • pp.76.2-76.2
    • /
    • 2011
  • 석탄으로부터 합성석유를 생산하는 상용기술을 도입하여 건설하고 이와 더불어 원천기술 개발을 위한 국산화 기술 개발을 병행하여 향후 고유가 시대를 대비한 국가 에너지 안보 확립과 국내 기술 개발의 가속화를 추구해야 할 필요성이 대두되고 있다. 본 타당성 조사는 3종류의 석탄(호주 Wyong탄, 인도네시아 NTC탄, 인도네시아 KBB탄)으로부터 가스화에 의하여 합성석유스를 생산하는 공정에 대한 타당성 조사(Feasibility Study, FS)를 Class 5(하한 -50~-20%, 상한 30~100%)의 정확도로 수행하는 것을 내용으로 하고 있다. 플랜트의 규모는 합성석유 기준으로 20,000배럴/일이다. 플랜트의 건설을 위해서 광양제철소 슬래그처리장 내 12만평 부지에 조성 중인 포스코 SNG 생산공장 부지의 일부를 사용하는 것을 기준으로 하였다. 일반적으로 석탄의 종류에 따라서 가스화기의 종류 및 성능이 결정된다. 본 타당성 조사 연구에서 선정된 3종류의 석탄의 조성, 발열량, 회분 함량 등의 특성을 고려하여 각각의 석탄에 적합한 현존하는 상용급 가스화기를 선정하였다. 해당 석탄이 가스화기 종류에 따라 적절한 전처리 과정(건조, 분쇄, 슬러리화)을 거친 후 가스화기에 공급되는 것을 가정하여 석탄의 원소분석 조성, 발열량, 회분함량, 회분조성, 회 용융점 등의 변수에 따라서 각각 해당 가스화기에서 가스화되었을 때의 생성되는 합성가스의 조건을 시뮬레이션을 통하여 얻었다. 가스화기 시뮬레이션 결과를 토대로 합성석유 및 합성천연가스 생산을 위한 공정의 물질수지식 및 에너지수지식이 계산되었으며 이로부터 각 공정에서 발생되는 부생성물과 폐기물에 대한 양이 결정되고 이를 처리하는 방안 등도 제시되었다. 실증시설은 20,000배럴/일 규모의 CTL 및 전기 병산 시설이 적합하다. 더 큰 규모 공장은 투자비가 너무 커서 유가 또는 석탄가 변동에 따라 사업의 수익성이 크게 변하여 위험도가 큰 단점이 있기 때문이다. CTL 공장에 전기 병산이 추천되는 이유는 산소생산공장(APU), 압축 등 석탄전환공장에는 자체적인 전기수요가 막대하여 따로 스팀터빈용 발전소를 운영하므로 이를 효율적으로 대체하고자 하기 때문이다. 즉, 석탄가스화에 의해 기름을 최대한 만들고 미반응가스는 가스터빈 및 스팀터빈의 복합발전에 의해 고효율로 전기를 생산하면 최소의 비용으로 최대한 전기를 생산하여 자체소비 전력을 충당하고 남는 전기는 판매하여 수익률을 높일 수 있다.

  • PDF

Development and performance verification of induced drainage method for leakage treatment in existing underground structures (운영중인 지하구조물 누수처리를 위한 유도배수공법 개발 및 성능 검증)

  • Kim, Dong-Gyou;Yim, Min-Jin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.3
    • /
    • pp.533-549
    • /
    • 2017
  • In this study, drainage systems were proposed to drain the leakage of groundwater in the existing underground concrete structures. The system consists of drainage board, wire mesh, fixed nail, and mortar with mineral. In order to increase constructability, the drainage board and wire mesh were attached on the surface of cement concrete using the air nailer and fixed nail. The mortar with 30% of blast furnace slag was sprayed on the drainage board and wire mesh using the spray mortar equipment. The field test construction was carried out in a conventional concrete lining tunnel and concrete retaining wall for performance verification of the drainage system in the field. There was no problem with performance degradation in the drainage system for three years after construction. The bond strength tests were performed on the sprayed mortar at 14 days and about 3 years after field test construction. In case of attaching the wire mesh on the drainage board, the bond strengths of the sprayed mortar were 1.04 MPa at 14 days and 1.46 MPa about 3 years. In case of the drainage board without the wire mesh, the bond strengths of the sprayed mortar were 1.13 MPa at 14 days and 0.89 MPa, less than 1 MPa of bond strength criteria, about 3 years.

Effects of Heat-Treatments on Transformation Behavior of Matrix Structures in High Alloyed White Cast Iron (고합급백주철에 있어서 열처리가 기지조직의 변태에 미치는 영향)

  • Shin, Sang-Woo;Ryu, Seong-Gon
    • Korean Journal of Materials Research
    • /
    • v.10 no.6
    • /
    • pp.409-414
    • /
    • 2000
  • Three different white cast irons alloyed with Cr, V, Mo and W were prepared in order to study their transformation behavior of matrix structures in heat-treated conditions. The specimens were produced using a 15kg-capacity high frequency induction furnace. Melts were super-heated to $1600^{\circ}C$, and poured at $1550^{\circ}C$ into Y-block pepset molds. Three combinations of the alloying elements were selected so as to obtain the different types of carbides and matrix structures : 3%C-10%Cr-5%Mo-5%W(alloy No. 1), 3%C-10%V-5%Mo-5%W(alloy No. 2) and 3%C-17%Cr-3%V(alloy No. 3). The heat-treatments were conducted as follows: frist of all, as-cast specimens were homogenized at $950^{\circ}C$ for 5h under the vacuum atmosphere. Then, they were austenitized at $1050^{\circ}C$ for 2h and followed by air-hardening in air. The air-hardened specimens were tempered at $300^{\circ}C$ for 3h. The observation of morphology of the matrix structures was carried out in the states of as-cast(AS), air-hardened(AHF) and tempered(AHFT). The matrix structures of each alloy were almost fully pearlitic in the as-cast state but it was transformed to martensite, tempered martensite and retained austenite by the heat-treatments such as air-hardening and tempering.

  • PDF

Development of Flowable Backfill Material Using Waste Oyster Shell, Coal Ash, and Surplus Soil (굴패각, 석탄회 및 굴착잔토를 이용한 무다짐 처리공법용 뒷채움재 개발)

  • Kim, Min-Jin;Wang, Xue;Lee, Je Joo;Lee, Sang Ho;Kim, Sung Bae;Kim, Chang-Joon
    • Clean Technology
    • /
    • v.19 no.4
    • /
    • pp.423-429
    • /
    • 2013
  • This study aimed to develop flowable backfill material using oyster shell, coal ash, and surplus soil. The high temperature (> $800^{\circ}C$) reaction was required to convert $CaCO_3$ to CaO. The solid specimens formed by pozzlanic reaction between CaO and coal ash showed low unconfined compressive strength. The effect of kaolin and blast furnace slag was also examined. It was found that CaO and coal ash could not be utilized due to high cost and low performance. The use of oyster shell without calcination ($CaCO_3$) was evaluated. The specimens composing of oyster shell and cement showed the higher unconfined compressive strength than that composing of coal ash and cement. However, use of oyster shell is limited in mortar due to the presence of salt. Addition of soil into oyster shell-coal ash-cement mixture satisfied the specification of flowable backfill material by optimizing their ratio.

Characteristics of Mine Liner According to the Replacement Ratio of Nano-Silica and Silica-Fume (나노실리카 및 실리카흄 대체율에 따른 차수재의 특성)

  • Kang, Suk-Pyo;Lee, Hee-Ra;Kang, Hye-Ju;Nam, Seong-Young;Kim, Chun-Sik
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.7 no.1
    • /
    • pp.66-73
    • /
    • 2019
  • Approximately 80% of the mines are vacated or abandoned mines and are mostly left without suitable environmental treatment facilities. In the area around the abandoned mine site, problems such as drainage of acidic city drainage and leakage of leachate occur, and ground subsidence caused by this can cause a safety accident due to sink hole occurrence. In this study, flow, compressive strength, water uptake, pore and hydration characteristics were investigated to investigate the basic properties of liner and cover material based on the replacement ratio of nano silica and silica fume in the existing blast - furnace slag fine powder. As a result, as the substitution ratio of nano silica and silica fume increased, the flow and compressive strength of nano silica specimens increased and the absorption rate decreased. In the case of pore characteristics, the amount of pores decreased as the substitution ratio of nano silica and silica fume increased. Especially, the capillary porosity of 10-1,000 nm diameter decreased. Ray diffraction analysis and SEM measurement showed that the peak positions of the hydration products were almost the same when compared with the 5% alternative test samples of Plain and silica fume.

Environmental Leachability of Electric Arc Furnace Dust for Applying as Hazardous Material Treatment (제강분진을 이용한 유해물질 처리기술 적용을 위한 안전성 평가)

  • Lee, Sang-Hoon;Kang, Sung-Ho;Kim, Jee-Hoon;Chang, Yoon-Seok
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.28 no.3
    • /
    • pp.329-336
    • /
    • 2006
  • Iron manufacturing process involves production of various by-product including slag, sludge, sintering and EAF(Electric Arc furnace dust). Some of the by-products such as EAF and sintering dust are disposed of as waste due to their high heavy metal contents. It has been notice for many years that the EAF dust also contain about 65% of Fe(0) and Fe(II) and then the possible utilization of the iron. One possibility is to apply the EAF as a lining material in conjunction with clay or HDPE liners, in waste landfill. The probable reaction between the leachate containing toxic elements such as TCE, PCE dioxine and $Cr^{6+}$ is reduction of the toxic materials in corresponding to the oxidation of the reduced iron and therefore diminishing the toxicity of the leachate. It is, however, prerequisite to evaluate the leaching characteristics of the EAF dust before application. Amelioration of the leachate would be archived only when the level of toxic elements in the treated leachate is less than that of in the untreated leachate. Several leaching techniques were selected to cover different conditions and variable environments including time, pH and contact method. The testing methods include availability test, pH-stat test and continuous column test. Cr and Zn are potentially leachable elements among the trace metals. The pH of the EAF dust is highly alkaline, recording around 12 and Zn is unlikely to be leached under the condition. On the contrary Cr is more leachable under alkaline environment. However, the released Cr should be reduced to $Cr^{3+}$ and then removed as $Cr(OH)_3$. Removal of the Cr is observed in the column test and further study on the specific reaction of Cr and EAF dust is underway.