• Title/Summary/Keyword: 스틸박스 교량

Search Result 4, Processing Time 0.02 seconds

2단 고가상판 슬래브 교량공사 안전 문제점

  • 양학수;손기상
    • Proceedings of the Korean Institute of Industrial Safety Conference
    • /
    • 2003.05a
    • /
    • pp.487-490
    • /
    • 2003
  • 국가의 사회간접자본 시설확충 정책에 따라 교량공사의 건수는 계속 증가되어 오고있다. 교량공사는 수상공사, 육상공사로 나뉘고 다시 우물통기초, 교각, 상판공사로 분류될 수 있는데 상판공사 스틸박스거더, 콘크리트 박스거더 위에 설치되므로 물위에서 또는 땅 위에서의 높이가 수십m에 이르게 되어 추락했을 때 특히 위험하고 상판을 FCM공법으로 물위의 수십m 위에서 진행되는 경우가 대부분이다.(중략)

  • PDF

BIM based Design of Steel Box Girder (STEEL BOX 교량 상부구조의 BIM기반 설계)

  • Lee, Jin-Kyoung;Lee, Heon-Min;You, Jae-Myoung;Shin, Hyun-Mock
    • Journal of KIBIM
    • /
    • v.1 no.2
    • /
    • pp.6-11
    • /
    • 2011
  • In domestic construction industry, there is lack of the communication between planning, design, construction and maintenance. This problem makes the omission of information and the loss of cost. Therefore, the introduction of BIM can be a solution about that. BIM manages all information generated during all life-cycle of a structure and consequently maximizes the efficiency of utilizing information. This is done through 3D information model associated with a three-dimensional(3D) parametric CAD. This study proposes the design process of steel box bridge for structural design work of bridge construction project based on BIM. This process has 3D modeling progress done by using the information decided in design phase. When the subject for the proposed process is superstructure of steel box bridge in construction, the structural calculation sheet can be derived with the structural design process based on BIM.

A Study on the Numerical Analysis Methods for Predicting Strength Test Result of Box Girder under Bending Moment (휨 모멘트를 받는 박스거더 구조 강도 실험에 대한 수치해석 방법에 관한 연구)

  • Myung-Su Yi;Joo-Shin Park
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.29 no.5
    • /
    • pp.488-496
    • /
    • 2023
  • Ship and bridge structures are a type of long box-shaped structure, and resistance to vertical bending moment is a key factor in their structural design. In particular, because box girders are repeatedly exposed to irregular wave loads for a long time, the continuous collapse behavior of structural members must be accurately predicted. In this study, plastic collapse behavior, including buckling according to load changes of the box girder receiving pure bending moments, was analyzed using a numerical analysis method. The analysis targets were selected as three box girders used in the Gordo experiment. The cause of the difference was considered by comparing the results of the structural strength experiment with those of non-linear finite element analysis. This study proposed a combination of the entire and local sagging shape to reflect the effect of the initial sagging caused by welding heat that is inevitably used to manufacture carbon steel materials. The procedures reviewed in the study and the contents of the initial sagging configuration can be used as a good guide for analyzing the final strength of similar structures in the future.

Measurement of Organic Solvent from Painting Work Inside the Steel Box Girder of Bridge (교량 스틸박스거더 도장공사의 유기용제 측정 실험)

  • Lee, Jung-Woo;Son, Ki-Sang
    • Journal of the Korean Society of Safety
    • /
    • v.20 no.3 s.71
    • /
    • pp.134-142
    • /
    • 2005
  • This study is to find out how organic solvent will be propagated from painting inside the steel box girder of bridge. $2.9m{\times}3.0m$ of inside size of steel box girder is not suitable for painters to do his work comfortably and hygienically. Substance density(ppm)inside the space of the box unsatisfactory hygienical condition. Most of organic solvent(mainly toluene) came down to 0.5m in two minutes and 53sec. But personal protection for painter should be properly kept against flying this heavy organic solvent. longitudinally 27.1m in length is a cell unit of the whole length of bridge. Model XP-3l6A made in Japan is a main instrumentation adjusted to sense organic solvent especially toluene which can be measured up to 10,000ppm. Scenario analysis by computer program, safer release 2.0 has been performed first to estimate how the organic solvent will be propagated. And then actual test was done as a model. This has been measured for approximately five(5) minutes, with 30 sec interval. Actual measurement results showed much higher $10{\sim}20%$ than result analyzed by the computer program, meaning that this painting work can give worse effect to the worker who is painting inside the box girder of the bridge. The first meas urement level over the floor set up at 30cm height from the floor, because organic solvent was estimated to stay at the level. and then, they were measured at 1.0m, 1.5m level respectively, more.