• Title/Summary/Keyword: 수위강하량

Search Result 73, Processing Time 0.029 seconds

Relationship between Groundwater Level Changes and Aquifer Characteristics during Pumping at a Radial Collector Well (방사형 집수정 취수시 대수층 특성에 따른 지하수위의 변화)

  • Choi, Myoung-Rak;Lee, Ho-Jeong;Kim, Gyoo-Bum
    • The Journal of Engineering Geology
    • /
    • v.29 no.3
    • /
    • pp.279-288
    • /
    • 2019
  • The groundwater drawdown at each monitoring well near a radial collector well along Anseong Stream, Korea, was measured and compared with the calculated drawdown using the mirror well concept. The drawdown calculation is performed by treating the collector well as a large vertical well in a homogeneous isotropic aquifer. The measured drawdown at each monitoring well is slightly different from the calculated value due to anisotropy in the hydraulic conductivity and aquifer thickness. The difference between the measured and calculated values at Well OW-7 is large, reaching approximately 48 cm, because a horizontal well is not installed along this direction. Sensitivity analysis of the hydraulic conductivity and aquifer thickness indicates that the hydraulic conductivity is more sensitive to groundwater level changes. Groundwater level changes become a concern when a radial collector well with a large pumping rate capacity is installed, which highlights the need to thoroughly investigate the aquifer characteristics in the surrounding area.

An Analysis of the Relationships between Quantity and Drawdown at the Onyang Hot Spring Area (온양온천지구에서의 양수량-수위강하 관계 해석)

  • Jeong, Ji-Gon;Lee, Chol-Woo
    • The Journal of Engineering Geology
    • /
    • v.17 no.2 s.52
    • /
    • pp.177-185
    • /
    • 2007
  • Most of hot springs don't spring out naturally but are pumped by submersible pumps in Korea. When pumped piezometric head in a well is dropped with proportion to quantity. This research investigates relationships between quantity and drawdown at the Onyang hot spring area. There are 38 wells at this area and the depths of wells range from 124 m to 303 m. Piezometric heads of 4 wells were observed for about 10 months. Fluctuation patterns of piezometric heads seem to be a sine curve with a you period by a high demand and a slack season. Drawdowns of fluctuations were about 98-139 m depth to water table when wells were pumped at $2,300-4,800m^3/day$. A equation was made through analyzing quantity and drawdown.

URT 주변의 지하수유동체계 해석

  • Jo Seong-Il;Kim Cheon-Su;Bae Dae-Seok;Kim Gyeong-Su;Go Yong-Gwon
    • Proceedings of the Korean Society of Soil and Groundwater Environment Conference
    • /
    • 2006.04a
    • /
    • pp.259-262
    • /
    • 2006
  • 본 연구는 지하처분연구시설(URT : Underground Research Tunnel)시설 건설공사와 관련하여 굴착 후의 지하수유동체계 변화를 예측하기 위하여 수행되었다. 지하수유동체계 모사를 위해 사용된 모델은 연속체 매질 개념의 Visual Modflow이며, URT 주변의 시추공에서 조사된 자료를 초기 입력자료로 이용하였다. 1단계 터널굴착 후에 계측된 지하수위 및 터널 내 지하수 유입량을 토대로 모델교정을 수행하였고, 교정된 모델을 이용하여 2단계 터널굴착 후의 지하수유동체계를 예측하였다. 1단계 굴착 후 약 4.3m의 수위강하가 발생한 KP-2번공은 2단계 굴착 후에는 약 0.05m의 수위강하가 예측되었다. 또한 2단계 굴착 후의 지하수위는 터널 입구를 기준으로 약 108m지점부터 터널 종점부 175m까지는 터널 상부에 분포하며, 종점부 175m지점에서는 지하수위가 터널 천장(roof)부로부터 약 12.7m 상부에 위치하는 것으로 예측되었다. 지하수위의 강하범위는 터널 중심부로부터 반경 약 300m까지 발생되는 것으로 예측되었고, 예상 지하수 유입량은 24.7ton/day로 1단계 공사 후보다. 약 2.7ton/day 증가하며, 공동굴착 전 터널 중심부의 지하수가 지표까지 도달하는 시간은 약 39.8년이 소요되는 것으로 나타났다.

  • PDF

Optimization of injection well position and amount to reduce the influence of groundwater level decrase due to riverside filtration (강변여과 취수로 인한 배후 지하수위 강하량 저감을 위한 최적의 주입정 위치 및 주입량)

  • Jang, Chi Woong;Park, Namsik
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2017.05a
    • /
    • pp.388-388
    • /
    • 2017
  • 낙동강 하류 일대에는 수질과 수량 두 가지 요건을 모두 충족하는 강변여과수를 새로운 수자원 확보 대안으로 활용하고 있다. 일부 지역의 경우 과도한 취수량으로 인한 지하수 고갈을 우려하여 개발을 반대하거나 이로 인한 피해보상 범위가 명확치 않아 간접편입부지의 주민들이 피해를 우려하고 있는 실정이다. 따라서 해당 지역에서의 취수량은 인근 주민들에게 피해가 가지 않는 한도 내에서 이루어 져야한다. 하지만 타 지역으로 원수를 공급하게 되어 필요이상의 지하수를 개발하게 되거나 목표취수량에 부합하지 않아 추가 양수정을 시공하는 경우와 같이 수요량과 적정 취수량사이에 문제가 발생하는 경우가 있다. 이러한 배후 지하수위 감소영향과 추가취수량 확보를 위해 주입정을 활용한 인공함양 방법이 적용될 수 있다. 본 연구에서는 강변여과 취수 시 배후 지역의 지하수가 유입되어 인근 지역의 지하수위 강하량을 감소시키기 위한 최적 주입 위치 및 주입량을 산정하는 프로그램을 개발하였다. 고려된 최적화 결정변수는 주입정 개수와 위치, 그리고 주입량이며 제약 조건으로는 기 설치된 양수정 위치, 초기 자연 평형상태의 배후 지하수위에 근사하는 주입정 위치에 따른 최소 주입량 그리고 추가 생산 가능량 이다.

  • PDF

The hydraulic characteristics with tidal effect for pumping test at the costal rock aquifer (해안가 암반대수층에서 양수시험 시 조석효과에 의한 수리특성)

  • Kim, Tae-Yeong;Kang, Dong-Hwan;Kim, Sung-Soo;Kim, Dong-Soo;Chung, Sang-Yong
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2008.05a
    • /
    • pp.1929-1933
    • /
    • 2008
  • 조석에 의한 지하수위변동이 발생하는 해안가 암반대수층에서 고조(high tide)과 저조(low tide) 조건에서의 차이를 규명하기 위한 양수시험이 수행되었다. 본 연구에서 양수시험이 수행된 시험대 수층은 암반층으로서 시험공들은 해안가에서 약 180 m 이격되어 있으며, 양수정(MW1공)과 관측정(MW2공)의 이격거리는 8.05 m 이다. 양수정과 관측정 모두 공 내경은 0.205 m 이며, 케이싱심도는 지표면하 19 m 정도이다. 그리고, 양수정과 관측정의 지하수위는 지표면하 5 m 정도에 형성 되어 있으며, 시험대수층의 두께는 약 40 m 정도이다. 양수시험은 총 3회 수행되었으며, 모든 시험에서 수중모터 설치심도는 지표면하 30 m 이고 양수율은 $75\;m^3/day$로서 동일하였다. 그러나, 양수시작 시간의 차이를 두어 고조 후 1회(1차 시험), 저조 후 2회(2차 및 3차 시험) 수행되었다. 양수정과 관측정에서 자동수위측정기(Model 3001, Solinst)를 설치하여 관측된 지하수위변동 자료에 의하면, 조석현상 발생 후 시험공 내 지하수위변동 경과시간은 고조(high tide) 후 2시간, 저조 (low tide) 후 1시간 정도인 것으로 나타났다. 따라서, 양수시험 시 1차 시험은 고조 후 2시간 경과한 시점에서, 2차 및 3차 시험은 저조 후 1시간 경과한 시점에서 양수가 시작되었다. 양수시험에 의한 경과시간에 따른 수위강하량 그래프에서는 고조조건이 저조조건에 비해 수위강하량이 더 적은 것으로 나타났다. 이러한 원인은 저조에 비해 고조 조건에서는 해수에 의한 지하수위가 상승하여, 동일한 양수조건에서 수위강하량이 적게 나타난 것이다. 양수시험 자료가 AQTESOLV 3.5 프로그램을 이용하여 해석되었다. Theis method에 의해 산정된 수리전도도는 고조 조건의 양수시험에서는 $4.159{\times}10^{-6}\;m/sec$, 저조 후에서는 각각 $3.818{\times}10^{-6}\;m/sec$$3.926{\times}10^{-6}\;m/sec$ 이었다. 저조 후에 비해 고조 후의 수리전도도가 5% 이상 높은 것으로 산정되었다. 이상의 연구 결과들에 의해, 해안가 암반대수층에서는 양수시험 시 조석효과에 의한 수리적인 변동을 고려한 설계와 해석이 수행되어야함을 확인할 수 있었다.

  • PDF

A Study on the Water Withdrawal Permit Rate and Monitoring Well Management of Bottled Water Manufacturers (먹는샘물 제조업체의 취수량 및 감시정 관리에 관한 고찰)

  • Son, Doo Gie;Park, Seunghyuk;Jeong, Gyo-Cheol
    • The Journal of Engineering Geology
    • /
    • v.29 no.3
    • /
    • pp.329-337
    • /
    • 2019
  • Bottled water companies in Korea are required to conduct an environmental impact assessment of their drinking water supply at least six months before the expiration of their five-year marketing and production license. The water level drawdown, production well water quality, and monitoring well observation results are the most important items that are evaluated in the assessment report. Here we evaluate the relationship between well drawdown and pumping capacity with pumping time from the production wells of bottled water manufacturers located in Cretaceous granite (site A) and Precambrian gneiss (site B). The method to reduce the pumping capacity is more effective in decreasing the drawdown than the method to simultaneously control the pumping and recovery times. Furthermore, the monitoring data from the pH monitoring sensors that were installed in Precambrian gneiss (site C) yield pH values that increase with time and eventually plateau at a certain value. We therefore propose that pH monitoring is either discontinued or improved to provide more reliable and usable results.

Determination of the Groundwater Yield of horizontal wells using an artificial neural network model incorporating riverside groundwater level data (배후지 지하수위를 고려한 인공신경망 기반의 수평정별 취수량 결정 기법)

  • Kim, Gyoo-Bum;Oh, Dong-Hwan
    • The Journal of Engineering Geology
    • /
    • v.28 no.4
    • /
    • pp.583-592
    • /
    • 2018
  • Recently, concern has arisen regarding the lowering of groundwater levels in the hinterland caused by the development of high-capacity radial collector wells in riverbank filtration areas. In this study, groundwater levels are estimated using Modflow software in relation to the water volume pumped by the radial collector well in Anseongcheon Stream. Using the water volume data, an artificial neural network (ANN) model is developed to determine the amount of water that can be withdrawn while minimizing the reduction of groundwater level. We estimate that increasing the pumping rate of the horizontal well HW-6, which is drilled parallel to the stream direction, is necessary to minimize the reduction of groundwater levels in wells OW-7 and OB-11. We also note that the number of input data and the classification of training and test data affect the results of the ANN model. This type of approach, which supplements ANN modeling with observed data, should contribute to the future groundwater management of hinterland areas.

금산지역 균열암반 대수층에서의 수리이방성 해석

  • 강철희;이철우;김용제;김구영;조용찬
    • Proceedings of the Korean Society of Soil and Groundwater Environment Conference
    • /
    • 2003.04a
    • /
    • pp.221-224
    • /
    • 2003
  • 이 연구는 국내의 균열암반에 대한 지하수 유동 연구가 대수층이 등방이라는 가정하에 진행피고 있는 방법에서 벗어나 대수층이 이방성을 띤다는 가정하에 대수층의 수리적 이방성을 해석하는데 중점을 두었다. 수리시험은 30.91 $m^3$/day로 BH-1공에서 300분간 양수였으며, 각각의 관측공 BH-2, BH-3, BH-4, 및 BH-5공에서 시간에 따른 수위강하를 관측하였다. 수리시험에 의해 얻어진 시간별 수위강하 자료를 이용하여 Jacob(1950)의 직선법에 의해서 직선의 기울기(m)와 수위강하가 영이 되는 지점에서의 시간( $t_{0}$)을 계산하였다. 대수층의 수리학적 이방성 텐서 (tensor) 즉, 최대투수량계수텐서 ( $T_{ξξ}$)와 최소투수량계수텐서 ( $T_{ηη}$)를 산출하기 위해서 Stewart(1973)에 의해서 정립된 정규최소제곱(Ordinary least-square)방법을 적용하였으며, 이 방법은 관측공이 최소한 4개를 필요로 한다. 그 결과로, $T_{ξξ}$는 12.21 $m^2$/day이고 $T_{ηη}$는 10.47 $m^2$/day로 산출되었다. 최대투수량계수텐서의 방향은 Nl9.13$^{\circ}$E 이고 이방성율은 1.17로 산출되었다. BH-1공에서 수리시험시 대수층의 이방성은 등방성에 가깝게 표현되었다. 이는 연구지역 대수층이 다수의 균열에 의해서 수리적 상호연결성이 고루 분포된 것으로 판단된다.

  • PDF

Assessment of groundwater inflow rate into a tunnel considering groundwater level drawdown and permeability reduction with depth (터널굴착 중 지하수위 강하 및 깊이별 투수계수 변화를 적용한 지하수 유입량 변화 분석)

  • Moon, Joon-Shik;Zheng, An-Qi;Jang, Seoyong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.2
    • /
    • pp.109-120
    • /
    • 2017
  • Groundwater seepage into a tunnel is one of the main causes triggering tunnel collapse and the consequent ground subsidence. Thus, it is important to estimate adequately the groundwater inflow rate and porewater pressure change during tunneling with time elapse. In current practice, Goodman's analytical solution (or image tunnel method) assuming homogeneous ground condition around a tunnel is commonly used for estimating groundwater inflow rate. However, the generally-used analytical solution for estimating groundwater inflow rate does not consider groundwater level drawdown and permeability change with depth, and the inflow rate can be overestimated in design phase. In this study, parametric study was performed in order to investigate the effect of groundwater level drawdown and permeability reduction with depth, and transient flow analysis was carried out for studying the inflow rate change as well as groundwater level and porewater pressure change around a tunnel with time elapse.

Sensitivity analysis of artificial recharge considering hydraulic conductivity and separation distance from injection well to pumping well (주입정과 양수정의 이격거리와 수리전도도를 고려한 인공함양 민감도 분석)

  • Kang, Dong-hwan;Jo, Won Gi
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2020.06a
    • /
    • pp.285-285
    • /
    • 2020
  • 본 연구에서는 국내 시설농업단지의 수리지질 특성을 고려한 개념 모델을 설정하여 수리전도도와 이격거리(주입정과 양수정 사이의 거리)에 대한 민감도 분석을 수행하였다. 개념 모델에는 자연적 특성(지형과 지질, 강수량, 수리전도도 등)과 인공적 특성(주입정과 양수정의 이격거리, 주입량과 양수량 등)이 입력되었으며, 민감도 분석은 수리전도도(10-1 cm/sec, 10-2 cm/sec, 10-3 cm/sec, 10-4 cm/sec)와 이격거리(10 m, 50 m, 100 m)를 조합한 12개의 시나리오로 수행하였다. 양수정의 하류부에 설정된 관측정의 지하수위 강하량은 수리전도도가 감소하고 이격거리가 멀어질수록 증가하였다. 동일한 이격거리에서 수리전도도에 의한 지하수위 강하량의 회귀분석을 통해 인공함양 대수층의 지하수위 변동은 수리전도도에 의해 지배적인 영향을 받음을 알 수 있었다. 인공함양 대수층의 수리전도도가 10-2 cm/sec 이상인 조건에서는 주입정과 양수정의 이격거리에 따른 지하수위의 영향반경은 20 m 이내이었지만, 수리전도도가 10-3 cm/sec 이하인 조건에서는 이격거리가 멀어질수록 지하수위의 영향반경이 급격하게 증가함을 확인하였다.

  • PDF