• Title/Summary/Keyword: 수로터널

Search Result 60, Processing Time 0.03 seconds

Analysis of the Concrete Lining for Water Pressure Tunnel (수로 압력터널의 콘크리트Lining 해석)

  • 김승권;임정열;공천석;안주옥
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2001.10a
    • /
    • pp.27-33
    • /
    • 2001
  • Objective of this study is to investigate the structural behavior of the concrete lining in water pressure tunnel. In many cases, the concrete lining of water pressure tunnel has not considered as a major structure comparing to the other structures, resulting in use of conservative analysis and design. For the detailed analysis of concrete lining of water pressure tunnel, factors such as rock pressure and water pressure have to be considered. In this study, analysis of concrete lining was performed by using beam element method, shell element method and solid element method. Analysis results showed that the tensile stress at crown of concrete lining is greatly affected by the stability of concrete lining and the tensile stress for the concrete lining has to be evaluated for the section where maximum moment is occurred.

  • PDF

Determination of the Size of Surge Tank with Partition (격벽을 갖는 조압수조의 크기 결정)

  • Kim, Kyoung Ho;Yang, Hai Ryong;Oh, Hyun Sik;Lee, Ho Jin
    • 한국방재학회:학술대회논문집
    • /
    • 2011.02a
    • /
    • pp.159-159
    • /
    • 2011
  • 수자원 공급의 시 공간적 편차가 큰 우리나라에서는 수자원을 이용하기 위해서 다수의 댐을 건설하고 있다. 특히, 생활수준의 향상으로 용수 수요가 급증하였기 때문에 용수가 부족한 곳에는 광역상수도 사업 등을 통하여 용수를 공급하고 있다. 댐에서 용수가 공급되기까지의 과정은 일종의 관수로 흐름으로 생각할 수 있다. 관수로 내를 흐르는 유체가 갑자기 정지하게 되면, 유체 운동 에너지의 변화가 유발되고, 그로 인해 관내에 급격한 압력의 상승이 일어나게 된다. 반대로 정지하고 있던 유체가 빠른 속도로 흐르게 되면 압력 감소가 급격하게 발생한다. 이와 같이 유체 운동 상태의 급변에 의한 압력변화와 그에 따른 압력파가 음속의 속도로 상 하류로 전파되는 현상을 수격작용(waterhammer)이라 한다. 통상적으로 수격작용은 밸브 개폐 정도가 갑자기 바뀔 때, 펌프의 급격한 기동이나 정지 시, 터빈 내 전력소요가 갑자기 바뀔 때, 댐 수위의 갑작스런 변화, 펌프 임펠러의 진동, 물 수요의 급격한 변화 등에 의해 발생하며, 수격작용은 유체의 질량과 운동량 때문에 관 벽에 큰 힘을 가하게 되어 정상적인 동수압 보다 몇 배나 큰 압력을 발생시킴으로 관 자체는 물론 펌프, 밸브, 터빈 등 관 시설물을 파손시키거나 진동, 소음 등을 야기시킴으로 대규모 건물, 공장, 발전소 등을 설계할 경우 그에 대한 적절한 대책을 강구하여야 한다. 특히 댐에 연결된 저수지 또는 조정지로부터의 도수로가 압력수로이며 그 길이가 상당히 크면 수차가 급정지했을 경우 수격작용에 의해서 압력터널 내에 과도한 압력상승이 일어난다. 이 압력상승을 방지함과 함께 발전소 부하의 증감에 따라서 수량을 공급하거나, 흡수할 목적으로 압력도수로와 수압관과의 접합부에 자유수면이 있는 수조를 설치한다. 이것을 조압수조(surge tank)라 한다(최영박, 1979). 조압수조에서 부하의 급속한 차단에 의해서 수차로 유입될 수량이 차단되면 도수로 내로 흘러 들어온 물은 관성 때문에 수조 내의 수위를 상승시키고, 수조 수위가 어느 정도 이상으로 되어 저수지 수위 보다 상승하면 수조로의 유입이 정지하고 반대로 수조에서 저수지로 역류하여 수조수위는 하강한다. 즉, 조압수조는 도수로 내에 발생한 과도한 압력을 수조 내 수면의 승강운동을 이용하여 감소시키고 원래의 안정적인 수위로 회복시킨다. 본 연구에서는 수격작용에 대한 댐 안정성을 확보하는 수단 중의 하나인 조압수조에 대해 살펴보았다. 연구대상으로 용담댐을 선정하였다. 용담댐에 대한 기존의 검토결과 수직 갱의 지름이 5m 이상이면 조압수조의 동적안정조건을 만족 시키는 것으로 조사되었다. 댐의 설계홍수위인 EL. 265.5m를 기준으로 조압수조의 안정성을 감소시키지 않는 범위 내에서 조압수조 내 격벽 설치 유 무에 따른 수조의 최적 크기를 산정하였다. 산정결과를 분석한 결과 동일 조건에서 격벽을 설치한 경우가 격벽을 설치하지 않은 경우에 비해서 조압수조의 면적이 약 21% 감소하는 것으로 나타났다.

  • PDF

Development of Improved Rock Bolt for Reinforcement of Fracture Zone in Slope and Tunnel (사면 및 터널에서의 암반 파쇄대 보강을 위한 개량형 록볼트 개발)

  • Kim, Soo-Lo;Kim, Jong-Tae;Park, Seong-Cheol;Kim, Tae-Heok;Kwon, Hyun-Ho;Jeong, Gyo-Cheol
    • The Journal of Engineering Geology
    • /
    • v.20 no.1
    • /
    • pp.101-109
    • /
    • 2010
  • There are many slopes generally developed by excavation and cut slope with small steps on massive slopes of roads. Especially these cut slopes which excavating around fault fracture zone need a reinforcement technology in order to ensure safety. In the case of slope excavation, it is difficult to use the existing slope support at fracture zone because of geological characteristics. Especially the factor of safety decreases significantly due to the movement of blocks in bed rocks and the expansion of interspace of discontinuous planes in fractured zones caused by excavation. Thus an efficient reinforcement technique in accordance with geological properties of fracture zones needs to be developed because the existing slope support has a restricted application. Therefore it is necessary to develop the specialized rock bolt technique in order to ensure an efficient factor of safety for anomalous fracture zones in slopes and tunnels. The purpose of this study is to develop newly improved rock bolt to increase a supporting effect of the swellex bolt method used recently as a friction type in fracture zones.

Introduction of the Best Practices in the Pakistan Gulpur HEPP (파키스탄 Gulpur 수력발전 현장의 Best Practices 소개)

  • JANG, Ock Jae;HONG, Won Pyo;CHAE, Hee Moon
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.216-217
    • /
    • 2022
  • Gulpur 수력발전 프로젝트는 전력난을 겪고 있는 파키스탄에 102 MW 규모의 수력발전소를 건설하여 30년 동안 운영 관리한 후 파키스탄 정부로 양도하는 IPP(Independent Power Producing) 형식의 투자사업이다. 남동발전과 DL E&C, 롯데건설이 Sponsor로서 출자한 자본금과, ADB, IFC, K-EXIM 등의 대주단로부터의 차입금을 재원으로 하여 소요 사업비를 조달하고 사업을 개발하였다. DL E&C와 롯데건설이 EPC(Engineering, Procurement, Construction)를 수행하였고, 이산이 Design consultant의 역할을 수행하였다. Gulpur 수력발전 프로젝트의 발전형식은 수로식(run-of-river)으로 201 m3/s의 발전유량과 102 MW의 발전 시설용량을 이용하여 연평균예상발전량은 398 GWh이다. 주요 구조물로는 설계 재현빈도 1년의 유수전환시설(가물막이댐 & 가배수터널)과 콘크리트 중력식댐(H 67 m, L 205 m), 도수터널(D 6.7 m, L 215 m, 2기), 옥외형 발전소 (H 51 m, W 60 m, L 38 m, Kaplan 2기)가 있으며, 2015년 10월 착공하여 2020년 3월 상업발전을 시작하였다. 본 프로젝트는 DL E&C의 첫 번째 EPC 해외수력발전 프로젝트이다. 따라서 프로젝트의 성공적 수행을 위한 경제적 설계, 시공의 효율성 및 안정성 확보 등을 위하여 많은 연구를 수행하는 과정에서 다양한 기술 개선을 이룰 수 있었다. 본고에서는 Gulpur 프로젝트를 통하여 도출된 성공 사례들을 소개 및 공유하고자 한다. 첫 번째로 콘크리트 중력식댐 시공을 위한 유수전환시설의 최적 설계빈도를 산정하였다. 일반적으로 유수전환시설의 규모는 설계기준에 제시된 설계 재현빈도를 이용하는데, 해외 설계기준에서는 10년, 국내 설계기준에서는 1~2년으로 다르게 제시되어 있는 문제점이 있다. 유수전환시설의 규모는 프로젝트의 경제성에 큰 영향을 미치기 때문에 최적 설계빈도의 결정이 필요하며, 위험도분석기법(Risk Analysis)과 기대화폐가치법(Expected Monetary Value)을 이용하여 유수전환시설의 최적 설계 재현빈도와 이에 영향을 미치는 인자를 분석하였다. 위험도는 몬테카를로 시뮬레이션으로 산정된 가물막이댐 파괴확률과 재현빈도를 이용하여 산정된 가물막이댐 월류확률을 고려하였으며, 비용 및 피해액으로는 유수전환시설의 공사비, 가물막이댐 파괴시의 재건설비용과 지체보상금, 가물막이댐 월류시의 복구비용을 고려하였다. 이에 대한 연구결과로, 유수전환시설의 사용기간과 월류시의 복구비용이 유수전환시설의 설계 재현기간 결정에 가장 큰 영향을 미치는 것으로 나타났고, 특히 월류시의 복구비용이 작을수록 낮은 설계 재현빈도를 선택하는 것이 타당한 것으로 나타났다. 예를 들어, 유수전환시설의 사용기간이 3 ~ 5년, 복구비용이 0.5 ~ 1.0 mil USD 이하인 조건에서 가물막이시설의 최적 설계빈도는 1년 ~ 2년인 것으로 나타났다. 또한, 유수전환시설의 사용기간은 본댐의 규모와 시공기간 등을 고려하여 결정되는 사항으로 설계자가 임의 조정할 수 없지만, 복구비용은 시공 관리자에 따라 결정되는 부분으로, 적극적 홍수 피해 저감 및 복구방안을 마련하는 것이 프로젝트의 경제성을 향상시킬 수 있다는 것을 알 수 있었다. 두 번째로 프로젝트의 경제성 향상, 홍수기 댐 시공시의 안전성 확보를 위하여 홍수 조기경보시스템(Early Warning System)을 개발 및 활용하였다. 수로식(Run-of-river) 수력발전댐은 대부분 산악지역에 위치하기 때문에 국지성 강우 및 급한 지형 경사로 인하여 돌발홍수(flash flood)의 발생 가능성이 높다. 따라서 시공 중 홍수(월류) 발생을 미리 감지하고 현장에 전파할 수 있는, 수로식(Run-of-river) 수력발전댐 현장을 위한 홍수 조기경보시스템이 필요하며, 이를 리스크 인식, 모니터링 및 경보, 전파 및 연락, 반응 능력 향상의 4가지 부분으로 나누어 구축하였다. 리스크 인식 부분에서는 가물막이댐 월류 발생 상황에 대한 위험도, 취약성, 리스크를 제시하였으며, 모니터링 및 경보 부분에서는 상류 측정수위에서 유도된 현장 예상수위와 실제 현장 측정 수위를 대상으로 경보홍수위와 위험홍수위로 나누어 관리하였다. 전파 및 연락 부분에서는 현장 시공 조직을 활용하여 홍수시를 대비한 비상연락체계도(Emergency communication flow chart)를 운영하였으며, 반응 능력 향상을 위해 비상연락체계도의 팀별 Action plan을 상세화 하였다. 세 번째로 현장의 지질특성과 50여 차례 발파시험으로 현장 고유의 발파진동감쇄곡선을 도출하였으며, 이를 통해 현장의 시공성과 콘크리트 품질 확보를 동시에 달성할 수 있는 방안을 제시하였다. 콘크리트댐 공사에서는 제한된 공기 내에 공사를 완료하기 위해 사면부 굴착과 콘크리트 타설이 동시에 수행될 수밖에 없는 문제점을 가지고 있다. 그러나 신규 콘크리트 타설면 근처에서 발파를 수행하는 경우 발파로 발생되는 탄성파가 일정 수준을 초과하게 되면, 콘크리트 양생에 영향을 주게 된다. 따라서 다수의 현장 발파시험을 통해 발파거리와 최대진동속도의 상관관계 즉, 발파진동감쇄곡선을 도출함으로써 현장의 발파진동특성을 도출할 수 있었다. 또한, 기존 연구 논문들을 통해 콘크리트 재령기간 별 안전진동속도를 선정하고, 해당 안전진동속도를 초과하지 않는 범위에서 콘크리트 타설면과 발파위치의 거리에 따라 1회 발파 가능한 장약량을 산정하여 적용하였다. 이와 같은 체계적인 접근을 통해 콘크리트 타설과 발파 작업 동시 수행에 대한 논란을 해소할 수 있었다.

  • PDF

A Case Study of Underwater Blasting (수중발파 사례 연구)

  • 정민수;박종호;송영석
    • Explosives and Blasting
    • /
    • v.22 no.3
    • /
    • pp.57-64
    • /
    • 2004
  • There are two major types of underwater blasting at Korea, bridges and harbor construction work. Pier blasting for lay the foundation bridges construction is used dry excavation working (drilling and charging) after pump out water and then fire pump in water that is same as bench blasting. In contrast, underwater blasting for harbor construction and increase of harbor load depth is used to barge with digging equipment that is in oder to drilling on the surface and blasting work(charge, hook-up) under water. Thus, there are need to special concern such as charge method and hook-up method different from tunnel blasting work and bench blasting work. If do not use special concern breaks out dead pressure and mis fire because of there are so many difficult condition such as water pressure, obstruct field of vision. In this study underwater blasting at Busan Harbor Construction have consider with special concern that is plastic pipe charge method used to MegaMITE I and specialized buoy hook- up method make far initial system detonate on the surface used to TLD. The results is designed blast pattern charge per delay effect an inspection of verify between predict velocity and measure velocity. minimized break out mis fire consideration charge method, hook up method. According to result best underwater blasting design is 105mm drilling dia, MeGAMITE II, HiNLL Plus(non electric detonator).

Initial Fixation Power of Human Bone Interference Screw (인간 골 간섭 나사못의 초기 고정력)

  • Kim Jung-Man;Chung Yang-Kook;Kim Yang-Soo;Oh In-Soo;Koh Ihn-Joon
    • Journal of Korean Orthopaedic Sports Medicine
    • /
    • v.1 no.1
    • /
    • pp.26-30
    • /
    • 2002
  • Purpose: To estimate the initial and early phase fixation power of the human bone interference screw in reconstruction of the anterior cruciate ligament with bone-patellar tendon-bone allograft. Materials and Methods: The results of twenty eight knees of reconstruction with bone-patellar tendon-bone allograft were analysed in 6 weeks, 12 weeks, 6 months and one year following operation. Physical examination including Lachman test, flexion rotation drawer test and jerk test were performed. The KT-1000 measurement was performed at the same time. In Lachman test 0 $\~$2mm anterior displacement of the tibia was considered normal. The KT-1000 measurement of normal side was compared with operation side and the difference of the two was recorded. The MRI was checked at final follow-up. Results: All but one knee showed normal in physical examination. The failed case showed proximal migration of the graft due to insufficient number of interference screw fixation in widened tibial tunnel. Conclusions: The human cortical bone interference screw showed sufficient initial and early phase fixation power in reconstruction of the anterior cruciate ligament.

  • PDF

A Study on the Development of Rapidly Hardening Grouting Method for the Effective Filling in the Underground Cavity (지하공동의 효율적 충전을 위한 급결 충전 그라우트공법개발에 관한 연구)

  • Kim, Soo-Lo;Kim, Tae-Heok;Shin, Dong-Chun;Kwon, Hyun-Ho
    • Tunnel and Underground Space
    • /
    • v.19 no.6
    • /
    • pp.534-544
    • /
    • 2009
  • The collapse of the underground cavity can cause the abrupt local subsidence of the ground surface. It can be hazardous to the stability of road and building for human activity. Therefore it is necessary to develop reinforcement methods for the filling of the underground cavity. This study was executed to improve the material quality and systems to fill the calcium-aluminate mineral $(C_{12}A_7)$ environmentally, and minimize the loss of filling materials for the steep underground cavity. Filling material which was developed in this study is composed of rapid hardening material and additives. The developed material had rapid hardening and non-separation ability in the water cavity condition, so it made the effective underground dam in the cavity with prevention of material loss when it was poured in the water cavity. Results of heavy metal leaching test for environmental assessment showed that it was environmentally suiTable material for the filling in the mine cavity.

Study on High-efficiency Hydraulic Filling Field Experiment for Subsidence Protection (지반침하 방지를 위한 고효율 수압식 충전 현장실험에 관한 연구)

  • Yang, In-Jae;Choi, Nam-Soo;Jeon, Chul-Soo;Lee, Sang-Eun;Shin, Dong-Choon
    • Tunnel and Underground Space
    • /
    • v.24 no.5
    • /
    • pp.373-385
    • /
    • 2014
  • Hydraulic filling methods are widely applied to suppress the land subsidence recently. But the research on high-efficiency hydraulic filling to protect the land subsidence is rare. In this study, field experiments to improve the efficiency of the hydraulic filling method are performed by changing the property, specification of the filling material and injection pipe. The filling amounts using vertical injection pipe, reducing tee (${\phi}100mm$) pipe, reducing tee (${\phi}80mm$) pipe and reducing tee (${\phi}50mm$) pipe showed 28.84 ton, 42.62 ton, 53.33 ton, and 63.33 ton respectively. The filling rates using reducing tee (${\phi}100mm$) pipe, reducing tee (${\phi}80mm$) pipe and reducing tee (${\phi}50mm$) pipe showed 47.8%, 84.9% and 119.6% respectively. Filling efficiency can be incresed by using reducing tee. This study shows that simply changing the type of injection pipe is expected to increase the hydraulic filling rate.

Research and Development Trends for Mine Subsidence Prevention Technology in Korea (한국의 광산 지반침하방지기술 연구개발 동향)

  • Kim, Soo Lo;Park, Joo Hyun
    • Tunnel and Underground Space
    • /
    • v.25 no.5
    • /
    • pp.408-416
    • /
    • 2015
  • The collapse of the underground cavities and voids, which were made for developing mineral resources, can cause the subsidence of the ground surface in the residential areas. During the Japanese colonial era and the 1960's mining boom period, lots of mines had been developed indiscriminately in Korea. Due to complicated geological conditions and mining methods, many of dangerous underground mine cavities with steep slopes had been generated at the shallow surface. Due to such conditions, it is difficult to directly apply valid foreign reclamation practice for the cavities in Korea environments. It is necessary to develop the efficient ground stabilization technologies for the Korea underground mine conditions to solve abandoned mine reclamation properly. Therefore, MIRECO and Korea government have been carrying out practical researches and technical developments together with other academic researchers and reclamation business partners, and various practical solutions such as surveying and exploration methods, proper cavity filling materials and reinforcement methods have been developed with application in the mine field. In this article, up to date technologies and R&D trends in the field of mine subsidence prevention technology are broadly reviewed to establish the future direction of a research and development.

Experimental Study on Grouting materials of Grout Column Method for Reinforcement Technology in Groundwater-saturated Mined Cavity (지하수로 포화된 채굴공동 보강을 위한 골재 그라우트 기둥공법의 그라우트 재료에 관한 실험적 연구)

  • Choi, Woo-Seok;Kang, Byung-Chun;Shin, Dong-Choon;Kim, Soo-Lo;Kim, Eun-Sup
    • Tunnel and Underground Space
    • /
    • v.26 no.5
    • /
    • pp.418-430
    • /
    • 2016
  • In this study, experimental study on cement grout materials containing anti-washout admixtures or accelerators in grout column for reinforcement technology in groundwater-saturated mining cavity was conducted. As a result, the cement milk containing anti-washout admixtures was suitable for mixed aggregates, and the cement mortar containing anti-washout admixtures and the cement milk containing accelerators were suitable for crushed stone aggregate in terms of forming grout column. Especially, in the case of crushed stone aggregate injecting the cement milk containing accelerators, the diameter of the grout column was greatest and the void of the crushed stone aggregate was filled with grout materials. Therefore the case of crushed stone aggregate injecting the cement milk containing accelerators is considered for optimal grout materials and aggregate.