Study on High-efficiency Hydraulic Filling Field Experiment for Subsidence Protection
![]() |
Yang, In-Jae
(한국광해관리공단 광해기술연구소 지반안정기술팀)
Choi, Nam-Soo (한국광해관리공단 광해기술연구소 지반안정기술팀) Jeon, Chul-Soo (벽산엔지니어링(주) 지반사업부) Lee, Sang-Eun (강원대학교 삼척캠퍼스 에너지자원 공학과) Shin, Dong-Choon (벽산엔지니어링(주) 지반사업부) |
1 | Kim, T.H., et al., 2012, Development of tip Device for Hydraulic Filling Efficiency Improvements, Vol 22, p 403-411. 과학기술학회마을 DOI |
2 | Karfakis, M. G., 1993, Residual Subsidence over Abandoned Coal Mines, Comprehensive Rock Engineering, Vol 5-1, p 451-476. |
3 | Kwon, H.H., K.S. Nam, 2007, Mine Reclamation Engineering, Donghwa Technology Publishing Co., pp. 169-171. |
4 | 정영욱, 2008, 광산채굴공동 충전법 및 적용 사례, 광해방지기술, pp. 20-28. |
5 | MIRECO, 2010a, Design report for Geumgok Mineground reinforcement. |
6 | MIRECO, 2010b, Design report for Samsanjeil Mineground reinforcement. |
7 | MIRECO, 2011, Design (1 region) report for MugeukMine ground reinforcement. |
![]() |