Constructing Topographies of EMF Risks from Underground Power Lines (전자파 위험 지형도의 상이한 구성: 지중 송전선로 위험 논쟁을 중심으로)

  • Kim, JooHui
    • Journal of Science and Technology Studies
    • /
    • v.19 no.3
    • /
    • pp.119-166
    • /
    • 2019
  • The risk of electromagnetic field(EMF) from power lines has been heavily disputed whenever high-voltage power line towers were built in South Korea. Local communities and civic groups had regarded burying the lines in the ground as an alternative to building power line towers. In 2014, however, when an elementary school science teacher reported the results of EMF measurements over the underground power lines to the Asian Citizens' Center for Environment and Health (ACCEH), the risk controversy over underground power lines took a whole new turn. The level of EMF from underground power lines turned out to be higher, and therefore more harmful than that from power line towers. In the debates that took place from then on over the EMF risk, ACCEH and NIER(National Institute of Environmental Research) presented conflicting topographies of EMF risk. This paper examines measuring practices of ACCEH and NIER by analyzing the measuring sites, measuring devices, and measuring heights chosen by each organization. This paper further examines how ACCEH and NIER mobilized various standards(EMF exposure limit, measurement guideline, categorization of carcinogens) differently. This controversy on the EMF from underground power lines of Seoul has raised concerns on the non-thermal effects of EMF in the long-term exposure and has led people to question whether burying the power lines is the safe alternative to building power line towers. Furthermore, this suggests conflicting answers on whether Seoul, where 90 % of transmission lines were already buried, is a safely managed place or not.

A Study on the Indirect Benefits of Undergrounding Overhead Power Line Projects in an Urban Area Using Contingent Valuation Method (조건부가치측정법(CVM)을 이용한 도심지 송전선로 지중화사업의 간접편익 추정)

  • Park, Chan-Ho;Kim, Sung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.6D
    • /
    • pp.871-879
    • /
    • 2008
  • Recently, as there are a rise in the standard of living and higher concerns of an electromagnetic wave and environment, undergrounding the aerial cables which are supported by large pylons and generally considered as the least attractive feature of an urban area is on an increasing trend to improve aesthetic benefits and electric reliability. This study applied Contingent Valuation Method (CVM) which is expected to become an effective tool to measure indirect benefit to estimate the substantial benefits of undergrounding overhead power line projects in an urban area. The tunneling construction project of the 345kV Shinsungnam electric power cable in Seongnam city was selected and a hypothetical scenario was given to respondents to determine their levels of Willingness to Pay (WTP) for undergrounding overhead power lines. The result from the estimation of the WTP of undergrounding overhead power lines in Seongnam city was calculated as approximately 17.1 billion won. Placing existing overhead lines underground is difficult to justify economically. Most undergrounding costs appear to be justified by aesthetic and public policy considerations. Therefore, considering the result of this study, undergrounding overhead power lines is of great benefit to public.

송전계통의 지중화 계획 - 지중송전

  • 김세일
    • 전기의세계
    • /
    • v.37 no.10
    • /
    • pp.4-10
    • /
    • 1988
  • 본고에서는 국내 지중송전선 기술 및 건설의 안정기이며 또한 90년대의 345KV급 지중송전선로 건설을 준비하는 단계인 현재상황에서 과거의 국내 지중송전선의 성장과정과 장차의 전망을 개괄적으로 다루어 보고자 하며 본고가 국내 지중송전선의 흐름을 개관하는데 도움이 되었으면 한다.

  • PDF

지중배선 및 송전케이블공사 감리실무

  • 한국전력기술인협회
    • Electric Engineers Magazine
    • /
    • v.222 no.2
    • /
    • pp.45-54
    • /
    • 2001
  • 우리나라의 배전 지중화는 1973년 효자동에서 광화문까지 복잡하게 시설되어 있는 배전선을 선로 정비측면에서 도로변 전주를 뒷골목으로 이설하고 저압케이블을 사용하여 수용가에 지중으로 전기를 공급함으로써 시작되었다.

  • PDF

Evaluation of Extremely Low Frequency Magnetic Fields emission Level from High Voltage Transmission Lines (고압 송전선로에서 극저주파 자기장 영향평가 적용에 관한 연구)

  • Jung, Joon Sig;Choi, Sung Ho;Jeon, Hyung Jin;Kim, Yoon Shin;Hong, Seung Cheol
    • Journal of Environmental Impact Assessment
    • /
    • v.23 no.5
    • /
    • pp.353-363
    • /
    • 2014
  • The purpose of this study was to investigated the ELF-MF emission level of various environments such as 258 facilities near located to high voltage transmission lines and 120 high voltage transmission lines, 17 underground cable lines. In addition, ELF-MF reduction rate according to separation distance was calculated by using simulations. An appropriate separation distance showing below 4mG was at least 70m. In the case of the appropriate separation distance for 120 high voltage transmission lines, 154kV required 20m of separation distance and 345kV required 60m of separation distance. The simulation results showed that the appropriate separation distance showing below 4mG was 40m and 60m for overhead 154kV and 345kV respectively. To adjust the worst conditions considering the aspects of environmental impact assessment study and the electric power currents that will increase in the future, the appropriate minimum separation distance for HVTL is judged to be above 70m in this study. Thus, there is a need to establish the greenbelt or buffer zone within 70m so as to create an environment in which the receptors are not exposed and thereby eliminate the risk factors of ELF-MF against humans.

Analysis on Design Technologies for the Development of GIL Localization (가스절연송전선로(GIL) 국산화 개발을 위한 설계기술 분석)

  • Jang, Tae-In;Kim, Jin;Kang, Ji-Won;Bae, Ju-Ho;Nam, Seok-Hyun
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.430-431
    • /
    • 2008
  • 최근에 전력설비에 대한 시각적 효과, 전자계 등 민원으로 인하여 대용량 가공송전 선로를 지중화할 수 있는 가스절연 지중송전선에 대한 관심이 고조되어 이에 대한 국산화 개발이 진행되고 있다. 본 논문은 국산화 개발로 추진 중인 GIL 시스템의 개발을 위한 주요 기술사항을 분석한 것으로 GIL 시스템의 효율적 설계를 위한 내용을 다룬다. 이 결과들은 향후 GIL시스템의 국산화 개발 실시설계에 적극 반영될 예정이다.

  • PDF

Overvoltage Analysis on GIL - Overhead Transmission Line by Lightning Surge Conditions (GIL-가공송전선로 연계시 뇌써지에 의한 과전압 검토)

  • Park, Hung-Sok;Jang, Tae-In;Kang, Ji-Won;Yoon, Hyung-Hee
    • Proceedings of the KIEE Conference
    • /
    • 2008.10a
    • /
    • pp.143-144
    • /
    • 2008
  • 최근 국내에서 가스절연송전선(GIL: Gas Insulated Transmission Line)의 실계통 도입을 인하여 345kV급 GIL의 개발 및 적용을 위한 연구 및 검토가 수행되고 있다. 이 중의 하나가 가공송전선로 사이의 일부구간을 지중화 하여 GIL로 대치할 경우에 나타날 수 있는 써지에 의한 과전압의 검토이다. 가공선로의 일부구간을 GIL로 대치하는 데 있어서, 변전소 단이 원거리일 경우에는 변전소 내부의 차단기나 단로기 등 개폐 써지에 의한 과전압의 영향은 감쇄효과로 인하여 그다지 크지 않으며, 뇌써지에 의한 과전압이 주요 영향 요소로 작용하고 있다. 따라서, 본 논문은 뇌써지에 의한 GIL-가공선로 구간의 과전압을 검토하기 위하여 GIL과 인접한 가공선로 구간에 낙뢰가 유입된 경우를 가정하여 GIL에 발생되는 과전압 및 보호협조 방안을 분석한다.

  • PDF

The Analysis of the Electromagnetic Force Generated by the Fault Current of Cable (지중케이블 고장전류에 의한 단락전자력 영향분석)

  • Kim, N.Y.;Kim, J.N.;Kim, S.Y.;Kim, C.S.;Jeon, S.I.
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.426-427
    • /
    • 2008
  • 전력의 안정적 공급, 공급 신뢰도 향상 및 도심지 인구밀집 지역의 전력공급 및 미화 등의 축면에서 송전분야에서의 지중화는 필수적이며 지속적으로 증가추세에 있다. 그러나 제한적인 지중공간을 활용함에 따른 여러 문제가 발생하고 있다. 지중선로 고장상황으로 1선 지락, 2선지락, 선간단락, 3상단락 등의 사고가 있으며 이러한 고장상황에서 발생하는 고장전류에 의한 열거동은 지중선로에 악영향을 준다. 그러므로 각 고장상황에 따른 지중선로의 영향에 대한 세부적인 검토가 필요하다. 본 논문에서는 각 고장상황에 따른 검토조건으로 1회선과 2회 선일 경우와 상배열이 정삼각배열, 수평/수직배열, 직각배열일 경우를 선정하여 지중선로에 미치는 영향을 EMTP, IDEARS, MARC를 활용하여 분석하였다.

  • PDF

A Study on the GIL Modeling by ATP/Draw(EMTP) (ATP/Draw를 이용한 GIL 모델링 기법 연구)

  • Park, Hung-Sok;Jang, Tae-In;Kang, Ji-Won;Kim, Jin
    • Proceedings of the KIEE Conference
    • /
    • 2008.11a
    • /
    • pp.307-308
    • /
    • 2008
  • 345kV 4복도체 이상의 가공선로를 GIL로 지중화 대치하기 위한 검토사항 중의 하나로서 GIL-가공선로 연계시의 과전압 접지방식 순환전류 등의 특성을 검토할 필요가 있다. 이를 위해서는 GIL을 포함하는 승전계통을 EMTP로 모델링하여 실계통에 나타날 수 있는 다양한 현상 및 특성을 분석할 필요가 있으나, 현재 전력계통 과도현상을 모의 할 수 있는 ATP/Draw(EMTP) 상에는 GIL을 모델링하기 위한 명시된 모델이나 방법이 존재하지 않아 현상 분석에 어려움이 있다. 따라서, 이 논문은 가공선로 중간의 일부구간에 GIL이 존재할 경우에 있어서 ATP/Draw(EMTP)를 이용한 GIL 및 가공송전선의 혼합선로 모델링에 대한 내용을 다루며, 구체적으로 GIL에 대한 모델링 시 GIS 또는 Cable 모델을 이용한 모의방법을 비교분석하여 적합한 방법을 제안한다.

  • PDF