• Title/Summary/Keyword: 성과기반관리

Search Result 1,964, Processing Time 0.029 seconds

A Study of the Operation Management Strategy on the National Critical Infrastructures : Transportation and Logistics Sector

  • Chung, Sung-Hak
    • Journal of the Korea Society of Computer and Information
    • /
    • v.26 no.3
    • /
    • pp.89-97
    • /
    • 2021
  • The objective of this study is to propose an operation management strategy for the connectivity which are the designated and managed in sector of the transportation and logistics on the national critical infrastructures. The industrial structure is becoming advanced. The national critical infrastructure managed by the shows forms of the cooperative connection and collaborative R&D. Also, in-depth and specific analysis for the disaster safety budget are implemented to consideration for the R&D life cycle. The government responsibility are expanded comprehensively. Needs are exchanging life styles by the economic and safety demands. At this trends, this study encourage facility maintenance and scientific management to the public service. Throughout the result of this study, national critical infrastructure are implementing for protection plan of the sustainable maintenance and management. And, we have to prepare and implement for the consideration of the characteristics through comprehensive guidelines. This study contributes to the disaster and safety management by proposed an operation strategy of the cooperative connection in the sector of transportation and logistic sector on the national critical infrastructure.

Developing a Reference Model of Korean Recordkeeping System for Integrated Information Resources Management (통합적 정보자원관리를 위한 국가기반 전자기 록관리시스템 참조모형 구축에 관한 연구)

  • Suh, Hye-Ran;Seo, Eun-Gyoung;Lee, So-Yeon;Oh, Kyung-Ju;Jeong, Won-Shik
    • Journal of the Korean Society for information Management
    • /
    • v.23 no.1 s.59
    • /
    • pp.301-333
    • /
    • 2006
  • The study is to propose the reference model of Korean record management for integrated information resources management, based on the Korean regulative and administrative environments. Therefore, the study suggests the reasons why the electronic records must be come to the one of the national knowledge and information resources and reviews several integrated information management systems such as GKMS, KADO, ERA, EUN, and COVAX. Next, the study proposes the integrated records management system architecture, integrated national knowledge and information management environment architecture, and information technology architecture for Integrating resource management environment.

Web Based Environmental Management System using Predictive Spatial Information Models (예측적 공간정보 모형을 이용한 Web 기반의 환경관리시스템의 개발 및 적용)

  • Kim, Joon Hyun;Han, Young Han
    • Journal of Environmental Impact Assessment
    • /
    • v.8 no.4
    • /
    • pp.47-57
    • /
    • 1999
  • This study is aimed at the development of comprehensive environmental management system, which can be operated on the basis of world wide web, as a topic of G7 project. Even though there should be lots of works remaining to achieve this goal, preliminary products can be summarized as follows : 1) integrated environmental information management system, 2) web based control engine, 3) surface water environment management system, 4) subsurface water environment management system, 5) sewer and waterworks management system. The core methodology of the engine is the generalized multidimensional finite element matrices to depict the terms in the analysis of various partial differential equations. Spatial information management system (ArcView) and Visual Basic were extensively employed to construct GUI oriented web based engine. The developed systems were composed of very intense computer codes due to the necessity of combinatory management of environmental problems. The web based engine could be served as a decision tool for the integrated management of environmental projects in Korea.

  • PDF

A Proposal of Secure and Efficient Dynamic Multicast Key Management Structure (안전하고 효율적인 동적 멀티캐스트 키 관리 구조 제안)

  • 박희운;이임영
    • Journal of Korea Multimedia Society
    • /
    • v.4 no.2
    • /
    • pp.145-160
    • /
    • 2001
  • With the rapid of computer applications and digital communication networks, group based applications on the open network have been common tendency. The multicast infrastructure has played an important researching part in this application area. However the conventional solutions to achieve the secure and efficient structure don't satisfy all requirements. In this study, we classified and analyzed several existing multicast key management structure on the safety, the efficiency and the strengthen. Based on the analysis, we developed a new secure and efficient multicast key management structure. By comparing various aspects, that the number of communication and computation, of the new and the conventional methods, we were able to demonstrate the effectiveness of the proposed method.

  • PDF

An Empirical Study on the Obligations of Contractual Parties for Successful IT Outsourcing (성공적인 IT 아웃소싱을 위한 계약당사자간 책임 요소에 대한 실증 연구)

  • Kim, Young-Gon
    • Journal of the Korean Society for information Management
    • /
    • v.24 no.3
    • /
    • pp.21-41
    • /
    • 2007
  • IT outsourcing has become a critical component of organizations, but improper expectations, ambiguous contracts and unclear goals frequently cause the failure of IT outsourcing. Especially we have to be concerned about the uncareful management of customer-supplier relationships based on a psychological contract perspective. This study focuses on the obligations of contractual parties for IT outsourcing which influence the outsourcing relationship(OR) and the successful performance of IT outsourcing(OP). The supplier obligations consist of the achievable infrastructure(S1) and capability(S2), and the customer obligations is composed of the acceptable environment(C1) and acceptability(C2) for IT outsourcing. This paper shows that the S1, S2, and C2 have an effect on the OR, the OR on the OP, and the S2 also on the OP directly. The four components of customer-supplier obligations are mutually related to each other. What is more, we must notice that the S2 has strong connections with the C2.

Improvement of Cost-Schedule integration based Progress Management through PMIS (비용-일정통합기반 진도관리 개선방안)

  • Yoon, You-Sang;Suh, Sang-Wook;Jang, Gyu-Seong;Choi, Jang-Shik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.144-152
    • /
    • 2013
  • Recently construction projects become more bigger. So construction companies have being performed cost and schedule management task by using PMIS. In engineering and construction phase, progress management which occur the most frequent information I/O(input and output) should be managed effectively by PMIS. Although most information by PMIS manage efficiently, cost-schedule information for progress management is difficult to be managed due to recurrent information input. thus when changed by price fluctuation and change order, progress management could not connnect cost information with schedule information. So it caused inaccuracy of progress measurement and data increase in PMIS. To solve this problem, This study suggests improved module for progress management through integration of cost-schedule using quantity take-offs as progress measurement method.

Practical Project Behavior Management Methods for Large-scale IT Projects (대규모 IT 프로젝트를 위한 실용적 행태관리 방안)

  • Kim, Min-Seon;Song, Sung-Hwan;Kim, Yong-Sik
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.7
    • /
    • pp.4897-4911
    • /
    • 2015
  • Technology developments accelerate the change of the society and companies with unparalleled pace, so large scaled projects are in progress urgently. Large scaled projects deal with high technologies and massive tasks, and these need enormous labor force and costs, it is necessary to manage strategic conflicts based on human psychology and complex system theory. However, traditional management plan fails to suggest practical mechanism for successful projects. We study failure cases and key elements, leadership for projects, and suggest project management plan with psychological and behavioral economy approach by focusing on complexity and conflict structure on large scaled projects. Project behavior management plan, suggested in this study, is designed with phased strategy and practice to solve the failure of large scaled IT projects originally and preemptively. We verified the effectiveness of behavior management plan suggested by investigating experts and working groups, and stable projects are to be progressed with introducing this plan on large-scaled projects.

Media Caching in Video Server with Mass Storage (대용량 비디오 서버의 미디어 캐슁)

  • 이종민;박병준;차호정
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2001.04a
    • /
    • pp.94-96
    • /
    • 2001
  • 본 논문은 Tertiary 저장장치에 기반한 대용량 비디오 서버를 위한 미디어 캐슁 시스템의 설계와 구현에 대해서 기술한다. 대용량 비디오 서버를 위한 미디어 캐쉬는 디스크 저장 장치를 캐쉬 장치로 사용한다. 캐쉬 관리는 서비스의 안정성을 위해 고정 크기의 캐쉬 블록 단위로 관리되며 캐쉬 교체 정책 또는 연속 미디어의 특성을 고려하여 서비스의 안정성과 연속성을 보장 할 수 있도록 하여야 한다. 제시된 캐쉬 관리 정책과 캐쉬 교체 정책을 실제 구현된 서버를 바탕으로 성능 분석한다.

Design & Implementation of System Management Tool based on the internet developed by MVC (MVC 프레임워크를 적용한 웹 기반의 시스템 관리 도구의 설계 및 구현)

  • 김지연;안창원
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2003.10a
    • /
    • pp.331-333
    • /
    • 2003
  • 스몰토크-80의 사용자 인터페이스는 MVC (Model/View/controller) 프레임워크에 입각하여 디자인되었다. 그 이후 MVC 프레임워크는 많은 시나리오에서 사용되고 있다. MVC 프레임워크를 적용하여 웹 어플리케이션을 개발하면 시스템 개발 및 유지 보수가 쉬워지며 확장성과 성능 향상에 도움을 준다. 본 논문에서는 MVC 프레임워크를 적용하여 시스템 관리 도구를 설계하고 구현한다. 더 나아가 MVC 프레임워크의 단점을 보완한 방법을 제시하고 이를 시스템 관리 도구에 적용하여 본다.

  • PDF

Development of Digital Quantity Database Standard (디지털 수량산출정보 교환표준 확장 방안 마련)

  • Moon, Jin Seok;Han, Choong Han
    • Annual Conference of KIPS
    • /
    • 2013.05a
    • /
    • pp.776-777
    • /
    • 2013
  • 디지털 수량산출정보 교환표준" 건설CALS/EC 체계 내에서 사용되는 공정 공사비 관리를 위한 디지털 수량산출정보 관련 표준의 기본 요건을 정의하고 참여주체간의 효율적인 수량산출정보의 교환 및 공유기반을 마련함을 목적으로 2011년 4월에 제정되었다. 해당표준의 활용성과 확장을 위하여 스키마를 추가 개발하며, 건설사업관리시스템과 연동하여 사업참여 주체간 정보공유와 관리가 가능하도록 하였다.