• Title/Summary/Keyword: 설비 비용

Search Result 960, Processing Time 0.029 seconds

Economic Analysis of High-Efficiency Production Facilities using Capital Recovery Factor (자본회수계수를 고려한 고효율 생산설비의 경제성분석)

  • Park, Hyung-Joon;Chung, Chcn-Soo
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.21 no.7
    • /
    • pp.117-123
    • /
    • 2007
  • This paper is about the economic analysis of the replacement of electric facilities in the production facilities. As the interest of energy is increasing, the efficiency of facilities become more important. So, in this paper, we diagnosed facilities, especially electric motors, in the plant and calculated the operating efficiency, power loss with the load factor. And when we replace these facilities into high-efficiency motors, we also calculated new energy efficiency, energy loss and economic analysis through capital recovery factor. As a result, we economically proved that using high-efficiency motor is more beneficial than using non-high-efficiency motors in the model process.

Report on construction cost of preliminary power facilities (정전대비 비상발전시스템 구축에 관한 경제성 평가)

  • Nam, Su-Hyun;Jung, Won-Sik;Moon, Hyung-Jun;Moon, Young-Hyun
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.626-627
    • /
    • 2011
  • 본 논문은 전기연구원에서 수행한 1차년도 조사인 수용가별 정전비용 산정에 대한 자료를 바탕으로 각 수용가별 적정 예비전원 설비 구축비용의 산정에 대해 논의하고자 한다. 각 수용가별 적정 예비 전원설비비용을 산정하기 위해 우선적으로 정전 시 수용가가 필요로 하는 예비전력량과 평균 정전시간에 대해 조사될 필요가 있다. 본 논문에서는 1차년도 조사 자료를 바탕으로 수행되었기 때문에 1차년도 자료에서의 사용전력량 전체를 예비전력량으로 계산하도록 하였다. 각 수용가별 예비전력량으로부터 설치될 UPS 용량과 비상발전기 용량을 선정한다. 평균정전시간은 각 수용가별로 조사된 정전시간으로부터 평균값을 구하여 절상하도록 하였다. 선정된 UPS 용량과 비상발전기 용량으로부터 설치비용을 계산한다. 본 과제에서는 2011년 표준품셈과 2011년 시중노임단가를 참고로 설치비용을 계산하였다. 산출된 수용가별 설치비용과 이전에 조사된 정전비용으로부터 회수기간을 구하였고, 이 값을 지표로하여 각 수용가별 예비전원설비에 대한 타당성을 판단하였다.

  • PDF

SHOP DWG 비용 계상 위해 품셈제정 필요

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.12 s.185
    • /
    • pp.45-50
    • /
    • 2005
  • 본지는 지난 7월호부터 현장의 SHOP DWG 현황에 대한 기획연재를 하였다. 7월호에는 우양기건(주)의 반도체 공사현장의 SHOP DWG과 8월호 (주)세보MEC의 연대 세브란스 새병원의 SHOP DWG, 9월호에는 (주)우원의 국립중앙박물관의 SHOP DWG, 11월호에는 (주)우진아이엔에스의 오피스텔 현장의 SHOP DWG을 연재하였다. 이번 호에는 그동안 연재를 하면서 도출된 SHOP DWG의 현황 및 문제점을 지적하고 앞으로의 발전방향을 가늠하는 총론을 펼친다. 설비건설업계에서 SHOP DWG은 이제 공사현장에서 필수로 자리잡을만큼 공사현장에서 꼭 필요한 부분으로 자리잡았다. 그러나 일부 건설사를 제외한 대부분의 건설사들이 SHOP DWG 비용을 외면하고 있어 설비건설업계가 그 비용을 고스란히 부담하고 있는 실정이다. 이번 호는 SHOP DWG 실태와 문제점을 정리하여 본다.

  • PDF

비용 제약 조건 하에서의 최대 지역 커버 문제에 관한 연구

  • 홍성학;이병기;이영훈
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2003.05a
    • /
    • pp.129-136
    • /
    • 2003
  • 설비입지문제는 고객에게 좋은 서비스를 제공하면서 전체 비용을 최소화하는 의사결정을 요구한다. 본 논문은 제한된 총 투자 비용 하에서 최대의 서비스 수준을 달성하기 위하여 고정비를 가지는 설비의 입지를 결정하는 문제에 관한 것이다. 이 문제에 대해 수리 모형을 제시하고, 라그랑지안 기법을 이용한 발견적 기법을 통하여 해를 구하였다. 문제의 상한(Upper Bound)은 서브그래디언트(Subgradient) 최적화 기법을 사용하여 구하였고, 하한(Lower Bound)을 구하기 위하여 커팅(Cutting) 알고리즘이라는 새로운 기법을 개발하여 적용하였다. 임의로 생성된 데이터를 이용하여 비용과 커버 가능거리라는 두 가지 관점에서 실험을 하고 제안된 알고리즘의 성능을 비교 분석하였다.

  • PDF

An Benefit-cost Analysis of the Cleaning Device for Photovoltaic Power Generation Systems in Buildings (건축물에 설치된 태양광발전설비를 위한 세척장치의 편익-비용 분석)

  • Kim, Jae-Yeob;Won, Jongsung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.6
    • /
    • pp.587-594
    • /
    • 2016
  • This study aims to analyze the benefit-cost of the cleaning device for photovoltaic power generation systems in buildings in order to check its economic feasibility. A product, which has similar characteristics to the ultrasound-based cleaning device and is widely used in South Korea, was selected to compare with the benefit-cost value of the ultrasound-based cleaning device in this study. In order to quantitatively and qualitatively analyze benefit and cost aspects of the two products, categories and evaluation factors of each aspect as well as evaluation criteria were identified. Based on the identified evaluation factors and criteria, this study conducted face-to-face interviews with 15 experts to measure weights of benefit and cost aspects of the products. As the results, the total benefit weight of the ultrasound-based cleaning device was larger than its total cost weight since the benefit-cost value was greater than 1, which was 1.6 times of that of to compared product. Therefore, from the economic perspective, it is worth to develop the cleaning device for photovoltaic power generation systems applying ultrasound technology.

Cost-Benefit Analysis Method for Ageing Equipment of Chemical Plants Using Risk Assessment (위험성평가를 이용한 노후설비에 대한 비용 편익분석 방법)

  • Jung, Soomin;Jung, Changmo;Kang, Seok-Min;Chae, Seungbeen;Kang, Seung-Gyun;Ko, Jae Wook
    • Journal of the Korean Institute of Gas
    • /
    • v.24 no.4
    • /
    • pp.84-92
    • /
    • 2020
  • Most facilities in chemical plants operate in environments that are outside the range of temperature and pressure that can be encountered on a daily basis, and are vulnerable to aging due to these stresses and environmental conditions. The facilities exposed to these conditions are not only likely to fail due to cumulative damage, but also lead to accidents if maintenance and replacement are not performed.Recommendation guidelines called risk-based inspection are widely used around the world-wide. However, limits exist for facilities that have already elapsed for a certain. As a result of the survey on the aging of Ulsan industrial complex in Korea, which carries out proper inspection, many of the facilities have been used for 20 years. Also, most of the facilities where the accident occurred have been in operation for more than 20 years. Therefore, this study suggested criteria for classifying devices that have exceeded a certain period of use as obsolete facilities. In addition, quantitative risk assessment was conducted. The safety investment method using the cost-benefit analysis method was proposed in order to calculate the loss cost and reduce the risk by expressing the risks of the corresponding aged facility as an Economic index. By utilizing the method of cost-benefit analysis of old facilities using the quantitative risk assessment presented in this study, it can be expected to improve the performance and life of old facilities, improve production efficiency and reliability of the system of facilities, change the recognition of safety management costs, increase employee stability, and reduce loss costs.

법령과 고시-건설산업기본법 시행령 일부 개정

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.2 s.211
    • /
    • pp.38-42
    • /
    • 2008
  • 건설산업기본법시행령.시행규칙이 지난 해 12월 28일 개정되어 1월 1일부터 시행에 들어갔다. 이번에 개정된 시행령은 기계설비공사업 업역 확대 및 국민연금, 건강보험료 비용정산 등을 주요 내용으로 개정되었다. 대한설비건설협회는 시행령.시행규칙 개정 과정에서 업역확대를 주목표로 설정하고 신규 사업분야인 시스템에어컨 설치공사, 지열냉난방설치공사, 자동제어 분야에서 전기.통신과 업역다툼이 있었던 자동원격검침 설비공사, 지능형 제어시스템 설치공사 등을 기계설비공사업역에 추가시켰다. 이로써 지난 해 건산법 개정 시 기계설비만 겸업제한 폐지를 4년 유예시킨 성과에 버금가는 성과를 거두었다. 또한 대한설비건설협회는 국민연금, 건강보험료의 비용 정산을 민간공사에도 도입될 수 있도록 끊임없이 건의하여 이번에 개정됨으로써 회원사의 보험료 납부 부담을 줄일 수 있게 되었다. 건산법 시행령·시행규칙의 주요 개정 내용 및 설비건설업과 관련한 신.구조문 대비표는 다음과 같다.

  • PDF

The Investment Scheme of the Maintenance Planning with Limited Investment Budget in the Distribution Systems for Minimizing the Interruption Cost (제한된 투자 예산으로 정전비용 최소화를 위한 배전계통 유지보수 계획의 투자 방안)

  • Hwang, Won-Il;Kim, Kyu-Ho;Kim, Hong-Rae;Song, Kyung-Bin
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.24 no.8
    • /
    • pp.1-7
    • /
    • 2010
  • The reliability of a power system has close relationship with the maintenance of the distribution systems. This paper presents the method of the maintenance planning of the distribution systems by minimizing the interruption cost. The interruption cost for the equipment failures is formulated using time varying failure rate and minimized by optimization of the object function. The proposed method provides the priority list for the investment of the maintenance subject to the limited investment budget by the economic analysis. In order to test the proposed method, the modified distribution system of a rural area is introduced for the testing system. Test results show that the proposed method is good enough by evaluating the improvement of the reliability of the power system.

Cost Evaluation Model for FACTS Investment and Operation (유연송전시스템의 투자비용과 운전비용 평가모형)

  • Choi, Joon-Young
    • Proceedings of the KIEE Conference
    • /
    • 1997.07c
    • /
    • pp.1071-1073
    • /
    • 1997
  • 최근 유연송전시스템에 대한 연구가 각광받고 있는데, 이 새로운 시스템이 연구의 대상에서 활용의 대상으로 변화하기 위해서는 그 경제적 이점을 검증받아야 한다. 유연송전시스템의 경제성은 이를 설치하는 데 들어가는 투자비용과 사용하는 데 들어가는 운전비용의 크기를 기존의 송전방식의 비용과 단위용량당 비교를 함으로써 알아 볼 수 있다. 이 새로운 송전방식은 송전설비의 송전용량을 증대시킬 것으로 예상되기는 하지만 단위 용량당 비용면에서 경제성이 확보될 것인지, 또 커다란 초기투자비용이 투자되기때문에 과연 경제성이 확보될 것인지는 불투명하므로 이 논문에서 초기용량의 크기, 적정용량 도달기간, 초기투자비용과 설비의 운전비용의 계산하는 모형을 개발하여 유연송전시스템의 경제성을 평가해보았다.

  • PDF