Browse > Article
http://dx.doi.org/10.5207/JIEIE.2010.24.8.001

The Investment Scheme of the Maintenance Planning with Limited Investment Budget in the Distribution Systems for Minimizing the Interruption Cost  

Hwang, Won-Il (숭실대학교 전기공학과)
Kim, Kyu-Ho (국립한경대학교 전기공학과)
Kim, Hong-Rae (순천향대학교 공과대학 전자정보공학과)
Song, Kyung-Bin (숭실대학교 전기공학부)
Publication Information
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers / v.24, no.8, 2010 , pp. 1-7 More about this Journal
Abstract
The reliability of a power system has close relationship with the maintenance of the distribution systems. This paper presents the method of the maintenance planning of the distribution systems by minimizing the interruption cost. The interruption cost for the equipment failures is formulated using time varying failure rate and minimized by optimization of the object function. The proposed method provides the priority list for the investment of the maintenance subject to the limited investment budget by the economic analysis. In order to test the proposed method, the modified distribution system of a rural area is introduced for the testing system. Test results show that the proposed method is good enough by evaluating the improvement of the reliability of the power system.
Keywords
Interruption Cost; Modeling of Interruption Cost; Reliability; Reliability Centered Maintenance;
Citations & Related Records
Times Cited By KSCI : 2  (Citation Analysis)
연도 인용수 순위
1 이희태, “RCM을 이용한 배전계통 설비의 유지보수 순위 결정”, 숭실대학교 석사학위논문, 2004.
2 김재철, 윤상윤, “배전계통의 전력품질 및 신뢰도 평가의 방법”, 대한전기학회지, 제50권 제3호, pp. 24-31, 2001.
3 Wenyuan Li, Risk Assessment of Power Systems, IEEE Press, 2005.
4 한국전력공사, “신뢰성 및 경제성을 고려한 배전계통 최적 투자계획 수립 모델 및 시스템 개발 2차년 진도보고서”, 2007.
5 박창호, 채우규, 장성일, 김광호, 김재철, 박종근, 최정환, “배전계통 신뢰도를 고려한 전기설비투자 우선순위 결정기법”, 대한전기학회 논문지, 전력기술부문A, 제54권 제4호, pp. 177-184, 2005.
6 Kiochi Nakamura and Susumu Yamashiro, “A Survey Study on Estimation of Customer Interruption Costs”, T. IEE Japan, Vol. 199-B, No. 2. 1999.
7 Arun P. Sanghvi, “Measurement and Application of Customer Interruption Cost/Value of Service for Cost Benefit Reliability Evaluation : Some Commonly Raised Issues”, IEEE Transactions on Power Systems, Vol. 5, No. 4, Nov. 1990.
8 S. Ymashiro, K. Nakamura, O. Terada, and Y. Tomaki, “Residential Cost of Power Service Interruption-Recent Survey Application to Transmission Planning”, Proceedings of the International Conference on Electrical Engineering, Vol. 1, Aug. 1996.
9 최상봉, 김대경, 정성환, “배전기자재별 고장확률을 고려한 배전계통 수용가 정전비용 산출기법”, 대한전기학회논문지, 전력기술부문A, 제51권 제5호, pp. 232-237, 2002.
10 한국전기연구원, “경쟁체제하에서의 배전계통 공급신뢰도 및 경제성 평가기법 최종보고서”, 2004.
11 한국전기연구원, “계통계획을 위한 산업용 수용가 공급지장비 조사연구 진도보고서”, 2006.