Korean Journal of Construction Engineering and Management
/
v.12
no.2
/
pp.143-151
/
2011
The process of design management by public client has not performed effectively due to lack of the formal guidelines and procedures in domestic public projects. The purpose of this research is to develop the guidelines and procedures of design management for public clients. The research methodology is to analyze current status of design management process in domestic and overseas cases and to develop the guidelines based on the administrative stages of design process along the project. The guidelines of design management developed by the design stages of pre-contract, contract, and post-contract stages to classify administrative procedures. The outcome of this research is able to be utilized by the public clients and design firms to standardize the process of design management and minimize potential risk during the process of the project.
건설 프로젝트를 수행함에 있어서 사업관리운영 절차서는 매우 중요하다. 국내에서는 일부 대형 공공 사업을 제외하고 프로젝트의 특성에 맞는 절차서를 개발하여 적용한 예는 드물다. 이러한 점을고려하여 현재 공사가 진행죽인 대표적인 국내민간자본 SOC사업을 표본으로 삼아 절차서의 활용현황을 검토분석하고 그에 따른 효율화 방안을 구하여 보았다. 이를 위해서 사업수행주체인 발주자, 사업관리자, 감리자, 설계자, 시공계약자 등을 대상으로 현재 보유/사용하고 있는 절차서에 대한 이해도, 사업관리지식체별 업무절차에 대한 이해도를 설문조사하였다. 설문조사의 분석결과를 토대로 건설사업관리수행상 업무수행절차의 전반적인 이행실태를 점검하여 문제점을 도출함으로서 향후 사업관리운영절차서의 체계적인 개발을 위한 추진방향을 설정하고 사업관리전반에 대한 인식제고와 효율적인 사업관리체계의 적용방안을 모색하여 제시하였다.
Proceedings of the Korean Institute of Industrial Safety Conference
/
2003.10a
/
pp.237-242
/
2003
원자력발전소(이하, 원전)에서는 운전, 보수, 점검, 검사, 변경 등 모든 활동을 절차서 형태로 정의하고 있으므로, 절차서는 원전운영의 안전성을 유지하기 위한 핵심적인 수단이다. 따라서, 원전에서 절차서는 신기술 및 설계, 설비 변경 결과를 반영하여 주기적으로 검토 보완되고 있다. 절차서의 내용은 안전성 측면에서 철저한 확인을 거쳐 작성된다. 그러나, 절차 및 절차서의 인적요소는 그러한 기술적인 측면을 무력화시킬 수 있으므로 별도로 관리되어야 한다. 절차서의 평가에서는 절차 내용의 기술적인 타당성과 함께 인적요소를 평가하여 안전성에 부정적인 영향이 없는지를 확인하고 있다.(중략)
Proceedings of the Korea Water Resources Association Conference
/
2023.05a
/
pp.458-458
/
2023
본 연구에서는 위성영상 활용 지능형 재난관측·감시 기술 개발을 목적으로 위성영상과 멀티소스(CCTV, 항공영상, 공공DB 등)와의 연계·융합을 통해 재난상황관리의 정확도 향상과 위성영상 활용성 제고 방안을 제시하고자 하였다. 위성영상 수집·배포시스템으로부터 전달되는 위성영상과 멀티소스의 연계 융합을 통한 재난상황정보의 표출을 목적으로 상황판연계 표출시스템 가동 절차와 위성영상 수집을 통한 위험탐지 알고리즘과의 연계를 위해 재난상황업무 기반 시스템 가동절차를 수립하고, 위기관리표준 매뉴얼 상 상황업무절차를 적용해 예비설계를 진행하였다. 상황실 실무자 설문을 통해 작성된 시스템 요구사항과 규격서를 기반으로 상황업무절차를 적용해 먼저업무시스템 설계를 진행하였다. 평시에는 GIS통합상황판에서 관리됨을 전제로 위성영상 수집에 대한국가적 예산 투입 측면을 고려해 중대본 설치가 필요한 대형재난 발생상황을 가정하여 상황판연계·표출시스템의 가동되도록 설계하였다. 또한, 위성영상 분석을 통한 피해위험도와 재난이력통계 등 멀티소스와 중첩한 결과를 실시간으로 표출함에 따라 상황실근무자는 재난확산 여부를 판단하고, NDMS를 통해 재난상황을 전파할 수 있도록 설계하였다. 상황판연계 표출시스템의 원활한 데이터 입/출력을 위해 재난유형 및 분석단계별 클래스 정의, 유스케이스 ID(요구기능)와 1:1 또는 1:n매칭을 수행하여 재난유형 및 분석단계별 클래스를 정의하였다. 정의된 클래스는 유스케이스인 요구기능과 매칭을 수행하였고, 시스템 가동절차 중 피해위험도분석, 재난이력통계, 중첩결과표출, NDMS 상황전파에 대한 상황업무절차를 기반으로 산불·홍수·산사태·대설·태풍 총 5종의재난별 시퀀스를 설계하였다. 마지막으로 화면정의서와 UI/UX설계서를 기반으로 Figma를 통해 시스템구동화면을 사전에 모의하였다. 향후, 진행되는 연구에서는 위성영상과 멀티소스를 연계한 화면을 실체화하여 더욱 정확한 재난상황관리가 가능하도록 NDMS 연계 상황판 표출 시스템을 개발하고자 한다.
Proceedings of the Korean Institute of Industrial Safety Conference
/
2000.06a
/
pp.276-282
/
2000
지금까지 가장 널리 사용되는 원전 안전성의 평가는 설비고장이나 인간오류와 관련된 조직(Institution/organization)의 질이 설비의 신뢰도와 인적오류에 영향을 주며 원전의 안전성에 전반적인 영향을 끼친다는 것을 고려하지 않고 있다. TMI 사고는 경미한 설비고장은 있었으나 중요한 사고원인은 운전원의 오류였다. 운전원 훈련양의 부족, 절차서의 불명확성, 주제어실의 설계상의 결함 등이 함께 어울어진 안전문화와 관련한 조직실패(Organizational Failure)였다. Chernobyl사고도 전반적인 관리조절(Management Control)의 부족과 운전원의 부적절한 실험 절차서의 검토, 안전 절차서의 위배 등이 함께 연루되어 발생하였다. (중략)
Korean Journal of Construction Engineering and Management
/
v.9
no.5
/
pp.149-158
/
2008
Plant construction is being a motive power of national economic growth, because it is a higher value-added business which has enormous influence through other industry. But, plant projects management of the domestic company was poor. So, the development of EPC Business Process Management method has been encouraged. Therefore, this paper performed several researches for setting up the EPC Business Process Management Model for improving plant project management. And the details are as follows. First of all, this study collected the work procedure manuals of 12 large-sized international construction companies. Secondly, from the analyzing gathered EPC work procedure manuals, issues of work procedure manuals were analyzed and improvement plans were drawn out. Basis on this, This study presents a method to improve project management for EPC plant project. 'The Work Procedure Matrix for EPC Management' and 'Key Unit Works for EPC Management' were drawn out by using overseas construction management theories and international regulations. In addition, 'The EPC Business Process Management Models' reformed to the Business process method, that is the set of specifications, documents and procedures used to manage the EPC plant project. And it describes how the EPC work procedure manuals will be used. Finally, this study suggests the model of EPC Business Process Management System. The framework of Plant project management can be clarified by using 'The Work Procedure Matrix'. And 'Key Unit Works' are used to organize the work procedure needed to improve plant projects management. The results of this study will help to improve in project management efficiency for plant construction.
Korean Journal of Construction Engineering and Management
/
v.1
no.2
s.2
/
pp.53-62
/
2000
A concrete element is obtained through multi-steps, and its quality is affected by site conditions and control constituents of procedures. In these regards, in order to assure designed qualities of concrete and associated materials of the element good quality control method is necessary in various procedures. The existing quality control measures do not satisfy the requirements for the quality control activities at each production step. This study provides a more effective checklist for each phase of concrete work, which improves existing quality control checklist through extensive research on current practices and surveys from expertises. This paper also proposes the application of multi-facet codes to develop a customized checklist to improve the efficiency in field practices and the effectiveness in assuring the designed performance of concrete. This study finally provides a more effective checklist for each phase of concrete work by improving usability of the developed project sensitive matric quality control checklist through application experiments on construction project sites.
Journal of the Korea Academia-Industrial cooperation Society
/
v.19
no.11
/
pp.96-104
/
2018
Military vessels are complex weapon systems consisting of various integrated onboard equipment. Since their acquisition of military equipment takes a long period of time and a prototype ship is deployed and tested, vessel development has relied on its proprietary process. However, due to the growing complexity of onboard equipment technology, application of systems engineering (SE) process has become indispensable. Nonetheless, an effective design process complementing the existing design with the SE has not yet been developed. As such, we have studied an improved basic design process for submarines based on SE. To do so, we analyzed the processes for the basic design, technical review, and requirement management. Included reviews and requirements are SRR, SFR and PDR, and SSRS, SSS, and SSDD. By combining the results in the SE framework, we built an improved basic design process that can be applied in parallel with the SE-based technical review and requirement management. To assess the process, we applied our proposed model to the submarine development undergoing the basic design phase. It is possible to effectively manage the requirements, design artifacts and improve traceability, and also utilize them as test and evaluation materials. The SE-based basic design process is expected to be useful in other kinds of vessel design.
ITA법 제정 이후 많은 공공기관들이 ITA/EA 도입 및 구축을 추진하고 있으나, 명시적인 성과를 보여주는 경우는 많지 않은 것으로 조사되고 있다. 특히, 공공기관 EA 성숙도 수준 평가 결과 EA 도입에 비하여 관리 및 활용 영역의 수준이 낮게 나타나고 있다. 본고는 EA의 활용성을 저해하는 제 원인 중 EA 관리체계의 부실에 주목하였다. EA 도입과 함께 EA관리 체계가 수립됨에도 불구하고 EA 관리 및 활용 수준이 낮은 이유는 첫 번째로, EA관리 조직 설계 시에 EA 산출물의 작성 주체 및 협업 방안이 구체화되지 않은 상태로 관리 조직 및 역할이 수립되는 경향을 지적할 수 있다. 두번째로 EA 관리체계 설계 시에 각 EA 산출물의 특성이 고려되지 않은 획일적 관리 프로세스의 설계로 인하여 관리체계가 오작동하는 문제를 지적할 수 있다. 본 연구에서는 이러한 문제의식을 근간으로 개별 산출물에 대하여 요구되는 정확성과 정합성 수준에 따라 범정부 EA 산출물들을 구성도/정의서(Diagram/Description)형, 모델(Model)형, 정보자동생성(Auto Description)형, 설계서(Description)형, 서지정보(Metadata)형으로 유형화하고, 각각의 산출물 유형에 따른 조직의 역할과 협업 방안, 관리 프로세스를 제시하였다. 본 연구를 통해 향후 EA 관리체계 수립 및 조정 시에 산출물 유형별로 작성 주체 및 관리 조직간 요구되는 역할과 관리절차를 명확히 함으로써 효율적인 EA 산출물 관리가 이루어지도록 하고, 이를 통해 궁극적으로 EA 활용도 증진 및 EA의 근원적 목적 달성이 가능할 것으로 기대한다.
Proceedings of the Korean Society Of Semiconductor Equipment Technology
/
2003.12a
/
pp.68-77
/
2003
TFT-LCD 모니터 및 TV의 핵심부품인 TFT/Color Filter를 제조하는 공장라인에서 제품의 품질에 중요한 역할을 하는 것은 유리기판에 TFT와 Color Filter을 형성시키는 노광공정(Exposure)이다. 이러한 TFT/Color Filter를 생산하는 공정내에서 노광기는 핵심기술이므로 진동에 대하여 엄격하게 관리되어지고 있다. 그리고, TV 및 TFT-LCD 모니터의 크기가 큰 것을 사용자의 요구로 TFT/Color Filter 생산 공장은 세대가 거듭될수록 사용되어지는 유리기판의 크기도 따라서 커지고 있다. 이러한 유리기판의 크기 증가는 공정라인에서 진동에 더욱더 취약해지는 결과를 초래하므로 보다 엄격하게 진동관리가 필요하게 된다. 이에, 본 논문에서는 기존 세대인 1~5세대 TFT-LCD 공장 현장에서 노광기의 진동실태를 수집하여 파악하고 Maker에서 제시하는 자료와 비교/평가하고, 문제점을 확인한다. 이를 기초로 수정/보완되어야 할 사항을 검토하며, 차세대인 6∼7세대 노광기에 대한 진동저감 대책을 위한 시스템을 설계하는 절차서에 대한 예를 들었으며, 최적의 진동저감 대책에 대한 설계안의 방향을 제시하였다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.