• Title/Summary/Keyword: 석회석광산

Search Result 176, Processing Time 0.032 seconds

A Cost-benefit Analysis of Developing Project for Lime Mineral on the Basis of Case Study (석회석광산 개발사업의 비용-편익분석 -사례 중심으로-)

  • Kwack, Tae-Won;Kim, Hong-Kyun
    • Environmental and Resource Economics Review
    • /
    • v.15 no.4
    • /
    • pp.713-740
    • /
    • 2006
  • In this paper, we examine what factors should be considered in cost-benefit analysis of a resource-developing project as cos and benefit item. According to this study, the reduction in forest product value and the reduction in function to clean air pollution should be included as a environmental cost. However, the reduction in recreation function and function in cleaning water need not to be included. We also calculated a cost-benefit of developing project for lime mineral of A company by applying these factor just mentioned. This paper concluded that the net benefit of this project is positive and the range of the value is from 689,900million won to 1,784,000million won.

  • PDF

Comparison of Blast Fragmentation Efficiencies from Conventional Bench and Double Air Deck Charge Blast Methods in Limestone Mine (석회석 광산에서 기존 일반발파와 이중분상 Air Deck 발파공법의 비교연구)

  • Kang, Dae-Woo;Hur, Won-Ho;Yang, Kook-Jung;Park, Dong-Chul
    • Explosives and Blasting
    • /
    • v.29 no.2
    • /
    • pp.13-31
    • /
    • 2011
  • Air deck charge blast methods have been applied to improve the fragmentation in open cut bench blastings for mining developments. However, during large scale bench blasting operations, there exist some problems such as boulder productions due to explosive charge concentration. Especially, in case of lime stone mining, when air deck method is applied, there has been unintentionally concentrated on charging because the inside holes are often broken by erosion and decomposition. In this study, compared with general blasting, air deck blasting has been focused in lime stone mining. In other to maximize its efficiency, inside hole was examined by endoscope in advance and deck charge using air tube was applied to the section in which concentration might be taken place. Blasting efficiency, fragmentation, charging reduction rate, and total working hours (from charging to blasting) were the main object for comparing, and as a result, air deck was more efficient then the general blasting in all aspects except total working hours.

Feasibility Study of the Stabilization for the Arsenic Contaminated Farmland Soil by Using Amendments at Samkwang Abandoned Mine (삼광광산 주변 비소 오염 토양에 대한 안정화 공법 적용성 평가)

  • Lee, Jung-Rak;Kim, Jae-Jung;Cho, Jin-Dong;Hwang, Jin-Yeon;Lee, Min-Hee
    • Economic and Environmental Geology
    • /
    • v.44 no.3
    • /
    • pp.217-228
    • /
    • 2011
  • The feasibility study for the stabilization process using 5 amendments was performed to quantify As-immobilization efficiency in farmland soils around Samkwang abandoned mine, Korea. For the batch experiments, with 2% and 3% of granular lime(2-5 mm in diameter), leaching concentration of As from the soil decreased by 86% and 95% respectively, compared to that without the amendment. When 5% and 10% of granular limestone was added in the soil, As concentration decreased by 82% and 95%, showing that lime and limestone has a great capability to immobilize As in the soil. From the results of batch experiments, continuous column(15 cm in dimeter and 100 cm in length) tests using granular lime and limestone as amendments was performed. Without the amendment, As concentration from the effluent of the column ranged from 167 ${\mu}g$/L to 845 ${\mu}g$/L, which were higher than Korea Drinking Water Limit(50 ${\mu}g$/L). However, only with 1% and 2% of lime, As concentration from the column dramatically decreased by 97% for 9 years rainfall and maintained below 50 ${\mu}g$/L. With 5% of limestone and the mixed amendment(1% of lime + 2% of limestone), more than 95% diminution of As leaching from the column occurred within I year rainfall and maintained below 20 ${\mu}g$/L, suggesting that the capability of limestone to immobilize As in the farmland soil was outstanding and similar to that of lime. Results of experiments suggested that As stabilization process using limestone could be more available to immobilize As from the soil than using lime because of low pH increase and thus less harmful side effect.

A Study on the Cause Analysis of the Ground Subsidence in Limestone Mine (석회석 광산에서 발생한 지반침하에 대한 원인 분석 연구)

  • Lee, Sangeun;Jeong, Gyo-Cheol
    • The Journal of Engineering Geology
    • /
    • v.30 no.4
    • /
    • pp.497-514
    • /
    • 2020
  • This study investigated the causes of large-scale ground subsidence in the upper part of mining cavities of the Samdo limestone mine, Samcheok city, Gangwondo, Korea. Geological and electrical resistivity surveys were undertaken on the collapsed slope of the mountain and in the mine tunnel where subsidence occurred, with geotechnical evaluations and numerical analysis. It is concluded that wide mining cavities, with irregular pillars in unstable rock masses hosting discontinuities, weathered over time, resulting in subsidence occurring along a fault plane due to increasing ground stress.

Business impact analysis for disaster management of large underground limestone mine (석회석광산 지하대형공간의 재난관리를 위한 업무영향력 분석)

  • Lee, Seong-Min;Kim, Sun-Myung;Lee, Yeon-Hee
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.15 no.6
    • /
    • pp.613-623
    • /
    • 2013
  • As Limestone mines have been operated with various environmental, societal and managemental problems depending on their characteristics and developing methods, many great efforts have been applied to solve these problems. Installing the mining facilities underground is one of the successful efforts to keep the sustainable limestone mine development. This effort could reduce these problems. However, unfortunately it made an side effect of constructing a large underground space in mining site. Moreover, this space caused a necessity of various disaster managements for the safety of workers and facilities. This study introduces the priority list of a limestone mining process if there are disasters in underground mining site. This result is coming from the risk assessment and business impact analysis on survey data which were obtained from the miners of that particular limestone mine. According to the result, the highest risk is 'disregard of safety guidelines in crushing & classifier process'. The result also shows the highest priority business, above all things, is 'a pit linked work of in & out process'.

3-dimensional Modeling and Mining Analysis for Open-pit Limestone Mine Stope Using a Rotary-wing Unmanned Aerial Vehicle (회전익 무인항공기를 이용한 노천석회석광산 채굴장 3차원 모델링 및 채굴량 분석)

  • Kang, Seong-Seung;Lee, Geon-Ju;Noh, Jeongdu;Jang, Hyeongdoo;Kim, Sun-Myung;Ko, Chin-Surk
    • The Journal of Engineering Geology
    • /
    • v.28 no.4
    • /
    • pp.701-714
    • /
    • 2018
  • The purpose of this study is to show the possibility of 3-dimensional modeling of open-pit limestone mine by using a rotary-wing unmanned aerial vehicle, a drone, and to estimate the amount of mining before and after mining of limestone by explosive blasting. Analysis of the image duplication of the mine has shown that it is possible to achieve high image quality. Analysis of each axis error at the shooting position after analyzing the distortions through camera calibration was shown the allowable range. As a result of estimating the amount of mining before and after explosive blasting, it was possible to estimate the amount of mining of a wide range quickly and accurately in a relatively short time. In conclusion, it is considered that the drone of a rotary-wing unmanned aerial vehicle can be usefully used for the monitoring of open-pit limestone mines and the estimation of the amount of mining. Furthermore, it is expected that this method will be utilized for periodic monitoring of construction sites and road slopes as well as open-pit mines in the future.