• Title/Summary/Keyword: 석탄 화력발전소

Search Result 317, Processing Time 0.054 seconds

Evaluation of Some Rare Metals and Rare Earth Metals Contained in Coal Ash of Coal-fired Power Plants in Korea (국내 석탄화력발전소 석탄회 중 희유금속 가치 평가)

  • Park, Seok-Un;Kim, Jae-Kwan;Seo, Yeon-Seok;Hong, Jun-Seok;Lee, Hyoung-Beom;Lee, Hyun-Dong
    • Resources Recycling
    • /
    • v.24 no.4
    • /
    • pp.67-75
    • /
    • 2015
  • The content distributions of some rare metals and rare earthe metals in coal ash (fly ash, bottom ash and pond ash) and leachate from coal-fired power plants were investigated. In case of Yttrium (Y) and Neodymium (Nd) which were strategic critical elements, their contents were ranged from about 23 ~ 75 mg/kg and it is shown they are worth to be developed for the recovery and separation method. Considering the annual amount of fly ash and bottom ash and pond ash, coal-fired power plants have great value of about 1,670 billion KRW and it is regards they are worthy as urban mines.

The creep rupture properties on welded joints of Cr-W pipe steels for boiler in advanced thermal power plant (석탄화력발전소 보일러 배관용 Cr-W계 강 용접부의 크리프 파단특성)

  • 이연수;유석현;공병욱;이경운;김정태
    • Proceedings of the KWS Conference
    • /
    • 2004.05a
    • /
    • pp.149-151
    • /
    • 2004
  • 고효율, 대용량의 친환경적이며 경제적인 발전소건설을 위해 초초임계압(USC: Ultra Super Critical) 석탄화력발전소의 건설이 세계적인 추세이다. 이러한 USC발전소는 효율향상을 위해 증기온도와 압력의 상승, 경제적 운용을 위해 부하변동운전 적용확대가 필수적이다. (중략)

  • PDF

A Study on BTU Correction Control according to variation of Coal Calorfic Value in Coal Fired Thermal Power Plants (석탄연소 발전소의 석탄 발열량 변동에 따른 열량 보정제어에 관한 고찰)

  • Kim, Byoung-Chul;Kim, Ho-Yol;Byun, Seung-Hyun
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.1832-1833
    • /
    • 2011
  • 석탄연소 화력발전소 보일러의 최적 제어는 부하요구에 대하여 보일러 출력을 신속히 제어하고, 보일러 출력에 대하여 보일러 입력에너지인 석탄 유량을 조절하여 에너지 균형을 맞추는 것이다. 이는 안정된 부하뿐 아니라 부하변동시에도 균형을 유지하면서 제어해야 한다. 석탄 연소 보일러 에너지 입력이 되는 석탄유량 측정 및 보정은 유류나 가스연료보다 까다롭고, 석탄 연료의 발열량이 시간에 대하여 변하는 문제가 있으므로, 신속하고 안정된 제어 성능을 위해 계측된 석탄 유량을 설계기준치로 환산, 보정하여 제어해야 한다. 이에 대한 기술은 일찍이 보일러 출력인 증기 보유열량을 측정하여 실제 계측한 석탄 유량을 연속적으로 보정하는 기법을 사용하고 있다. 이에 대한 석탄 열량 보정 제어로직을 검토하여 최적 튜닝방안에 대하여 고찰하고자 한다.

  • PDF

Analysis on the Load Runback Logic for a 500MW Coal Fired Power Plant (500MW급 석탄화력발전소 Load Runback 로직 분석)

  • Kim, Jong-An;Ryu, Kwang-Myung
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.1842-1843
    • /
    • 2011
  • 화력발전소는 화석연료 에너지를 전기에너지로 변환하는 과정에 참여하는 많은 종류의 기기들이 유기적으로 운전되는 복합시스템이다. 발전소 정상운전 중 어느 한 기기가 갑자기 정지되면, 불안정현상이 크게 발생하고 정상 운전이 어렵게 된다. 그러므로 이러한 상황이 발생하는 경우 빠른 시간 내에 적정한 수준으로 출력을 감소시키고, 새로운 안정운전 상태를 찾아가도록 하는 선행적 제어기능이 필요하게 된다. 화력발전소에 이 목적으로 구현되는 제어기능을 로드런백(Load Runback)이라고 부른다. 특히 화력발전소 보일러는 급수, 연료, 통풍을 담당하는 많은 기기가 많이 동시 운전되고 있으므로, 적합하게 설계된 로드런백 기능이 없다면 신뢰성 운전을 보장하기 어렵다. 이 논문에서는 국내 500MW급 표준화력에서 사용하고 있는 로드런백 기능의 핵심을 분석하였고, 이 분석을 토대로 현재 개발 단계에 국산화 제어시스템에 로드런백 기능을 구현하고자 한다. 실제 발전소 취득한 로드런백 시험 그래프를 제시하고 분석 결과의 타당성을 확인하였다.

  • PDF

Estimation of the Project Cost for a Coal-fired Power Plant using Stochastic Simulation (확률적 모의실험법을 이용한 석탄화력발전소의 건설사업비 추정)

  • Han, Hyoung-Gi;Moon, Seung-Jae
    • Plant Journal
    • /
    • v.8 no.4
    • /
    • pp.45-54
    • /
    • 2012
  • Estimated project cost and executed sensitivity analysis for domestic 500 MW coal-fired power plants with monte carlo simulation. As a result of research, the basis of constant price in December, 2011 and 95% level of confidence, the project cost in case of not having adjacent power plant was 1,870 billion won to 2,330 billion won and the project cost in case of having adjacent power plant was 1,240 billion won to 1,590 billion won. In case of not having adjacent power plant is sensitive to civil construction cost but the other case is sensitive to material cost.

  • PDF

The state-of-art of RDF technology and the development of RDF co-combustion technology at the coal power plant (폐기물고형연료(RDF) 기술 동향 및 석탄/RDF 혼소기술 개발)

  • Choi, Yeon-Seok
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2005.11a
    • /
    • pp.414-422
    • /
    • 2005
  • 유럽에서 RDF기술 확산 동향과 국가별 RDF사용 현황, 각국의 RDF품질표준 및 최근 유럽공통RDF품질표준화 추진현황을 소개하고 RDF사용처별 경제성분석 내용을 소개하였다. 소각로, 시멘트공장 및 석탄화력발전소에서 RDF를 사용할 경우에 열회수량은 시멘트공장이 다소 높게 나타났고 손익평가(cost benefit balance)는 석탄화력발전소가 가장 높게 나타났다. 국내에서 가동 중인 20MW급 순환유동층 석탄화력발전보일러에서 폐플라스틱고형연료(RPF)를 혼합연소하는 기술과 염화수소 및 다이옥신 측정내용을 소개하였다. 전염소량 0.4$\sim$0.6% RPF를 2.5%혼소 시 염화수소는 10ppmv 정도로 분석되었고 다이옥신은 0.003ng-TEQ/$Sm^3$으로 거의 검출이 되지 않았다.

  • PDF

Gasification Characteristics of Usibelli Coal in a Entrained Bed Coal Gasifier (분류층 건식 석탄가스화기에서 유시벨리탄의 가스화 특성)

  • 유영돈;유희종;윤용승;정광국;안달홍
    • Proceedings of the Korea Society for Energy Engineering kosee Conference
    • /
    • 1998.05a
    • /
    • pp.3-8
    • /
    • 1998
  • 석탄을 이용한 차세대 발전 시스템으로 석탄가스화 복합발전(IGCC, Integrated Gasification Combined Cycle)이 하나의 대안으로 제시되고 있다. 기존 석탄화력 발전소의 발전 효율인 36-38%보다 적어도 2-6% 우수한 효율을 나타내고 있으며 21세기 석탄 이용시 적용될 환경 규제치를 가장 현실적으로 만족시킬 수 있는 차세대 석탄화력발전 시스템으로 평가받고 있다. (중략)

  • PDF

The Study for Actual Application of Modeling Method for Master Controller of Coal-Fired Power Plant (석탄화력발전소 마스터 제어기에 대한 모델링 기법 실증적용에 관한 연구)

  • Lim, Geon-Pyo;Jeong, Tae-Won;Kim, Yun-Seok
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.1670_1671
    • /
    • 2009
  • 산업경제구조의 변화로 경험이 풍부한 전문가들이 은퇴하고 경험이 적은 직원들이 그들의 업무를 대신하는 구조로 조직이 변화하고 있다. 동시에 녹색성장시대의 도래로 화석연료를 사용하는 설비에 대한 투자가 줄면서 점차로 노후화되는 경향을 보이고 있어 불필요한 운전 과도현상에서 기인된 극단적인 손상은 설비자체 및 전력공급계통 전체에 치명적이라고 할 수 있다. 따라서 석탄화력발전소 제어 시스템은 이러한 사안들을 안정적으로 이끌어 나가기 위한 중요한 요소로 저비용 고효율 발전소 유지를 위해 중점적으로 발전시켜 나가야 할 부분이다. 본 논문은 석탄화력발전소의 주구성요소인 보일러와 터빈을 제어하는 마스터 제어기의 복잡한 로직을 모델 기반의 간단한 로직으로 개발하여 시뮬레이션 한 결과를 실제 발전소에 적용하기 위한 내용을 기술하였다. 실제 발전소는 많은 위험요소들을 안고 있기 때문에 시뮬레이션에서 나타나는 급격한 제어동작을 수용할 수 없을 경우도 있으며, 실제 다른 많은 변수들이 제어불안정 요소로 작용할 수 있다. 차후 실제 적용한 결과는 예측제어의 사용과 같은 제어시스템 향상을 위한 개발과 운영효율 향상에 사용될 것이다. 튜닝 과정에서의 연구결과는 시간절약과 제어부분 결함제거 등 직원들의 전문지식 향상 등에 도움을 주게 될 것이다.

  • PDF

Development of Power Plant Simulator for Control System Verification & Validation (제어 검증용 발전소 시뮬레이터 개발)

  • Byun, Seung-Hyun;Hwang, Do-Hyun
    • Journal of the Korea Society for Simulation
    • /
    • v.19 no.1
    • /
    • pp.41-51
    • /
    • 2010
  • A control system has been being developed by korean engineers for 500MW korean standard type fossil power plant with the advent of retrofit of old control system. Simulators have been used for digital I&C system pre-tests and validation tests in nuclear power plants. In this paper, the power plant simulator for control system V&V was developed in order to verify the developed control system prior to application to a power plant. The control models were developed using plant control system data, translator programs, and vendor manuals. The developed simulator was verified by steady-state test, load swing test, transient test and so on.