• Title/Summary/Keyword: 생애주기 비용

Search Result 301, Processing Time 0.026 seconds

A Study on the Economical Analysis Model for Asphalt Pavementin Congestion Area of Metropolitan (대도시 혼잡구간의 아스팔트 포장에 대한 경제성 분석 모델 연구)

  • Jo, Byung Wan;Tae, Ghi Ho;Kim, Do Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.5D
    • /
    • pp.771-781
    • /
    • 2006
  • This Study is about the development of LCC Analysis Model and Evaluation of VE. It was carried out to help the person's intention decision about choosing the pavement construction method that can deal with 'Pavement Life Factor' like Area Character and Traffic Volume efficiently, by considering the total life cycle cost of pavement life cycle happens according to the numbers of public use year. For this, we developed the new LCC Analysis Model by using the Data of Seoul city the representative city in Korea, and carried out VE Evaluation that reflects the opinions of specialists. This Analysis Model consists of cost items that affects directly the choice of pavement construction, except for the common cost items of the various pavement construction. And we investigated the propriety by applying our model to the example line that are used for the public at present. About the base data of cost items that are used for our analysis, we enhanced our model's confidence by using the statistics data of Seoul and the standard data of unit cost calculation.

Establishment of WBS·CBS-based Construction Information Classification System for Efficient Construction Cost Analysis and Prediction of High-tech Facilities (하이테크 공장의 효율적 건설 사업비 분석 및 예측을 위한 WBS·CBS 기반 건설정보 분류체계 구축)

  • Choi, Seong Hoon;Kim, Jinchul;Kwon, Soonwook
    • The Journal of the Korea Contents Association
    • /
    • v.21 no.8
    • /
    • pp.356-366
    • /
    • 2021
  • The high-tech industry, a leader in the national economy, has a larger investment cost compared to general buildings, a shorter construction period, and requires continuous investment. Therefore, accurate construction cost prediction and quick decision-making are important factors for efficient cost and process management. Overseas, the construction information classification system has been standardized since 1980 and has been continuously developed, improving construction productivity by systematically collecting and utilizing project life cycle information. At domestic construction sites, attempts have been made to standardize the classification system of construction information, but it is difficult to achieve continuous standardization and systematization due to the absence of a standardization body and differences in cost and process management methods for each construction company. Particular, in the case of the high-tech industry, the standardization and systematization level of the construction information classification system for high-tech facility construction is very low due to problems such as large scale, numerous types of work, complex construction and security. Therefore, the purpose of this study is to construct a construction information classification system suitable for high-tech facility construction through collection, classification, and analysis of related project data constructed in Korea. Based on the WBS (Work Breakdown Structure) and CBS (Cost Breakdown Structure) classified and analyzed through this study, a code system through hierarchical classification was proposed, and the cost model of buildings by linking WBS and CBS was three-dimensionalized and the utilized method was presented. Through this, an information classification system based on inter-relationships can be developed beyond the one-way tree structure, which is a general construction information classification system, and effects such as shortening of construction period and cost reduction will be maximized.

A System Development of Quantity Data Type Analysis for BIM based Automation of Estimation Framework (BIM기반 견적자동화 체계구축을 위한 물량 데이터 유형 분석 체계 개발)

  • Lee, Jae-Joon;Shin, Tae-Hong;Kim, Seong-Ah;Kang, Myung-ku;Chin, Sang-Yoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.744-747
    • /
    • 2008
  • Quantity information focused on a design drawing plays a critical role in a decision making related to cost for project participants during project life cycles. Related participants absolutely depend on quantity take-off working which produces the quantity information by hand, and then a worker's mistake often causes many errors. The difference of quantity by the know-how of the person in charge of the estimation also occurs. In addition, the worker passes through the whole quantity take-off processes again in case of re-working for quantity take-off produced by a change order. The requirements about the automated estimation increase because of the needs for the accurate quantity take-off and dealing with the change order and recently, the studies about the automated estimation working process based on 34 cad model from 3d cad modeler are attempted in various viewpoints. However, the existing studies reach the limits such as common quantity data type framework for getting Quantity information. Focused on a certain 34 cad modeler and BIM based automation of estimation using it Therefore, the objective of this study is to develop the a series of system which can extract, analyze, and verify Quantity Data Type in modeler to automate quantity take-off originated from various 3d cad modelers as a foundation study for BIM based automation of estimation framework.

  • PDF

Identification of Breakdown Structure for Infrastructure Maintenance, Repair, and Rehabilitation Technologies using Comparative Case Study (비교사례 연구를 통한 인프라 유지관리 기술 분류체계 도출)

  • Kim, Du Yon;Cha, Yongwoon;Park, Wonyoung;Park, Taeil
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.10
    • /
    • pp.248-258
    • /
    • 2020
  • This study proposed a breakdown structure for maintenance and management technologies under the concept of comprehensive asset management at the life cycle level of infrastructure based on benchmarking with other developed countries. For this purpose, a comparative case study was performed to review and analyze the existing definitions and hierarchies for infrastructure maintenance, repair, and rehabilitation (MR&R) systems under major industrialized countries and South Korea. In accordance with the ratio of maintenance costs to GDP, the U.S., U.K, and Japan were selected to review their systems. The classifications and definitions of MR&R technologies under the laws were analyzed. The result showed that most developed countries differentiate maintenance and repair from improvement and constitute a system centered on preventive maintenance activities. On the other hand, Korea's system for facility management is not definitely classified and still focused on reactive structures, which need to be improved. In this study, as proposed, a breakdown structure established the concept of Maintenance and Management, Maintenance & Repair, and Performance Improvement. Consequently, this study could be used as the basis for the implementation of preventive MR&R activities and reasonable resource allocations from an asset management point of view.

A Case Study of BIM-based Framework on Constructability Tasks (BIM기반 골조공사의 시공성분석 업무 적용사례에 관한 연구)

  • Lee, Seung-Il;Kwon, Nam-Ha;Cho, Young-Sang
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.5
    • /
    • pp.45-54
    • /
    • 2010
  • Recently more and more construction projects have become high-rise, complex and intelligent. Accordingly, such projects require an integrated management system for tasks, with a lean approach to construction with work processes for management and productivity. In particular, Construction Information Technology (CIT) fields are concerned with Building Information Modeling (BIM), which represents the process of generating and managing building data during its life cycle. Constructability research has progressed for the project goal which is a cost-time-quality of optimization by integrated construction knowledge and experience. However, the current constructability process has not been performed efficiently, as the existing 2D drawings and papers lack consistent and accurate information, it is difficult to share the contents of work, and the use of information is inefficient. This study proposes that the reformation and enhancement of BIM-based constructability work process can lead to brilliant performance in the framework of the construction phase through achieving collaboration between the design team and the workers at the site.

Objective Reduction Approach for Efficient Decision Making of Multi-Objective Optimum Service Life Management (다목적 최적화 기반 구조물 수명관리의 효율적 의사결정을 위한 목적감소 기법의 적용)

  • Kim, Sunyong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.2
    • /
    • pp.254-260
    • /
    • 2017
  • The service life of civil infrastructure needs to be maintained or extended through appropriate inspections and maintenance planning, which results from the optimization process. A multi-objective optimization process can lead to more rational and flexible trade-off solutions rather than a single-objective optimization for the service life management of civil infrastructure. Recent investigations on the service life management of civil infrastructure were generally based on minimizing the life-cycle cost analysis and maximizing the structural performance. Various objectives for service life management have been developed using novel probabilistic concepts and methods over the last few decades. On the other hand, an increase in the number of objectives in a multi-objective optimization problem can lead to difficulties in computational efficiency, visualization, and decision making. These difficulties can be overcome using the objective reduction approach to identify the redundant and essential objectives. As a result, the efficiency in computational efforts, visualization, and decision making can be improved. In this paper, the multi-objective optimization using the objective reduction approach was applied to the service life management of concrete bridges. The results showed that four initial objectives can be reduced by two objectives for the optimal service life management.

A study on the Composition of the Production Rates System to Prepare Standards for Calculating the Construction Cost of PC Structure Apartments Based on Off-Site Construction (OSC) (OSC 기반 PC구조 공동주택 공사비 산정기준 마련을 위한 품셈 체계 구성에 관한 연구)

  • Lee, Hansoo;Lee, Chiho;Lee, Jeongwook;Noh, Hyunseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.96-106
    • /
    • 2021
  • The PC structure based on the OSC (Off-Site Construction) is mentioned as a representative method of innovation in the construction industry that converts the existing construction environment from site-centered to factory production-transportation-site assembly. However, recent research on PC method has focused on improving the functions of subsidiary materials and improving the production system to increase productivity and institutional / policy R&D that can be universally applied to the life-cycle stage of ordering / design /construction is insufficient. In particular, the absence of standardized cost calculation standards makes it difficult to calculate and verify of objectified appropriate construction cost. So which is an obstacle to the activation of the PC method. In this study, the standards for construction costs of domestic and foreign PC method were surveyed and similar Construction Standard Production Rates were analyzed to confirm the product structure suitable for PC method. Subsequently, the construction procedures and input resources for each PC subsidiary materials were identified through on-site surveys to derive component for subsidiary materials, and the factors of change in the product according to the construction characteristics(height, weight of subsidiary material) were verified. As a result the standard product calculation system suitable for the site installation of the PC method for apartment was presented.

Correlation Analysis of Load-carrying Capacity by Safety Inspection Indicators in Bridges (교량 안전점검 지표별 내하성능 상관관계 분석)

  • Jung, Kyu San;Seo, Dong Woo;Kim, Jae Hwan;Cho, Han Min;Park, Ki Tae;Shin, Yeon-Woo
    • Journal of Korean Society of Disaster and Security
    • /
    • v.15 no.3
    • /
    • pp.89-99
    • /
    • 2022
  • Bridges are a key infrastructure that underpins economic and social activities. In Korea, bridges began to be built with economic development in the 1970s and were built intensively in the 1980s and 1990s. In recent years, as the number of bridges with a service life of more than 30 years is increasing, continuous maintenance is required to ensure the safety of the bridges. In particular, in order to cope with the aging of bridges, research on technology development such as maintenance using ICT technology, preventive maintenance, life cycle cost reduction, and long life bridge is being actively promoted. This paper presents the results of correlation analysis based on the safety evaluation data of bridges as part of the research on the development of a model for estimating load-carrying capacity of bridges. As a analysis result, indicators highly correlated with the load-carrying capacity of the bridge was derived.

사학연금 가입자들을 위한 점진적 퇴직제도의 도입방안에 관한 연구

  • Lee, Jeong-U
    • Journal of Teachers' Pension
    • /
    • v.2
    • /
    • pp.47-102
    • /
    • 2017
  • 오늘날 대다수의 선진 국가들은 고령화 사회에 대비하여 자국의 노후소득보장 제도를 대대적으로 개혁해 오고 있다. 우리나라의 경우에서도 지난 2015년 사학연금제도의 개혁이 이러한 취지에 해당될 수 있을 것이다. 본 연구에서는 고령화 사회의 문제가 단순히 노인부양비용의 증가 그 자체가 아니라, 평균수명의 증가에도 불구하고 늘어나게 된 노후의 삶에 대한 시간적 배분이 근로와 여가에 걸쳐 균형적으로 이루어지지 않고, 사회적 부양을 필요로 하는 노후의 여가만 일방적으로 늘어나고 있다는 점을 문제점으로 지적하였다. 따라서 이러한 차원에서 볼 때 고령화 사회의 문제는 생애근로기간의 연장을 통해서만 효과적으로 극복할 수 있을 것으로 생각된다, 하지만 이와는 반대로 개인별로 건강상태나 가족상황 등의 이유로 생애근로주기의 연장이 불가능한 사람들을 위하여 별도의 제도적 장치가 추가적으로 마련되어야 할 것이다. 종합해 보면, 고령화 사회의 노동시장 문제는 개인별로 다양한 욕구나 능력을 반영하여 각자에게 다양한 선택권을 보장해 줄 수 있는 방향으로 개선되어야 할 필요가 있다. 본 연구에서는 고령화 사회에 대비하여 연금수급연령 상향조정의 필요성을 사학연금제도를 중심으로 살펴보고, 대신 그로 인해 발생할 수 있는 소득공백문제와 연금가입경력 공백문제 등 제반의 충격을 흡수할 수 있는 제도적 장치로서 점진적 퇴직제도의 도입방안을 제안하였다. 개략적으로 사학연금제도에 있어서 점진적 퇴직모형은 법정연금수급연령의 인상 일정에 따라 다음과 같이 운영하는 방안을 제안하였다. 먼저 법정연금수급연령이 60세로 유지되는 2022년까지의 단기적 대책으로서 여기서 점진적 퇴직의 자격연령은 모든 가입자에게 60세로 적용하도록 한다. 이 경우 가입자들의 신분구분에 따라 각각 교수 5년, 교원 2년(문제해결에 대한 정책적 의지에 따라 이행구간을 확장할 수도 있음) 그리고 교직원 0년의 조기의 점진적 퇴직이 허용되므로, 현재 교원이나 교수의 임용대란문제에 효과적으로 대응을 할 수 있는 장점이 있다. 다음으로는 2023년 이후 2033년 사이 법정연금수급연령의 인상단계에 해당되는 기간 동안의 대책으로서 여기서는 교수, 교원, 교직원에게 적용되는 정년연령과 매년도 법정연금수급연령 사이의 기간을 조기의 점진적 퇴직 이행구간으로 정하도록 한다. 그리고 이러한 이행구간에 상당하는 기간만큼 후기의 점진적 퇴직 이행구간을 별도로 설정하여 그에 적절한 혜택이 주어질 수 있도록 한다. 마지막으로 2033년 이후부터는 교수, 교사, 교직원의 신분구분 없이 모두에게 적용되는 사항으로서 65세를 기준으로 그 이전의 5년은 사학연금의 적용을 받는 조기의 점진적 퇴직 그리고 그 이후의 5년은 국민연금의 적용을 받는 후기의 점진적 퇴직이 이루어질 수 있도록 한다. 그리고 전체 10년의 점진적 퇴직 이행구간 동안 개인별로 퇴직시점이나 퇴직형태의 선택이 자유롭게 이루어질 수 있도록 하기 위하여 보험수리의 원칙에 입각한 감액률 또는 가산율의 엄격한 적용을 제안하였다. 그리고 고령계층이 자신의 근로시간을 단계적으로 단축할 수 있도록 하고, 그 과정에서 발생하게 되는 소득의 감소부분은 별도의 제도적 방법(가교연금, 시간가치적립계정 등)으로 충당하도록 하는 방안을 제안하였다. 나아가 점진적 퇴직제도의 운영방식은 근로시간의 단축뿐만 아니라 작업부담의 경감 등에 대해서도 인정을 해주도록 해줌으로써 임금피크제도의 기능과 연계가 가능할 수 있도록 할 것을 제안하였다.

Location Determinants for Newly Established and Relocated Manufacturing Firms (신설 및 이동 제조업체의 입지 결정요인 분석)

  • Yoojin Yi
    • Journal of the Korean Regional Science Association
    • /
    • v.40 no.3
    • /
    • pp.95-108
    • /
    • 2024
  • This study analyzes the location determinants of newly established and relocated manufacturing firms in South Korea using the National Business Survey data from 2016 to 2019. Both new establishments and relocations are concentrated in the Seoul metropolitan area, Chungcheong, Yeongnam, and Daegyeong regions, with relocated firms showing a higher degree of spatial concentration. Employing a negative binomial regression model, we find that manufacturing concentration, population density, industrial diversity, and lower wage levels positively influence both new establishments and relocations. The proportion of highly educated workers, accessibility to producer services, and average land prices only positively affect the frequency of new establishments, suggesting that firms in the early stages of their life cycle, which are more dependent on human capital and producer services, demonstrate a higher willingness to pay for land use. Conversely, increased travel time to Seoul and improved transportation accessibility enhance the probability of attracting relocated firms. This implies that cost reduction incentives associated with distance from Seoul may outweigh the benefits of proximity to the capital in relocation decisions. Our findings suggest that strengthening agglomeration economies and improving transportation infrastructure efficiency could increase the likelihood of attracting relocated manufacturing firms to non-capital regions.