• Title/Summary/Keyword: 생애주기성능

Search Result 88, Processing Time 0.031 seconds

A Comparative Analysis of Life Cycle Cost on the Window Glass and the Insulation Film Coated Glass for Window (창호 유리의 단열필름 시공에 따른 생애주기비용 비교 분석)

  • Jeong, Mingu;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.6
    • /
    • pp.583-590
    • /
    • 2014
  • The purpose of this study is to analyze and compare the life cycle cost of window glass with insulation film and regular glass, to verify an economical window construction method. As an approach method, the thermal performance data of each type of glass was measured using Window 6.3 and ECO2-OD Simulation Program, applied it to the case building to calculate the air conditioning and heating maintenance costs and LCC, and compared the economic feasibility. As a result, installing an additional insulation film prevents the solar heat penetration in the summer, so it reduces the cooling cost, on the other hand, it increased heating cost in winter. From the life cycle cost perspective, the effect of cooling cost reduction does not counterbalance the increase in heating cost and the additional cost from film installation and repair; therefore, the installation of insulation film may not be a proper method.

Practical Model to Estimate Road User Cost for Bridge Maintenance Strategy (교량 유지관리 전략 수립을 위한 실용적 도로이용자비용 추정 모델)

  • Park, Kyung-Hoon;Sun, Jong-Wan;Lee, Sang-Yoon;Lee, Jong-Soon;Cho, Hyo-Nam
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.11 no.6
    • /
    • pp.131-142
    • /
    • 2007
  • The road user cost in indirect costs as well as direct costs such as the inspection/ diagnosis cost and the repair/reinforcement cost should be considered as one of the important items in the life-cycle cost-effective design and maintenance of the bridges. To estimate the road user cost, this paper formulates the road user cost as a sum of the user delay cost and the vehicle operating cost considering the detour effect. A numerical traffic simulation and a regression analysis are performed to develop a regression model due to a time delay. The proposed regression model is applied to the generation of the maintenance strategy based on the life-cycle cost and performance, and its effectiveness and applicability is investigated. The road user cost has a great influence on establishing the maintenance strategy, and the proposed regression model could be successfully utilized to estimate the road user cost of a bridge.

Application of probabilistic VE/LCC Analysis Models for Quay Wall Structures (안벽구조물의 확률론적 VE/LCC 분석모델 적용방안)

  • Ahn, Jong-Pil;Lee, Cheung-Bin;Park, Ju-Won;Yu, Deog-Chan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.5
    • /
    • pp.71-79
    • /
    • 2007
  • It is common that the analysis of VE/LCC is performed in design phase of quay wall structures. The analysis is mainly executed based on experience and engineering sense of expert considering the selection of construction method, construction and maintenance cost. Recently there are increasing demands on the analysis that includes uncertainty and vulnerability of input parameters, for this purpose, fuzzy reliability based probabilistic VE/LCC analysis model for quay wall structures is suggested. In VE/LCC analysis for quay wall structures, the application of probabilistic analysis method give very similar results compare with those of deterministic analysis method. It is anticipated that the methodology proposed in this paper can also be utilized in the design and maintenance phase of other facilities where decision making is made for the probabilistic life cycle cost and value analysis.

Performance based Construction Specifications and Design Criteria Development Plan of Electrical Installations (전기설비분야 성능기준 개발 접근방법)

  • Kim, Se-Dong;Lee, Kwang-Sik;Choi, Eun-Hyeok
    • Proceedings of the KIEE Conference
    • /
    • 2007.11c
    • /
    • pp.117-118
    • /
    • 2007
  • 성능중심의 건설기준을 개발하고, 성능계약제도 도입방안을 구축함으로써 시설물의 성능을 향상시키고, 생애주기비용(LCC)을 절감하며, 설계 및 시공자의 기술개발을 유도하는 것이 필요하다. 본 연구에서는 건축전기설비분야의 성능기준 개념과 외국의 도입사례를 살펴보고, 성능기준 개발 대상 및 범위를 설정하고 성능 기준 개발을 위한 접근방법을 도출하였다. 앞으로 국제 경쟁력 확보를 위해서는 성능중심의 건설기술기준 적용이 필요하다.

  • PDF

Economic Analysis of Reinforced Concrete Bridges Considering Performance Evalution (성능평가를 고려한 철근콘크리트교의 경제성 분석)

  • 손용우;정영채;김종길
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.17 no.2
    • /
    • pp.141-150
    • /
    • 2004
  • Recently, it is really concerned about corrosion and aging of reinforced concrete bridges. Corrosional steel reinforcing in concrete affects not only safety of bridges structure but also bending strength of reinforced concrete's member. Rate of corrosion, characteristic of bending strength, and economical evaluation aren't clear in reinforced concrete, considering performance evaluation. The purpose of study is as follows. It studies about ability of resistance's strength and cost of life cycle according to reduction of steel reinforcing's corrosion. Moreover, it shows calculating formula of bending strength with corrosion of current rate and exactly evaluates about the rest life at corrosional reinforced concrete bridges.

VE/LCC Analysis Models of Breakwaters by Fuzzy Reliability Approach (퍼지 신뢰성 이론에 의한 방파제의 VE/LCC 분석모델)

  • Ahn, Jong-Pil;Park, Ju-Won;Yu, Deog-Chan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.3
    • /
    • pp.159-167
    • /
    • 2007
  • In this study, the concepts of integrated VE analysis assessment is introduced in order to achieve "Design for Deterioration performance" in design VE phase. For this purpose, a framework for fuzzy reliability based LCC and value analysis model using fuzzy logic based approach for breakwaters Projects is suggested. It is anticipated that the methodology Proposed in this paper can also be utilized in the design and maintenance phase of other facilities where decision making is made for the fuzzy reliability based life cycle cost and value analysis.

Analysis of Hypertension Risk Factors by Life Cycle Based on Machine Learning (머신러닝 기반 생애주기별 고혈압 위험 요인 분석)

  • Kang, SeongAn;Kim, SoHui;Ryu, Min Ho
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.27 no.5
    • /
    • pp.73-82
    • /
    • 2022
  • Chronic diseases such as hypertension require a differentiated approach according to age and life cycle. Chronic diseases such as hypertension require differentiated management according to the life cycle. It is also known that the cause of hypertension is a combination of various factors. This study uses machine learning prediction techniques to analyze various factors affecting hypertension by life cycle. To this end, a total of 35 variables were used through preprocessing and variable selection processes for the National Health and Nutrition Survey data of the Korea Centers for Disease Control and Prevention. As a result of the study, among the tree-based machine learning models, XGBoost was found to have high predictive performance in both middle and old age. Looking at the risk factors for hypertension by life cycle, individual characteristic factors, genetic factors, and nutritional intake factors were found to be risk factors for hypertension in the middle age, and nutritional intake factors, dietary factors, and lifestyle factors were derived as risk factors for hypertension. The results of this study are expected to be used as basic data useful for hypertension management by life cycle.

Framework & Functions of Configuration Management (CM) in Nuclear Power Plants (NPP) (원자력발전소 형상관리 적용을 위한 Framework 및 생애주기단계별, 관리기법별 기능리스트 도출)

  • Kang, Mi-Yeon;Jung, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.3
    • /
    • pp.101-112
    • /
    • 2015
  • In the 1950s, the concept of configuration management (CM) was started by the US Department of Defense (DOD). Later, it has begun to be applied in aerospace, software, engineering, construction, and nuclear power industry. However, configuration management (CM) in the Korean nuclear industry was firstly utilized in 2006 only for selected parts of facilities, while the US nuclear industry has applied CM for the facilities' entire systems since 1990s. Furthermore, configuration management (CM) is in its conceptual stage in the Korean nuclear industry because of ambiguous CM concepts, lacks of CM professional manpower, non-computerization, and inadequacy of CM procedures and processes. In order to address this issues, seven industries (including defense, aerospace, software, engineering, architecture, civil engineering, nuclear power) that utilize the concept of configuration management (CM) were compared and analyzed based on the CM purpose, technique, and life-cycle perspectives. By an extensive literature review and expert interviews, this paper developed a framework of configuration management (CM) for the nuclear industry. And also, a list of functions based on life-cycle stages and CM techniques are developed for clarifying CM framework in order to promote practical applications.

A Value Analysis of Ecological Restoration Construction Considering Life Cycle Cost and Performance - Focusing on the Wet Media for Slope Revegetation - (생애주기비용과 성능을 고려한 생태복원 공법 가치분석 - 습식 비탈면 기반재를 사례로 -)

  • Li, Lan;Kim, Sung Hee;Kim, Bo Heui;Lim, Su Hyun;Kim, Sung Il;Koo, Bon Hak
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.42 no.5
    • /
    • pp.101-109
    • /
    • 2014
  • In order to save costs and enhance quality in construction without damaging the environment, the VE/LCC analysis method is increasingly used. This study was carried out to conduct a value analysis for the ecological restoration of a slope considering life cycle cost and performance. The construction conditions were classified into three types(A, B, C) according to the condition of each base. Three construction methods for slope ecological restoration were selected by each condition. Eventually, a value analysis was conducted for total nine conditions by analyzing the life cycle cost and performance. The gradient of slope and base of Condition 1 were below 1:1.2 and general soil, while condition 2 and 3 were below 1:1.0(reaping rock) and below 1:0.7(soft rock, blasted rock), respectively. A value analysis was conducted based on the value estimated via life cycle cost and performance analysis. The result showed that the B construction method had the highest value in Condition 1 as it showed 108.4, while A and C showed 90.3 and 45.8, respectively. When it comes to Condition 2, Construction Method A indicated the highest value as it showed 89.1(B: 47.5, C: 47.0). In Condition 3, Construction Method A(89.1) was the highest, while B and C showed 55.4 and 40.2, respectively. Based on the result of this study, in order to make a reasonable decision that can enhance quality and reduce costs in slope ecological restoration, the slope ecological restoration method must be reviewed in consideration of life cycle cost and performance.

A Study of Port Facility Maintenance and Decision-making Support System Development (항만시설 유지관리 의사결정 지원 시스템 개발 연구)

  • Na, Yong Hyoun;Park, Mi Yeon;Choi, Doo Young
    • Journal of the Society of Disaster Information
    • /
    • v.18 no.2
    • /
    • pp.290-305
    • /
    • 2022
  • Purpose: Currently, port facility informatization technology is focused on the planning and design phases, so the necessity of research and technology development on the port facility maintenance system based on life cycle-level information is emphasized. Method: Based on the maintenance history data of port facilities and facility operation information, from the perspective of the life cycle of port facilities, the system is configured to enable maintenance decisions for port facilities through analysis of aging patterns, performance degradation prediction models, and risk analysis and proposed a method of expressing information. Result: A function was developed to simultaneously display the SOC performance evaluation and the comprehensive performance evaluation developed in this study, so that mid-to long-term maintenance and reinforcement and facility expansion can be applied and comparatively judged. Conclusion: The integrated port performance system developed in this study induces and supports the risk minimization of port facility management by proactively promoting appropriate repair and reinforcement measures through historical and operational information on port facilities.