• Title/Summary/Keyword: 사전 리스크 평가

Search Result 29, Processing Time 0.025 seconds

An Exploratory Study on the Relationship with Previous Project Risk Evaluation and Project Performance (사전 프로젝트 리스크 평가와 프로젝트 성과와의 관계에 관한 탐색적 연구)

  • Hosnag, Kim;Kyungsik Yang
    • Journal of Service Research and Studies
    • /
    • v.12 no.3
    • /
    • pp.70-92
    • /
    • 2022
  • Project risk assessment is the most important activity performed at the beginning of a project because it can judge the performance of the project in advance. In this study, We were evaluated risk with traditional risk factors such as technology and schedule, etc, and Indirect risks factors such as financial, strategic, and special risks. and then, we analyzed what kind of relationship these risk evaluation factors have on business performance and customer satisfaction. As a result of the research, it was found that the risk evaluation items had a relationship with performance and customer satisfaction. However, It is possible that the performance may differ depending on how risks are managed after risk assessment. Therefore, follow-up studies should be conducted, including information on risk management practices. This study is meaningful that presenting practical risk evaluation items and at the same time identifying the relationship with performance. We plan to further the study in future studies including the evaluation of risk management process.

A Study on the Risk Assessment Methodology and Application for International Plants Construction (해외 플랜트 공사 리스크 평가 방안 및 적용에 관한 연구)

  • An, Sung-Hoon;Lee, Young-Nam;Jo, Ho-Kyoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.1
    • /
    • pp.134-142
    • /
    • 2008
  • Recently, international plants construction markets are expending. Specially, oil/gas plants constructions in Middle-East are booming. However, international plants construction projects are high risky. So a risk assessments and managements methodology for international plants construction is needed. In this study, the risk assessment methodology for international plants construction is proposed on the basis of the literature review in the international construction risk assessment methods and the knowledge of experts explored by interview. In addition, case study in Middle East was applied for reviewing these risk assessments and managements methodology for international plants construction.

A Mathematical Model to Evaluate the Radiological Risks for the Reuse of Decommissioning Site (원자력시설 해체부지의 재이용을 위한 방사선학적 리스크 평가모델)

  • Cheong, Jae-Hak
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.4 no.4
    • /
    • pp.353-363
    • /
    • 2006
  • In order to evaluate the potential radiological risks for the reuse of the site after decommissioning of nuclear facilities, a mathematical model was developed and materialized into the Microsoft $Excel{\circledR}$ spreadsheets frame. A set of input parameter values was proposed, which is useful in the preliminary risk screening step before the detailed evaluation with the site-specific data. It appeared that the screening levels calculated by the present model was agreed with the derived concentration guideline limits resulted from RESRAD Ver.6.2 and the German dose criteria for releasing a nuclear site from regulatory control.

  • PDF

Application of risk evaluation and safety management system in urban deep tunnelling (도심지 대심도 터널에서의 리스크 평가 및 안전관리시스템 적용)

  • Moon, Joon-Shik;Jeon, Kichan;Kim, Younggeun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.6
    • /
    • pp.725-744
    • /
    • 2022
  • As the construction of infrastructure using the underground tunnel in urban area have been rapidly increased, various accidents and collapses of tunnel including structure have been occurred in deep urban tunnelling. The concern and worry relating to the risk and safety of the tunnel during excavation is becoming the key issues in deep urban tunnelling. In this study, it was conducted for deep urban tunnel at GTX (Great Train Express) line which was located in Seoul metropolitan area to determine the risk characteristics for tunnel according to urban tunnelling. Also, it was reviewed the risk analysis and evaluation of the tunnel, shaft and station. And after a review of risk analysis and evaluation for risk register and hazard identification by using a risk matrix method, safety management of the tunnel according to excavation was evaluated to be secured. This study is expected to be applied as useful approach in deep urban tunnelling if you need to review the risk and safety management system of tunnel according to mitigation measures in complex urban tunnelling.

IT Risk Assessment: Case Study on Domestic Construction company (IT 리스크 평가 연구사례: 국내 건설사 적용 사례)

  • Lee, youngjai;Lee, Sungjung;Lee, Seongil
    • Journal of Korean Society of societal Security
    • /
    • v.2 no.1
    • /
    • pp.47-55
    • /
    • 2009
  • Organizations and customers lose if business activities are discontinued by an incident of information systems under the current business environment because they pursue real time enterprise and on demand enterprise. The loss includes the intangible decline in brand image, customer separation, and the tangible loss such as decrease in business profits. Thus, it is necessary to have preparedness in advance and mitigation for minimization of a loss due to the business discontinuity and IT risks. This paper described a IT risk assessment case about domestic construction company.

  • PDF

TBM risk management system considering predicted ground condition ahead of tunnel face: methodology development and application (막장전방 예측기법에 근거한 TBM 터널의 리스크 관리 시스템 개발 및 현장적용)

  • Chung, Heeyoung;Park, Jeongjun;Lee, Kang-Hyun;Park, Jinho;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.1
    • /
    • pp.1-12
    • /
    • 2016
  • When utilizing a Tunnel Boring Machine (TBM) for tunnelling work, unexpected ground conditions can be encountered that are not predicted in the design stage. These include fractured zones or mixed ground conditions that are likely to reduce the stability of TBM excavation, and result in considerable economic losses such as construction delays or increases in costs. Minimizing these potential risks during tunnel construction is therefore a crucial issue in any mechanized tunneling project. This paper proposed the potential risk events that may occur due to risky ground conditions. A resistivity survey is utilized to predict the risky ground conditions ahead of the tunnel face during construction. The potential risk events are then evaluated based on their occurrence probability and impact. A TBM risk management system that can suggest proper solution methods (measures) for potential risk events is also developed. Multi-Criterion Decision Making (MCDM) is utilized to determine the optimal solution method (optimal measure) to handle risk events. Lastly, an actual construction site, at which there was a risk event during Earth Pressure-Balance (EPB) Shield TBM construction, is analyzed to verify the efficacy of the proposed system.

Evaluation of Privacy Impact Assessment for the Electronic Medical Record System in Saitama Hospital (사이타마 병원 전자차트 시스템에 대한 개인정보 영향평가 실시)

  • Shin, Sanhhyu;Seto, Yoichi;Takasaka, Sadamu;Sekizuka, Eiichi
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2014.11a
    • /
    • pp.419-422
    • /
    • 2014
  • 본 논문은 국립 사이타마 병원(일본)이 계획하고 있는 새로운 전자차트 시스템 도입을 위한 병원정보 시스템 시방서(안)에 대한 개인정보 영향평가 평가방법과 결과를 정리한 것이다. 의료정보 시스템이 취급하는 데이터는 민감한 개인정보를 포함하고 있으며 한 번 유출된 개인 정보를 회수하기란 어렵다. 따라서 시스템 구축에 있어서 개인정보보호에 대한 중요성이 높아지고 있다. 개인정보 영향평가는 개인정보 유출에 대한 리스크를 시스템 가동 전에 평가하여 리스트를 경감하는 방법으로, 리스크를 가시화함으로써 사전에 리스크에 대한 대책방안을 마련할 수 있다.

Ex Ante Evaluation Methodology for IT Investment Decision Making: Integrating the Current Best Practice Methods and Applications (정보화 투자 사전평가방법론: Best practice 평가기법 및 적용사례의 통합)

  • Lee, Kuk-Hie;Park, So-Hyun
    • Information Systems Review
    • /
    • v.10 no.1
    • /
    • pp.135-164
    • /
    • 2008
  • This research is to offer a structured yet practical ex-ante evaluation methodology for IT investment. Benchmarking the best practices of four Korean organizations, we try to integrate core processes, relevant measures, and evaluation dimensions into a consistent and wholesome body of evaluating methodology. The best practices we considered encompass a wide range of business enterprises, including for-profit, non-profit, service-oriented, and manufacturing entities. The proposed methodology consists of three stages; the first stage checks the validity of investments by looking into comprehensiveness of planning, willingness to accomplish, justifiable grounds for the investments, overlapping investments, and obstructing risks; the second do so by putting an IT investment into economic, strategic, and technological perspectives; and the last third would produce a unified quantity that summarizes outcome of the previous stages. Incorporating the proven knowledge, guidelines, and quantifying tools, the methodology could make a valuable reference model for IT evaluation practitioners who have been bedeviled by having to going through such ex-ante evaluations.

An Analysis on the Characteristics of Each Phase's Risk Factors for High-Rise Development Project (초고층 개발사업 추진을 위한 단계별 리스크 요인의 특성 분석)

  • Chun, Young-Jun;Cho, Joo-Hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.4
    • /
    • pp.103-115
    • /
    • 2016
  • The 106 buildings of 200 meters' height or greater were completed around the world in 2015 (CTBUH, The Council on Tall Buildings and Urban Habitat). They beat every previous year on record, including the previous record high of 99 completions in 2014. This brings the total number of 200-meter-plus buildings in the world to 1,040, exceeding 1,000 for the first time in history and marking a 392% increase from the year 2000, when only 265 existed. South Korea recorded three completions during 2015 - improving slightly over 2014, in which it had one. This study focused on the fact that high-rise building development project risks have not reduced in Korea in spite of numerous studies and measures. And it attempted to examine whether existing studies and measures have been presented on the basis of the accurate analysis of existing studies and measures and classify and analyze the characteristics of each phase' s risk factors in the hope that its results would be one reference point as to the measure to prevent high-rise building development project risks in the future. A high-rise building development project is the high risk project as compared with the low-rise project. Because a high-rise development project takes long and is very sensitive to the changing environment. Therefore, in order to succeed the project it becomes necessary to effectively manage the risk involved in the process of the high-rise building development project. The result of this study can be used as the guideline to make the risk management system for the high-rise development project.

Integrated Risk Analysis for Mitigation the Urban Flood Disaster (도시홍수 피해 경감을 위한 통합 리스크 분석)

  • Lee, Jae Yeong;Keum, Ho Jun;Han, Kun Yeun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2017.05a
    • /
    • pp.50-50
    • /
    • 2017
  • 도시홍수의 잠재적 위험은 홍수경감계획이 발전됨에 따라 감소하지만, 침수피해 가능성은 도시화와 도시 확장에 따라 증가한다. 침수피해 가능성에 대한 사전 파악 및 위험도 분석은 대규모 침수재해 발생 시의 위기관리에도 도움을 준다. 또한, 경제적 피해에 대한 예측은 재해발생 후 복구 및 복원 작업에 필요한 자원 할당에 매우 유용하며, 잠재적 홍수 피해에 대한 예측은 장기적인 홍수경감계획과 재해관리에 필요하다. 본 연구에서는 다차원 침수해석 모형의 결과로 산정 가능한 침수심, 유속 등의 지표들을 복합적으로 고려하여 침수위험도를 산정하고, 침수 발생 위험이 있는 지역의 인문 사회 경제적 지표를 통해 피해 저감 및 복구성을 반영하기 위한 재해 취약인자를 선정하여 해당 지역에 대한 취약도를 산정하였다. 또한, 분석된 위험도와 취약도의 연산으로 통합리스크 분석을 실시하여 침수 발생 시 해당지역에 대한 피해 예상과 지역별 상대평가가 가능하도록 하였다. 위험도와 취약도 및 리스크 분석은 다양한 인자를 동시에 고려하기 위해 여러 개의 기준에 대한 선호도를 결정하거나 최적 대안을 선택하는 다기준의사결정(MCDM)기법을 적용하였으며, MCDM기법 중 보편적으로 많이 이용되는 TOPSIS기법을 적용하였다. 이러한 리스크 분석은 우리나라 전체, 특정 시도, 시군구, 읍면동 간의 침수피해와 관련한 상대적 비교 평가가 가능하며, 대응 및 대비의 관점에서 저감 대책 수립의 우선 지역을 도출하는 데 활용될 수 있을 것이며, 침수피해 발생 후, 리스크가 큰 지역에 대해 우선적으로 복구 조치가 이뤄질 수 있을 것이다. 또한, 한정된 지자체 예산 안에서 도시홍수 피해 경감 대책 수립을 위한 의사결정에 활용될 수 있을 것으로 판단된다.

  • PDF