• Title/Summary/Keyword: 사장교의 시공

Search Result 70, Processing Time 0.029 seconds

The Erection Method of Starter Segment for Cable Stayed Bridge using Asymmetric System and Cable (케이블과 비대칭 구조를 이용한 사장교 주두부 시공 방법)

  • Cho, Seo-Kyung;Yoon, Tae-Seob;Jeong, Seung-Wook;Lee, Jea-Chan;Eo, Jun
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2002.05a
    • /
    • pp.1031-1038
    • /
    • 2002
  • In this paper the erection method of the Seohae Bridge starter is presented. The erection method of starter for cable stayed bridge was changed from conventional bracket supported erection to heavy lifting supported directly by stays. There was the need to reduce the erection time drastically. The cost saving was obtained as a bonus.

  • PDF

Stability Analysis of Steel Cable-stayed Bridges under Construction Stage (폐합 전 강사장교의 안정성 해석)

  • Kim, Seung-Jun;Shim, Kyung-Suk;Won, Deok-Hee;Cho, Sun-Kyu;Kang, Young-Jong
    • Journal of Korean Society of Steel Construction
    • /
    • v.23 no.1
    • /
    • pp.99-111
    • /
    • 2011
  • This paper presents an investigation of the structural stability of cable-stayed bridges in the construction stage, using geometric nonlinear finite-element analysis and considering various geometric nonlinearities, such as the sag effect of the cables, the P-${\Delta}$ effects of the girder and mast, and the large displacement effect. Initial shape analysis and construction-stage analysis were performed to determine the equilibrium of the structure in the construction stage. After that, geometric nonlinear analysis was performed to study structural stability. In this study, the weight of the derrick crane and the key segment were considered the main external loads, which were applied to the tip of the center span. The cable arrangement type and the stiffness ratios of the girder and mast were considered the main parameters of the analytic research. Based on the results of the analysis, the change in the buckling mode and critical load factors with respect to the cable arrangement type and the stiffness ratios of the girder and mast was investigated. The buckling modes of the steel cable-stayed bridges in the construction stage were classified, and the ranges of the stiffness ratios of the girder and mast, which show these classified buckling modes, were suggested.

Structural Safety Analysis of a Long Span Cable-stayed Bridge with a Partially Earth Anchored Cable System on Dynamic Loads during Construction (일부타정식 케이블 시스템 장경간 사장교의 시공 중 동적 안전성 분석)

  • Won, Jeong-Hun;Kim, Gyeoung Yun
    • Journal of the Korean Society of Safety
    • /
    • v.31 no.4
    • /
    • pp.104-110
    • /
    • 2016
  • The effect of a partially earth anchored cable system on the structural safety of a long span cable-stayed bridge under seismic and wind loads are examined during construction process. By assuming the FCM (free cantilever method) construction stages with structural vulnerability, a multi-mode spectral analysis and a multi-mode buffeting analysis are performed for specific seismic load and wind load, respectively. Results show that the wind load dominates the structural safety of a cable-stayed bridge during construction. And, the application of a partially earth anchored cable system can enhance structural safety under wind load since the maximum pylon moment in the model with partially earth anchored cable system is reduced by 49% under wind load. In contrast, the maximum pylon moment occurred by seismic load is only decreased by 8%.

Temporary Stabilizing Measures during Construction of a Steel Composite 2-Edge Girder Cable Stayed Bridge (강합성 2주형 사장교의 시공중 내풍 안정성 확보 방안 연구)

  • Kim, Young-Min;Kim, Dae-Young
    • 한국방재학회:학술대회논문집
    • /
    • 2008.02a
    • /
    • pp.63-66
    • /
    • 2008
  • The bridge deck section composed of a concrete slab resting on two I-beam girders are known to be susceptible to flutter instability and vortex shedding. Moreover, the cable stayed bridge in construction is more vulnerable to wind rather than in service when the free cantilever construction method is applied. This paper describes the effect of the dynamic wind loads on the bridge during construction and the effect of alternative temporary stabilizing measures. Therefore, a series of wind tunnel tests and numerical analysis were carried out to determine if any countermeasures were required.

  • PDF

Assessment of Visual Characteristics of Urban Bridges using Landscape Simulations - A Case Study of Yanghwaro in the Gyeongui Railroad Area - (경관시뮬레이션을 이용한 도시교량의 시각적 특성 평가 - 경의선 폐철구간 양화로 지역을 대상으로 -)

  • Chun, Hyun-Jin;Kim, Sung-Kyun
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.38 no.3
    • /
    • pp.75-82
    • /
    • 2010
  • This study formed an estimation of the visual characteristics of urban bridges in Yanghwaro in the Gyeongui Railroad Area using a landscape simulation. Existing theses have formerly only suggested directions for design based on visual preference, but there is as yet no research on the practical process of landscape design. As a result, it is difficult to directly apply this to bridge design. This study found a potential bridge site and presented a direction for bridge design in order to improve the image of the surrounding urban landscape by surveying the visual effects and landscape preferences of different bridge types. An urban landscape was produced using a landscape simulation model and was made the background for the survey. Five bridge types--Girder, Arch, Truss, Cable and Suspension--were selected and presented. The shapes of the bridges were selected based on the floor plan. The results of this study are as follows. In a preference analysis, every bridge except Girder was evaluated as a positive influence. When rating the image, 'artificial' was rated significantly higher than other traits when assessing the background image. When the Girder Bridge was introduced, 'stable' and 'orderly' were both rated highly while 'stable', 'beautiful', 'orderly' and 'interesting' were high with the introduction of the Arch Bridge. 'Beautiful', 'stable', and 'orderly' were given a high value in the introduction of the Truss Bridge and every image except 'natural', 'harmony' and 'orderly' were highly rated in the introduction of the Cable Bridge. Further, every image but 'natural' was highly rated with the introduction of the Suspension Bridge. Based on the analysis of the landscape, there is a difference in preference before and after modeling a bridge type, while the bridge itself is an influence when it is the main object of the simulated scene. This study researched only the shape of the bridge as a part of the landscape but other elements such as stability, economics, and construction are also factors in the design of a bridge. Stability, economics, construction and other factors must be considered when selecting a bridge type in the future.

Development and Performance Experiment of Iso-tensioning System using Electrical Resistance Loadcell (전기저항식 로드셀을 이용한 균등긴장시스템 개발 및 성능실험)

  • Park, Won-Tae;Chun, Kyoung-Sik
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.2
    • /
    • pp.220-226
    • /
    • 2016
  • Because MS(Multi-Strand) cables consist of many strands, a jacking force is applied to each strand one by one for cable construction. All strands should have an equal tensile force when the last one is wedged. This is the core technology for MS iso-tensioning. In this study, a new MS cable iso-tensioning system was developed for controlling and jacking the high-strength strands, with an ultimate tensile strength of 2,200MPa, for a stay cable of extra-dosed/cable-stayed bridges. The newly developed iso-tensioning system consists of electrical resistance load cells, hydraulic jacking devices, hydraulic pumps, and integrated controllers. Moreover, it is embedded with an algorithm that can control and predict the variations in tensile forces of the Master and Slave strands in real time. Actual experiments were carried out to verify the function and performance of the newly developed system. This system was applied successfully to the stay cable construction of 2nd Tae-in extra-dosed bridge in Gwangyang.

3-Dimensional FE Analysis of Construction Stages of The Cable-stayed Bridge with Steel-box Girder (강박스 사장교의 시공단계를 고려한 3D 상세 유한요소 해석)

  • Lee Tae-Yeol;Kim Young-Hoon;Shin Hyun-Yang;Kim Jae-Kwon
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2005.04a
    • /
    • pp.249-256
    • /
    • 2005
  • Rigorous FE(Finite Element) analyses of the cable-stayed bridge with steel-box girder, the main construction method of which is FCM (Free Cantilever Method), are presented in this paper. The analysis and the checking of design for a derrick crane under several loading conditions are performed using the software MIDAS/Civil and the beam elements are used to model the main structure. Among all the construction stages, special construction stages are chosen and considered to ensure the safety of segments of box girder The stress analysis for lifting of a segment of box girder is performed using the software SAP2000 and the shell elements of which having 6 DOF(Degrees Of Freedom) per nodes are successfully used to model the segment of box girder for the purpose of capturing the detailed behaviors on the folded-plates in the segment. Finally, concluding remarks are given to improve a design of the derrick crane and the segment based on the results from this study.

  • PDF

Evaluation of Cable Tension Forces Using Vibration Method for a Cable-stayed Bridge under Construction (진동법을 이용한 사장교의 시공 중 장력 평가)

  • Cho, Soojin;Yun, Chung-Bang;Sim, Sung-Han
    • Journal of the Korean Society of Safety
    • /
    • v.29 no.2
    • /
    • pp.38-44
    • /
    • 2014
  • When a cable-stayed bridge is under construction, the cable tension that changes according to the construction phase is the index indicating the proper construction management. In this study, the vibration method using the least-square estimation has been implemented to monitor changing tensions of two multi-strand cables of a cable-stayed bridge under construction. The test bridge is Hwamyung Bridge in Korea with a prestressed concrete box girder. The field tests are executed during the second tensioning stage just after the installation of the key segment. The tensions of two cables are measured before and after the tensioning and 5 days later (i.e., after finishing the tensioning of all cables). The accuracy of the estimated tensions by the vibration method has been improved by employing proper effective lengths of the cables. The measured tensions are compared with the result of the lift-off tests and design tensions. The vibration method shows very good performance in monitoring the changing tensions according to the construction phase with minimal error.

Application of Vision-based Measurement System for Estimation of Dynamic Characteristics on Hanger Cables (행어케이블의 동특성 추정을 위한 영상계측시스템 적용)

  • Kim, Sung-Wan;Kim, Nam-Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.1A
    • /
    • pp.1-10
    • /
    • 2012
  • Along with the development of coasts, islands and mountains, the demand of long-span bridges increases which, in turn, brings forth the construction of cable-supported bridges like suspension and cable-stayed bridges. There are various types of statically indeterminate structures widely applied that supported the main girder with stay cables, main cables, hanger cables with aesthetic structural appearance. As to the cable-supported bridges, the health monitoring of a bridge can be identified by measuring tension force on cable repeatedly. The tension force on cable is measured either by direct measurement of stress of cable using load cell or hydraulic jack, or by vibration method estimating tension force using cable shape and measured dynamic characteristics. In this study, a method to estimate dynamic characteristics of hanger cables by using a digital image processing is suggested. Digital images are acquired by a portable digital camcorder, which is the sensor to remotely measure dynamic responses considering convenient and economical aspects for use. A digital image correlation(DIC) technique is applied for digital image processing, and an image transform function(ITF) to correct the geometric distortion induced from the deformed images is used to estimate subpixel. And, the correction of motion of vision-based measurement system using a fixed object in an image without installing additional sensor can be enhanced the resolution of dynamic responses and modal frequencies of hanger cables.

Elasto-Magnetic Sensors-based Cross-sectional Loss Monitoring of Steel Cables (E/M 센서를 이용한 케이블 단면 손실 모니터링)

  • Kim, Ju Won;Park, Seunghee;Lee, Jong Jae;Yim, Jinsuk
    • 한국방재학회:학술대회논문집
    • /
    • 2011.02a
    • /
    • pp.92-92
    • /
    • 2011
  • 최근 건설기술의 발전과 함께 강재 케이블을 이용하는 시설물의 시공이 점점 증가하는 추세이다. 특히 현수교, 사장교와 같은 초장대 교량에 사용되는 케이블은 주거더 및 상판에 의한 하중의 대부분을 지지하는 핵심부재이다. 하지만 이러한 케이블 부재는 부식, 파단 등으로 인한 단면손실이 발생할 수 있고, 이로 인한 손상부의 응력집중으로 인해 시설물 전체의 붕괴로 이어질 수 있는 위험성을 가진다. 따라서 조기에 단면손실을 찾아 사고를 미연에 방지할 수 있는 강재 케이블 비파괴 검사 기술기반의 건전성 모니터링이 필수적이다. 이러한 효율적인 건전성 모니터링을 위해 스마트 센서를 활용한 연구가 활발히 이루어지고 있는데, 그중 대표적인 스마트 센서중 하나인 마그네틱 센서는 높은 신뢰도와 어디에나 적용 가능한 재현성 때문에 구조물 건전성 평가에 적용하기 유용한 기술로 그 적용범위가 선박, 항공등으로 점점 넓어지고 있는 추세이다. 마그네틱 센서는 그 적용대상에 따라 다양한 마그네틱 특성을 활용할 수 있는데, 최근에는 투자율 계측을 통해 케이블의 장력 측정이 가능한 Elasto-Magnetic 센서(E/M 센서)가 개발되었고 그 활용성에 대한 연구가 이뤄지고 있다. 이에 본 연구에서는 E/M 센서를 이용한 강재 케이블 모니터링 기술을 제안하고자 한다. E/M 센서는 본래 케이블의 장력측정을 위해 개발되었지만 본 연구에서는 강재 케이블 부재의 단면손실 검색을 위해 적용하였다. 제안된 기술의 실험적 검증을 위해 E/M 센서를 이용하여 4가지의 다른 직경을 가지는 강봉시편을 E/M 센서헤드의 1차 코일을 통해 자화시키고, 각각의 직경에서 출력전압을 2차 코일을 이용하여 계측하였다. 그 결과 강봉의 직경이 감소함에 따라 출력 전압이 감소함을 보였다. 반복실험을 통해 해상도 및 선형성이 확보되는 최적의 입력전압과 출력전압의 워킹포인트를 선정하였고, 선정된 조건에서 강봉시편을 일정 간격으로 스캔한 결과 단면감소에 따른 선형적인 출력전압 감소와 동시에 단면 변화 지점에서는 추세선에서 크게 벗어난 출력전압 계측값을 나타내었다. 본 실험을 통해 제안된 E/M 센서를 이용한 강재 케이블 모니터링 기술의 유용성 및 적용가능성을 확인할 수 있었다.

  • PDF