• Title/Summary/Keyword: 사업 타당성

Search Result 813, Processing Time 0.027 seconds

A Study of Feasibility Study on Construction a Public Library (공공도서관 건립 타당성 조사에 관한 연구)

  • Lee, Sang-Bok
    • Journal of Korean Library and Information Science Society
    • /
    • v.35 no.4
    • /
    • pp.491-516
    • /
    • 2004
  • The purpose of this study is to analyze the approach of economic feasibility and political and technical feasibility in the construction of a new public library. The results show that the cost-benefit analysis using in economic feasibility have the problems of benefit counting and discount rate, and also political and technical feasibility have the problems of wrong use in the rationalization of construction project. The result of this study is expected to be useful in preparing the feasibility study.

  • PDF

Study on Assessment Indicators for the Development of Agricultural Technology Development (신기술개발을 위한 사전평가지표 개발)

  • Ku, Kyo Young;Kwak, Cheul Soon;Hwang, Dae Yong
    • Journal of Agricultural Extension & Community Development
    • /
    • v.19 no.4
    • /
    • pp.1095-1136
    • /
    • 2012
  • The study demonstrated the pre-feasibility evaluation of the new agricultual technology R&D project and the ways to improve it. The study created new criteria for pre-feasibility evaluation based on the results acquired from the examination and analysis of pre-feasibility evaluation systems and criteria of various institutions at home and abroad in order to understand the current state of the evaluation method conducted by the Rural Development Administration and to seek ways for its improvement. The new criteria include indices for technicity, marketability, and feasibility. Based on these, questionnaires were prepared and the answers on them were statistically analyzed to set weights between indices. It was found that feasibility appeared the highest, in particular, feasibilities related to budget appropriateness, novelty, possibility of demand for the technology, and potential of commercialization appeared high. Referring to this conclusion, a simple operation process of pre-feasibility evaluation was introduced in the study.

Literature Studies for Testing validity of Business Model of High-tech Starts-up;Utilizing BMO Model (창업기업의 비즈니스 모델 타당성 평가방안의 이론적 고찰;BMO 모델 응용 중심으로)

  • Chung, Hwa-Young;Yang, Young-Seok
    • Asia-Pacific Journal of Business Venturing and Entrepreneurship
    • /
    • v.2 no.2
    • /
    • pp.1-22
    • /
    • 2007
  • This paper is targeting on developing pre-test Methodology for start-up as tuning successful business modelling with their implementation. Start-up is asked to a complete preparation and analysis for business to enhance the success possibility. In this stream, Start-up should test the validity of their business model before starting a business. This paper deliver alternatives to meet this requirement. Overall, this paper suggest two different approaches. First, by literature review, this paper prove the importance of BM in success factor analysis of high-tech start-up. Second, This paper prove BMO Model as the best practicing model to assess the validity of BM. Additionally, this paper, BMO will be utilized to bring significant implications to sort out enhancing strategies of BM validity.

  • PDF

A study on the Feasibility Analysis factor Model for Housing Development Projects (주택개발사업의 사업성분석인자 모델에 관한 연구;사업성 분석인자의 중요도 분석 및 타당성 검증을 증심으로)

  • Hong, Yeong-Geon;Kim, Young-Ai;Kim, Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.249-254
    • /
    • 2007
  • The main bodies of housing markets of today need to carry out a systematic and objective feasibility analysis even from the step of planning in order to succeed in a diverse and complex market environment. Therefore, it is meaningful to understand this housing market environment and propose a necessary model for the feasibility analysis of hosing business. In this vein, the aim of this study was to extract an actual and practical feasibility analysis factor and its importance for housing market, and then present and apply a feasibility analysis factor model to an on-site example, in order to verify the model's validity. For this, the investigator interviewed with and carried out a questionnaire survey of experts in housing development projects. Study findings are as follows:First, the feasibility analysis factor, derived in this study, could provide a ground to evaluate the feasibility of subject projects in the planning of development through an analysis index. Second, when feasibility is under the level of carrying out the projects, it is possible to reexamine the projects through extracting analysis factors of which points are under the standard and via a feedback process for improvable analysis factors. Therefore, the result of applying the feasibility analysis model of this study to actual housing development projects analytically shows that the model could provide a practical evaluation criterion to the person in charge of project development through an analysis index.

  • PDF

Benefits of Water Supply (수자원공급의 사회적 편익)

  • Park, Doo-Ho;Ryu, Mun-Hyun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2008.05a
    • /
    • pp.570-574
    • /
    • 2008
  • 용수 공급의 편익에 대한 개념적인 접근을 시도하였다. 실제 용수공급과 관련된 많은 국가 사업이 진행되고 있고 이에 대한 타당성검토가 KDI등을 통해 수행되고 있다. 물론 일반적이고 공통적인 잣대를 가지고 국가사업을 평가해야 겠지만 수자원에 대한 특수성을 반영하지 못한 다면 자칫 사회적인 혼란이 야기될 것이다. 수자원의 공급을 통해 발생하는 편익은 유형의 효과만이 아니라 무형의 효과가 더 크고 이를 반드시 반영해야 할 것이다. 편익이란 기본적으로 소비자가 느끼는 효용(utility)의 합이며 생산활동 과정에서 파급되는 부가가치를 의미한다. 따라서 이것들이 타당성분석과정에 반영되어야 할 것이다.

  • PDF

Cost-Benefit Analysis of Oxy-Combustion Demonstration Project (순산소발전 실증사업의 비용-편익 분석)

  • Jin, Se-Jun;Yoo, Seung-Hoon
    • Journal of Energy Engineering
    • /
    • v.21 no.2
    • /
    • pp.179-186
    • /
    • 2012
  • A climate change by increase of greenhouse gas is coming to the front by a large issue, and oxy-combustion demonstration project is coming to the attention to one plans for the reduction of carbon dioxide in power generation sector that used a fossil energy in points of time. This paper estimates benefit of electric generation, benefit of greenhouse gas reduction, benefit of environmental pollutant decreasing and domestic and foreign market value-added benefit caused by oxy-combustion demonstration project. Furthermore, this paper attempts to cost-benefit analysis, using NPV, B/C ratio, IRR techniques for oxy-combustion demonstration project. The results indicate that NPV is 681,620million KRW, B/C ratio 1.69 and IRR 21.4%. Accordingly, oxy-combustion demonstration project ensures economic feasibility that the three indicators have exceeded 0, 1.0 and 5.5%. Moreover, uses of the result is useful for the reduction of carbon dioxide in thermal power generation sector of policy decision.

An analysis on the propriety of pilot project and the Management Performance in Korea's new technology adaptation Farming (신기술 수용농가의 시범사업 타당성 및 경영성과 분석)

  • Kim, Yean-Jung;Han, Hye-Sung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.9
    • /
    • pp.5859-5864
    • /
    • 2015
  • The purpose of this study is to analyze the outcomes of experts' survey for Cultivation techniques of good seed bulb in garlics program, purpose of introduction, and performance analysis this program. As a result of survey on new technology adoption to be cultivated in cultivation techniques of good seed bulb in garlics, technique satisfaction scored the highest with 4.3 points whereas innovation scored 4.21 points. On the other hand, risk scored the lowest with 2.53 points. Also, using BMO model business attractiveness and business fit scored 44 points, 45points respectively. Thus, the project rate of success were analyzed by more than 80 per cent. Finally, the management performance is analyzed on the garlic farms by selecting the highest awareness collected. As a result of effects after new technology adoption, 43% of the surveyees stated that the relative management costs dramatically decreased, and increase in production.

군 유휴공간 태양광발전 경제성 연구

  • Jang, Tae-Mun;Kim, Gyeong-Nam
    • Bulletin of the Korea Photovoltaic Society
    • /
    • v.4 no.2
    • /
    • pp.62-70
    • /
    • 2018
  • 대한민국 정부는 '재생에너지 3020 계획'에 따라 2030년까지 재생에너지 발전 비중을 20%까지 확대하겠다는 방침을 세웠다. 목표 달성을 위한 태양광발전은 30.8GW을 신규설비로 확보해야 하지만 신재생에너지를 설치할 수 있는 공간은 한정되어 있어 추가적인 공간이 문제가 된다. $297km^2$의 건물 부지를 소관하고 있는 군(軍)은 공공기관 중 가장 넓은 부지를 보유한 단일 기관이다. 이러한 군 유휴공간을 활용한 민간투자방식의 태양광 발전사업 경제적 타당성을 연구하였다. 본 연구에서는 경제적 효과를 RETScreen을 통해 분석하였고, 그 결과 내부수익률(IRR) 10.7%로 경제적 타당성이 입증되어 민간투자의 사업성을 확인하였다. SWOT분석 결과에 따르면 군 태양광 BOT사업은 전력 모니터링 및 유지보수 등 사업 전 과정에서 보안 요소가 발생하지만, 강한 규제의 산지 및 임야의 대안으로 표준화된 군사시설이, 한 번의 설계로, 유휴공간에 대량 설치가 가능한, 모듈화의 이점을 가지고 있었다.

  • PDF

Feasibility Study of the Northern Terengganu Rural Development Project, Phase II, Malaysia (말레이시아 북부(北部) 뜨렝가누 농촌개발(農村開發) 제(第)2단계사업(段階事業) 타당성(妥當性) 연구(硏究))

  • Lim, Jae Hwan
    • Korean Journal of Agricultural Science
    • /
    • v.19 no.2
    • /
    • pp.201-237
    • /
    • 1992
  • 본(本) 연구(硏究)는 1992년(年) 2월(月)부터 동년(同年) 8월(月)까지 한국(韓國)의 농어촌진흥공사(農漁村振興公社)(RDC)와 말레시아의 KTA기술용역단간(技術用役團間)의 기술제휴하(技術提携下)에 아세아개발은행(亞細亞開發銀行)의 기술협력기금(技術協力基金)에 의(依)한 말레지아북부(北部) Terengganu 농촌개발제(農村開發第)2단계사업(段階事業)의 타당성조사연구(妥當性調査硏究) 결과(結果) 중 말레시아정부(政府)의 경제정책방향(經濟政策方向), 농업개발(農業開發) 및 사업(事業)의 경제적(經濟的) 재무적(財務的) 타당성(妥當性)만을 발췌(拔萃)하여 본(本) 논문(論文)에 수록(收錄)하였다. 본(本) 농촌개발사업지구(農村開發事業地區)는 말레시아의 북동(北東)쪽에 위치(位置)하고 있는 Terengganu State의 Setiu-Besut양(兩) Distict가 포함(包含)되는데 경제적(經濟的)으로 가장 낙후(落後)된 지역(地域)으로 매년(每年) 행사(行事)처럼 찾아오는 홍수(洪水)때문에 농경지(農耕地)를 집약적(集約的)으로 경작(耕作)하지 못함으로써 지역농민(地域農民)들은 빈곤(貧困)에서 벗어나지 못하고 있고 침수기간중(浸水期間中)에는 지역(地域)의 경제활동(經濟活動)은 물론(勿論) 교통(交通)마저 불통(不通)되고 농촌하부구조(農村下部構造)의 손실(損失)은 물론(勿論) 사회경제적(社會經濟的)인 손실(損失)이 크며 Setiu River의 하구(河口)가 침전(沈澱)되어 어선(漁船)의 출입(出入)이 점점(漸漸) 곤란(困難)해지므로써 어민(漁民)들의 생계(生計)에도 위협(威脅)을 주는 지역(地域)이다. 따라서 본(本) 타당성(妥當性) 조사연구(調査硏究)의 근본적(根本的)인 목적(目的)은 농촌(農村)의 빈곤(貧困)을 타파(打破)하기 위하여 (1) 홍수(洪水)를 방지(防止)하고, 배수(排水) 및 관개개선(灌漑改善)을 하며, 하구(河口)를 개발(開發)하여 어민(漁民)들의 생산활동(生産活動)을 돕고 지역주민(地域住民) 및 농민(農民)들의 경제활동(經濟活動) 및 농업생산성(農業生産性)을 제고(提高)시키며 (2) 환경보호(環境保護) 및 관리(管理)를 통(通)하여 지역주민(地域住民)에게 쾌적(快適)한 농촌생활환경(農村生活環境)을 제공(提供)하고 생태계(生態系)의 변화(變化)를 방지(防止)하며 (3) 다각적(多角的)인 영농활동(榮農活動)을 통(通)하여 지역농민(地域農民)의 소득(所得)을 극대화(極大化) 할 수 있는 개발(開發)의 기본구상(基本構想)과 이에 대한 기술적(技術的) 경제적(經濟的) 타당성(妥當性)을 구명(究明)하는 것이다. 본(本) 사업지역(事業地域)의 총면적(總面積)은 9,500ha이며 이는 4,680ha의 기설지구(旣設地區)의 개보수관개사업(改補修灌漑事業)과 500ha의 과수단지(果樹團地), 200ha의 채소단지(菜蔬團地), 500ha의 옥수수단지(團地), 250ha의 엽연초생산단지(葉煙草生産團地), 2,760ha의 오일팜 및 고무나무단지에 소, 염소 및 양(洋)을 사육(飼育)하는 종합적(綜合的)인 농촌개발(農村開發)로서 농가(農家)의 농업소득제고(農業所得提高)에 큰 기여(寄與)를 하게 되며 Setiu강(江)의 유역(流域) 4,090ha에 대한 홍수경감대책(洪水輕減對策)으로 지역주민(地域住民)의 생활안정(生活安定) 및 교통(交通), 관광(觀光), 사회경제적(社會經濟的) 생산활동(生産活動)을 촉진(促進)하는 사업(事業)을 하게된다. 본(本) 사업(事業)의 공사기간(工事期間)은 1993년(年)부터 5개년간(個年間)이며 총사업비(總事業費)는 외화(外貨) 2천만불(千萬弗)을 포함(包含)하여 5천(千) 5백만불(百萬弗)로 추정(推定)되었다. 년간사업수익(年間事業收益)은 사업(事業)의 완전운영기간(完全運營期間)인 2003년(年)을 기준(基準)으로 할 때 15,541백만불(百萬弗)로 추정(推定)되었으며 사업(事業)의 내구기간(耐久期間)은 30년(年)으로서 2023년(年)까지 생산(生産)이 계속(繼續)될 것이다. 본(本) 사업(事業)의 전체재무수익율(全體財務收益率)은 22.49%이며 경제적(經濟的) 수익률(收益率)은 19.30%로 경제적(經濟的)인 타당성(妥當性)이 매우 높음을 알 수 있다. 모든 사업(事業)이 계획(計劃)대로 성공적(成功的)으로 추진(推進)될 경우 사업지역내(事業地域)의 몽리농가(蒙利農家) 4,000호(戶)가 큰 혜택(惠澤)을 보게되고 농촌(農村)의 빈곤수준(貧困水準)(Poverty Line)은 현재(現在)의 36%에서 18%수준(水準)으로 경감(輕減)될 것이 기대(期待)되고 있다.

  • PDF