• Title/Summary/Keyword: 사상기법

Search Result 643, Processing Time 0.032 seconds

A Basic Study on Spatial Configuration of Gang-jin Nongsanbyeoleop (강진 농산별업(農山別業)의 공간구성에 대한 기초 연구)

  • Seo, Dong-Il;Lee, Jae-Keun
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.30 no.2
    • /
    • pp.64-71
    • /
    • 2012
  • This is a basic study for recovering original form of Nongsanbyeoleop(農山別業) in Gangjin, Jeonnam, created in the latter part of Joseon period and the estimation of originla form at the time of creation was conducted by analyzing related literature and inspecting the actual site. "Joseokruki(朝夕樓記)" of Dasan Jung, Yak Yong could estimate spatial structure and using form of Nongsanbyeoleop and the arrangement of spatial structure in literature could be confirm by on-the-site inspection. The results of this study are as follows. The first, Nongsanbyeoleop managed spatial factors applying natural topography. For the spatial characteristics of Nongsanbyeoleop, the location of ancestral ritual space including deceased father's tomb and tomb house far from the main levee of Yun, Kwang Taek, a father of Yun, Seo Yu by 1.9km and housekeeping could be confirmed. The second, spatial estimation by "Joseokruki" could be possible. "Joseokruki" describes Joseokru.Youngmojae.Hanokkwan.Cheokyunjung.Sangam as construction factors, Wundang.Kookdan.Nokwunoh. as plant factors, Sookyunggan.Keumkoji.Nokeumjung.Uijanghae as hydroponic factors and Pyoeunkok.Aengjakang as natural topography factors. However, most of them were disappeared and at present, only Youngmojae, Keumgoji, Kukdan and Wundang show the past trace. The third is for the changed space of Nongsanbyeoleop and its reason. The surrounding space of Nongsanbyeoleop was planated by land arrangement in 1960s and it played a role of topographical damage because it's recognized as the plane factor including Nongsanbyeoleop's surrounding landscape rather than dotted factor. The forth, the actual measurement of Nongsanbyeoleop and digitalization of manual map of numerical value are judged to be sufficient to apply as the basic material for recovering garden in the future. Because of the diatahce changing method applied at that time, the garden recovery of Nongsanbyeoleop intended to be concreted and 3D model established by digitalized basic materials is considered to apply for multilateral studying. Thus, Nongsanbyeoleop which is byeolseo including the tomb of deceased father based on the conceptual hyo thought shows clear differences from the organized factors of Byolseowonrim of precedent studies and the importance of Byolseowonrim is sufficient. But, the constructional factors which cannot know disappeared spatial factors and accurate location became the limitation of this study. In the future, clear verification of original form must be progressed by excavation which can confirm the location of construction factors.

A Study of the Dried-lacquer Amitabha Buddha Statue from Simhyangsa Temple (심향사 극락전 협저 아미타불의 제작기법에 관한 연구)

  • Jeong, Ji-Yeon;Motoya, Myochin
    • Korean Journal of Heritage: History & Science
    • /
    • v.47 no.1
    • /
    • pp.134-151
    • /
    • 2014
  • This paper deals with a review of the structure and production techniques of the Dried-lacquer Amitabha Buddha statue enshrined in Geungnakjeon Hall of Simhyangsa Temple, located in Daeho-dong, Naju-si, Jeollanam-do, Korea. To achieve this goal, X-ray date and two rounds of field research were performed. The data collected were reviewed, and a sample peeled off from the damaged part was analyzed to investigate the structure and material of the background layer. The results revealed that the Simhyangsa Temple Buddha statue was an almost empty Dried-lacquer(Hyeopjeo) Buddha statue where wood core had not been framed and inserted in the statue. It was thus observed that considering that the clothes wrinkles clearly remained, the same one as the irregularity of the outer clothes wrinkles, the Dried-lacquer layer was lifted made in an almost complete shape in the process of forming the clay figure as the origin form. The statue was found to be diagonally incised from the top of the head to the back of the neck to remove the clay and wood core. But in other sites, no incision was confirmed. It was observed that on the site of the head where the incision was made, an adhesives(lacquer or paste) was used. In addition, the black eyes were impacted with beads and the ears, hands, bands, and knots were made of wood. These features are identically shown in the Dried-lacquer Amitabha Buddha statue from Seonguksa Temple, known as a work of the late Goryeo dynasty; the Seated Dried-lacquer Buddha statue in Okura Museum of Art in Tokyo, Japan; the Seated Dried-lacquer Amitabha Buddha statue from Jungnimsa Temple, know as a work of the early Joseon dynasty; and the Seated Vairocana Buddha statue in Bulhoesa Temple, the Seated Dried-lacquer Amitabha Buddha and the Seated Dried-lacquer Buddha statue from Silsangsa Temple. The analysis of the back layer demonstrated that the ground layer and the red lacquer were the production of the time. In particular, the bone ash used for the ground layer was also coated for the ground layer of Buddha statues as well as for the production of the lacquerware during the Goryeo dynasty. It was also found that gold mending was conducted more than twice even in modern times and that the layer of the production time was well preserved despite gold mending several times.

Porewater Pressure Predictions on Hillside Slopes for Assessing Landslide Risks(I) -Comparative Study of Groundwater Recharge- (산사태 위험도 추정을 위한 간극수압 예측에 관한 연구(I) -지하수 유입량의 비교 연구-)

  • Lee, In-Mo;Park, Gyeong-Ho;Im, Chung-Mo
    • Geotechnical Engineering
    • /
    • v.8 no.1
    • /
    • pp.81-102
    • /
    • 1992
  • Landslides on hillside slopes with shallow soil cover over a sloping bedrock are frequently caused by increases in porewater pressures following of heavy rainfall and it is one of the most important factors of assessing the risk of landslide to predict the groundwater level fluctuations in hillslopes. This paper presents the comparative study of three unsaturated flow models developed by Sloan et al., Reddi, L.N., and Thomas, H.A., Jr., respectively, which are used to predict the increase of groundwater levels in hillside slopes. The parametric study for each of models is also presented. The Kinematic Storage Model(KSM) developed by Sloan et at. is utilized to predict the saturated groundwater flow. They are applied to the two sites in Korea so as to examine the possibility of use in the groundwater flow model. The results show that two unsaturated models developed by Sloan et al. and Reddi, L. N. are largely affected by the uncertain parameters like saturated permeability and saturated water content : the abed model has the potential of use in unsaturated flow model with the optimal estimates of model parameters utilizing available optimization techniques. And it is also found that the KSM must be modified to account for the time delay effect in the saturated zone. The results of this paper are able to be utilized in developing the predictive model of groan dwater level fluctuations in a hillslope.

  • PDF

FPGA-based One-Chip Architecture and Design of Real-time Video CODEC with Embedded Blind Watermarking (블라인드 워터마킹을 내장한 실시간 비디오 코덱의 FPGA기반 단일 칩 구조 및 설계)

  • 서영호;김대경;유지상;김동욱
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.29 no.8C
    • /
    • pp.1113-1124
    • /
    • 2004
  • In this paper, we proposed a hardware(H/W) structure which can compress and recontruct the input image in real time operation and implemented it into a FPGA platform using VHDL(VHSIC Hardware Description Language). All the image processing element to process both compression and reconstruction in a FPGA were considered each of them was mapped into H/W with the efficient structure for FPGA. We used the DWT(discrete wavelet transform) which transforms the data from spatial domain to the frequency domain, because use considered the motion JPEG2000 as the application. The implemented H/W is separated to both the data path part and the control part. The data path part consisted of the image processing blocks and the data processing blocks. The image processing blocks consisted of the DWT Kernel fur the filtering by DWT, Quantizer/Huffman Encoder, Inverse Adder/Buffer for adding the low frequency coefficient to the high frequency one in the inverse DWT operation, and Huffman Decoder. Also there existed the interface blocks for communicating with the external application environments and the timing blocks for buffering between the internal blocks The global operations of the designed H/W are the image compression and the reconstruction, and it is operated by the unit of a field synchronized with the A/D converter. The implemented H/W used the 69%(16980) LAB(Logic Array Block) and 9%(28352) ESB(Embedded System Block) in the APEX20KC EP20K600CB652-7 FPGA chip of ALTERA, and stably operated in the 70MHz clock frequency. So we verified the real time operation of 60 fields/sec(30 frames/sec).

A Method to Evaluate the Radar Rainfall Accuracy for Hydrological Application (수문학적 활용을 위한 레이더 강우의 정확도 평가 방법)

  • Bae, Deg-Hyo;Phuong, Tran Ahn;Yoon, Seong-Sim
    • Journal of Korea Water Resources Association
    • /
    • v.42 no.12
    • /
    • pp.1039-1052
    • /
    • 2009
  • Radar measurement with high temporal and spatial resolutions can be a valuable source of data, especially in the areas where rain gauge installment is not practical. However, this kind of data brings with it many errors. The objective of this paper is to propose a method to evaluate statistically the quantitative and qualitative accuracy at different radar ranges, temporal intervals and raingage densities and use a bias adjustment technique to improve the quality of radar rainfall for the purpose of hydrological application. The method is tested with the data of 2 storm events collected at Jindo (S band) and Kwanak (C band) radar stations. The obtained results show that the accuracy of radar rainfall estimation increases when time interval rises. Radar data at the shorter range seems to be more accurate than the further one, especially for C-band radar. Using the Monte Carlo simulation experiment, we find out that the sampling error of the bias between radar and gauge rainfall reduces nonlinearly with increasing raingage density. The accuracy can be improved considerably if the real-time bias adjustment is applied, making adjusted radar rainfall to be adequately good to apply for hydrological application.

Runoff Analysis for Weak Rainfall Event in Urban Area Using High-ResolutionSatellite Imagery (고해상도 위성영상을 이용한 도시유역의 소강우 유출해석)

  • Kim, Jin-Young;An, Kyoung-Jin
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.33 no.6
    • /
    • pp.439-446
    • /
    • 2011
  • In this research, enhanced land-cover classification methods using high-resolution satellite image (HRSI) and GIS in terms of practicality and accuracy was proposed. It aims for understanding non-point pollutant origin/loading, assessment the efficiency of rainfall storage/infiltration facilities and sounds water-environment management. The result of applying enhanced land-cover classification methods to the urban region verifies that roof and road area are including various vegetations such as roof garden, flower bed in the median strip and street tree. This accounts for 3% of total study area, and more importantly it was counted as impervious area by GIS alone or conventional indoor work. The feasibility of the method was assessed by applying to rainfall-runoff analysis for three weak rainfall in the range of 7.1-10.5 mm events in 2000, Chiba, Japan. A good agreement between simulated and observed runoff hydrograph was obtained. In comparison, the hydrograph simulated with land-use parameters by the detailed land-use information of 10m grid had an error between 31%~71%, while enhanced method showed 4% to 29%, and showed the improvement particularly for reproducing observed peak and recession flow rate of hydrograph in weak rainfall condition.

Performance Improvement of Computing Time of 2 Dimensional Finite Volume Model using MPI (MPI를 이용한 2차원 유한체적모형의 계산 성능 개선)

  • Kim, Tae Hyung;Han, Kun Yeun;Kim, Byung Hyun
    • Journal of Korea Water Resources Association
    • /
    • v.47 no.7
    • /
    • pp.599-614
    • /
    • 2014
  • In this study, two dimensional finite volume model was parallelized to improve computing time, which has been developed to be able to apply for the mixed meshes of triangle and quadrilateral. MPI scheme which is free from limitation of the number of cores was applied, and non-blocking point-to-point communication was used for fluxes and time steps calculation domain. The developed model is applied to analyze dam break in a L-shaped experimental channel with $90^{\circ}$ bend and Malpasset dam breach event to calibrate the consistency between parallelized model and existing model and examine the speed-up and efficiency of computing time. Computational speed-up about the size of the input data was considered by simulating 4 cases classified by the number of meshes, Consequently, the simulation results reached a satisfactory accuracy compared to measured data and the results from existing model, and achieved more than 3 times benefit of computational speed-up against computing time of existing model. Simulation results of 3 cases classified by the size of input data lead us to the conclusion that it is important to use proper size of input data and the number of process in order to minimize the communication overhead.

An Automated OpenGIS-based Tool Development for Flood Inundation Mapping and its Applications in Jeju Hancheon (OpenGIS 기반 홍수범람지도 작성 자동화 툴 개발 및 제주 한천 적용 연구)

  • Kim, Kyungdong;Kim, Taeeun;Kim, Dongsu;Yang, Sungkee
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.6
    • /
    • pp.691-702
    • /
    • 2019
  • Flood inundation map has various important roles in terms of municipal planning, timely dam operation, economic levee design, and building flood forecasting systems. Considering that the riparian areas adjacent to national rivers with high potential flood vulnerability conventionally imposed special cares to justify applications of recently available two- or three-dimensional flood inundation numerical models on top of digital elevation models of dense spatial resolution such as LiDAR irrespective of their high costs. On the contrary, local streams usually could not have benefits from recent technological advances, instead they inevitably have relied upon time-consuming manual drawings or have accepted DEMs with poor resolutions or inaccurate 1D numerical models for producing inundation maps due mainly to limited budgets and suitable techniques. In order to efficiently and cost-effectively provide a series of flood inundation maps dedicatedly for the local streams, this study proposed an OpenGIS-based flood mapping tool named Open Flood Mapper (OFM). The spatial accuracy of flood inundation map derived from the OFM was validated throughout comparison with an inundation trace map acquired after typhoon Nari in Hancheon basin located in Jeju Island. Also, a series of inundation maps from the OFM were comprehensively investigated to track the burst of flood in the extreme flood events.

GPR Survey for the Assessment of Scour Depth near Bridge Piers (세굴심 추정을 위한 교각 우물통 주변의 GPR 탐사)

  • Park, In-Chan;Cho, Won-Cheol;Lee, Chong-Guk
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2005.05b
    • /
    • pp.996-1000
    • /
    • 2005
  • 본 연구에서는 마포대교 확장 공사의 인해 일부 교각의 우물통 기초 주변 하상변화와 세굴 현상을 파악하기 위한 심도추정 방법으로 현재 다양하게 토목분야에서 적용되고 있는 치하투과레이더 탐사기법을 사용하였다. 교각 우물통 주변의 안정적인 GPR 탐사를 수행하기 위한 보조장비를 고안하여 마포대교 P6의 우물통 주변을 2004년 6월(1차)과 2004년 10월(2차)에 걸쳐 탐사를 실시하였으며, 탐사 기간 중 약 12,000 cms의 유출량이 발생하여 국부세굴과 하상 변화 가능성을 충분히 검토 할 수 있을 것으로 판단되었다. 수집된 자료를 통해 양질의 자료 획득을 위해서 자료의 보정 과정을 마친 후 각각의 구간에 대해서 1, 2차 탐사된 두 개의 자료를 비교 분석하였다. 전구간의 반사파를 이용하여 기존의 연구결과에서 얻어진 반사파의 양상(Beres and Haeni, 1991)과 비교한 결과 하상 표면은 미사 혹은 실트로 구성되어 있고 주요한 하상 하부 매질은 전석(boulder), 호박돌 등으로 이루어져 있었다. 그리고 1차 및 2차 탐사 자료와 DATAPCS의 세굴센서가 설치된 측점을 기준으로 심도 및 위치 보정을 한 결과 큰 오차는 발생하지 않았으며, 400 MHz 안테나를 활용하여 최대수심 약 10 m 이상 하상을 탐사할 수 있었다. 수심이 깊은 구간은 하상과 가까운 위치에서 탐사를 실시하여 양질의 하상 변화 양상을 파악할 수 있어 하상 재료의 정성적인 평가를 높일 수 있도록 하였다. 마포대교의 탐사 대상 교각 우물통 주변은 계획홍수량의 1/3 수준으로 비교적 적은 홍수량이 발생한 2004년의 호우사상으로 인해 일부구간이 약 $10\~20\;cm$ 정도의 퇴적과 세굴 영향이 나타난 것을 제외하고는 유의할 만한 세굴과 하상 변화가 발생하지 않고 매우 안정적인 상태를 보이고 있으며 되메움이나 두드러진 퇴적층의 양상 또한 확인할 수 없었다. 대상구간에 설치한 유속계 최대유속이 2.0 m/s 이상 발생하였지만 우물통 주변의 자갈 및 호박돌 등과 같은 평균입경이 큰 유사의 이동에 절대적인 한계유속을 초과하지 못한 것으로 판단된다. GPR 탐사의 적용 한계성을 극복한 본 연구는 홍수 전$\cdot$후의 하상변화 및 최대세굴심, 되메움 깊이 및 범위 등의 세굴현상을 현장탐사를 바탕으로 현재 다양하게 적용하고 있는 세굴 실험식과 비교 분석함으로써 우물통 주변의 효율적인 세굴 보호 대책을 강구하는 목적으로 그 활용성을 증대할 수 있을 것이다.

  • PDF

Non-stationary Frequency Analysis with Climate Variability using Conditional Generalized Extreme Value Distribution (기후변동을 고려한 조건부 GEV 분포를 이용한 비정상성 빈도분석)

  • Kim, Byung-Sik;Lee, Jung-Ki;Kim, Hung-Soo;Lee, Jin-Won
    • Journal of Wetlands Research
    • /
    • v.13 no.3
    • /
    • pp.499-514
    • /
    • 2011
  • An underlying assumption of traditional hydrologic frequency analysis is that climate, and hence the frequency of hydrologic events, is stationary, or unchanging over time. Under stationary conditions, the distribution of the variable of interest is invariant to temporal translation. Water resources infrastructure planning and design, such as dams, levees, canals, bridges, and culverts, relies on an understanding of past conditions and projection of future conditions. But, Water managers have always known our world is inherently non-stationary, and they routinely deal with this in management and planning. The aim of this paper is to give a brief introduction to non-stationary extreme value analysis methods. In this paper, a non-stationary hydrologic frequency analysis approach is introduced in order to determine probability rainfall consider changing climate. The non-stationary statistical approach is based on the conditional Generalized Extreme Value(GEV) distribution and Maximum Likelihood parameter estimation. This method are applied to the annual maximum 24 hours-rainfall. The results show that the non-stationary GEV approach is suitable for determining probability rainfall for changing climate, sucha sa trend, Moreover, Non-stationary frequency analyzed using SOI(Southern Oscillation Index) of ENSO(El Nino Southern Oscillation).