• Title/Summary/Keyword: 비용관리

Search Result 5,204, Processing Time 0.034 seconds

Strategies for developing the Appropriation Method of the Construction Quality Cost (건설공사 품질관리비용의 구성요소 및 현실화를 위한 계상방법에 대한 고찰)

  • Park, Kyeong-Geun;Park, Yun-Chul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.3
    • /
    • pp.101-111
    • /
    • 2011
  • Clients ought to Appropriate the cost of quality management for contractors based on Construction Technology Management Act. The costs of safety management and environment reservation are separately estimated. and the quality management cost is added up to secure the construction quality required on sites. However, the sufficient cost for quality management was not allowed to the contractors, due to the viewpoints of the clients that the quality management should be one of the duties of contractors. In addition, an Account-related legislation enacted a provision of the labor cost of quality management as the one that should be included in the indirect labor cost. From the continuous survey the quality management cost is currently estimated by 0.2% of the total project cost and the contractors protest the portion of the quality management cost is insufficient. Thus, this paper aimed to provide the bases of estimation of the actualized quality management cost considering the viewpoint of contractors.

A Simple Dynamic Model of Maintenance Expenditures : Theory and Empirical Evidence (내구재 관리비용의 동적인 행태 연구 - 이론 및 경험적 분석 -)

  • 현진권
    • Journal of Korean Society of Transportation
    • /
    • v.8 no.1
    • /
    • pp.119-128
    • /
    • 1990
  • 교통자산과 같은 내구재는 일정 기간 동안의 수명을 가지게 된다. 이 기간 동안에 내구재는 어떠한 형태로 소비되어 지고 이에 따라 내구재는 효율성을 잃어 간다. 내구재를 효율적으로 사용하기 위해서는 적절한 관리를 필요로 한다. 본 연구는 내구재를 효율적으로 사용하기 위해 필요한 관리비용의 동적형태를 이론적으로 고찰한 다음, 미국에서의 업무용 비행기의 관리비용자료를 사용하여 경험적인 결과를 제시한다. 본 연구의 결과는 다음과 같다. (1) 관리비용은 시간이 감에 따라 줄어든다. 그러나 관리비용의 잠재가격(Shadow Price)에 대한 비율은 여러 가지 외적변수들에 결정된다. (2) 미국에서의 업무용 비행기의 시장가격에 대한 관리비용의 비율은 시간이 감에 따라 늘어난다.

  • PDF

An Assessment Method of Asset Worth and Value Cost for the Infrastructure Asset Management Information Systems (공공시설 자산관리정보시스템에서 자산값어치 및 가치비용 산정방법에 관한 연구)

  • Choi, Won-Sik;Nah, Hei-Sook;Jeong, Seong-Yun;Choi, Young-Min
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2012.04a
    • /
    • pp.1369-1372
    • /
    • 2012
  • 공공시설 자산관리는 새로운 시설물 유지보수 개념으로 유지관리체계를 넘어 자산의 가치를 높이는 관리체계이다. 이 연구의 목적은 도로 및 교량 같은 공공시설에 자산관리체계를 지원하는 정보시스템을 구축하는데 필수적인 자산의 가치와 가치비용을 평가하는 방법을 개발하는 것이다. 따라서 자산가치를 자산평가 척도인 LoS(Level of Service)를 바탕으로 금전적인 값어치로 공학적 관점에서 계산하는 이론적 방법을 연구하였다. 가치개념을 정립하기 위해 성능은 LoS를 적용하였고, 비용은 유지관리를 위한 직접 투입비용을 적용하였다. 연구목적상 기존 연구결과인 자산비용과 가치비용의 개념을 적용하였으며 합리적인 시설물의 가치비용을 추정하기 위해 추가적으로 자산의 규모, 시설물의 현재 상태, 투입예산의 효과, 시설물의 중요도를 고려하도록 제안하였다. 제안한 자산비용을 바탕으로 하는 가치비용이 최대가 되는 유지관리대안을 선정한다면 최적의 시나리오가 될 것이다.

A Study on Lifecycle Cost Model for Electronic Records & Archival Management (공공 전자기록의 생애주기 기반 관리 비용 모형에 관한 연구)

  • Hyun, Moonsoo
    • Journal of the Korean Society for information Management
    • /
    • v.30 no.1
    • /
    • pp.151-178
    • /
    • 2013
  • This study aims to propose a lifecycle cost model for electronic records & archival management. For this purpose, the study identified cost elements based on analysing public records & archival management activities and proposed cost factors for management by applying data gathered from records centers & archives. The study employed various methods: desk research, activity analysis, a cost information survey and interviews with experts in digital preservation, and records/archival management. The study made the first step to the cost studies in electronic records management in Korea. It is expected to update the CoMMPER model and redefine activities of electronic records management. Further case studies based on the model is required.

Cost Analysis of Mobility Management Schemes for IP-based Next Generation Mobile Networks (IP기반의 차세대 모바일 네트워크에서 이동성관리 기법의 비용분석)

  • Kim, Kyung-Tae;Jeong, Jong-Pil
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2012.04a
    • /
    • pp.488-491
    • /
    • 2012
  • 모바일 유저를 위한 무결점 전송 서비스는 최근에 모바일 통신에 있어 가장 중요한 논제 중 하나가 되었다. 차세대 무선 네트워크(Next Generation Wireless Networks, NGWN)상에서의 무결점 서비스는 이동단말(MN, Mobile Node)에게 광범위한 로밍을 효율적으로 제공하는 이동성관리가 매우 중요하게 되었다. MIPv6(Mobility IPv6)는 IETF(The Internet Engineering Task Force)에 의해 제안된 이동성관리 기법들 중 하나이다. IPv6기반에서 이동성관리 기법들은 다양한 형태로 발전되어왔다. 각각의 관리 기법들은 이동단말에서의 데이터 이동에 직접적인 관여를 하고 있다. 이 논문에서 두 가지의 이동성관리 평가기법에 대해 제안하고자 한다. 이동성관리를 위한 다양한 프로토콜에서 네트워크상의 핸드오버나 패킷의 전송절차를 수행할 때, 데이터의 전송절차에 대하여 분석하며 또 시그널링의 비용을 산정함에 있어 연산처리하는 노드들과 그 노드간의 파라미터들을 이용하여 가장 효율적인 방법으로 분석모델링을 제안한다. 이동성 프로토콜의 시그널링 비용과 그 비용을 구성하는 각각의 파라미터들을, 수치적 결과를 통해서 각각의 프로토콜들의 비용을 분석한다. 비용은 시그널링 비용과 패킷전송의 합이며, 각각의 이동성관리 기법에 적용하여 그 비용을 분석한다. 이동성 관리의 다양한 기법들 중 가장 최근에 제안되어지고 있는 네트워크 기반의 이동성 프로토콜이 전체적인 비용측면에서 더 우수한 결과를 보여준다.

A Case Study on the Improvement Plan for Cost Prediction of Educational BTL Project based on Running Cost Analysis (교육시설 BTL사업의 유지관리비용 비교분석을 통한 비용추정 개선방안에 관한 사례연구)

  • Park, Moon-Sun;Song, Chang-Youg;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.6
    • /
    • pp.139-149
    • /
    • 2007
  • The purpose of this study is to examine the problem of BTL(Build Transfer Lease) projects through comparative analysis on running costs, focusing on primary school, junior and senior high school education facilities, and then to provide useful information on the estimation of running costs by suggesting valid cost criteria. For this, eight schools from A and B consulting firms were sampled from capital region and other areas. Sampled schools were classified into four categories according to school grade, and running cost data are collected and analyzed from relative view points. The results of this study are as follows: 1) running costs which are analyzed by categories show some difference among sub-items, 2) major problems related to running cost prediction of BTL projects are revealed and improvement schemes are suggested for two groups (Owner and Project applicants).

The Study of the Integrated Cost Audit Model for the Efficiency of IT project risk management (통합비용감리모델을 통한 IT사업위험관리 효율성에 관한 연구)

  • Yoon, Seong-Jeong;Han, Gi-Jun;Kim, Dong-Su
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2009.05a
    • /
    • pp.266-269
    • /
    • 2009
  • 현재 대한민국 사업(IT Project)수행 시 다양한 관리 방법론이 연구 활용 되고 있다. 그러나 다양한 사업(IT Project)관리 방법론을 적용한다 하더라도 효과 효율성 측면에 대한 실증분석이 필요하다. 왜냐하면 그러한 방법론으로 비용적 측면에서 효과 효율 성을 발휘할 것인지 측정이 없었기 때문이다. 본 논문에서 시뮬레이션 하는 비용측정은 사업초기에 책정한 비용과, 분석/설계가 끝나는 시점의 비용, 사업 종료 후 비용을 측정할 것이다. 이때, 사업관리의 위험관리요소와 통합비용감리모델을 제시하여 감리점검항목을 도출할 것이다. 이를 통하여 효과 효율 성을 도출할 것인지 검증할 것이다. 효과 성 및 효율 성이 본 논문에서 제시한 통합비용감리모델을 통하여 비용에 대한 누수 및 과다산출이 도래를 막을 수 있는지 논하고자 한다.

  • PDF

The Analysis of the Location Management Strategy Based on the Call Arrival Probability(CAP) in Mobile Communication (이동 통신에서 호 수신 확률에 근거한 위치 관리 기법의 분석)

  • Park, Sun-Young;Jang, Seong-Sik
    • Journal of the Institute of Electronics Engineers of Korea TC
    • /
    • v.42 no.7 s.337
    • /
    • pp.1-6
    • /
    • 2005
  • Now that the reduction of the cell size in order to serve the increasing subscribers has raised the frequency of the location update, it has increased the cost of location management. In this paper, we show that the location management strategy based on the call arrival probability(CAP) can reduce the cost of the location management by analyzing that cost in this strategy which was proposed in [1] to reduce the cost of the location management in mobile communication. And we compare the location management cost by analyzing with that by simulating.

SE, CM, EVM 통합을 통한 사업 관리 향상 방안

  • Seok, Yeon-Suk;Gang, Seong-Jin;Park, In-Gyeong;Gwon, Yong-Su
    • 한국경영정보학회:학술대회논문집
    • /
    • 2007.06a
    • /
    • pp.1023-1029
    • /
    • 2007
  • 우리는 국가 경쟁력의 한 분야인 사업관리에 있어 계획, 수행, 성과관리, 개선에 최적의 프로세스 보유가 요구된다. 그러나 Project관리체계의 현 실태는 일정관리, 범위관리, 비용관리에 초점을 맞춘 일정관리체계, WBS(Work Breakdown Structure) 및 OBS(Organizational Breakdown Structure)관리, 비용관리체계의 부분 통합 혹은 서로의 연계 정도이다. 본 연구는 최적의 사업관리를 위하여 계약관리에 체계공학을 연계하여 계약 전에 WBS, IMP/IMS(Integrated Master Plan)/(Integratcd Master Schedule), TPM(Technical Performance Measurement) 등의 SEP(Systems Engineering Plan)와 계약 후의 이행을 검증 할 수 있는 과정의 Guideline을 제시하고, IEEE 1220, ANSI/EIA 632 순기 의거 개념설계부터 통합시험에 이르는 체계공학 순기에 따른 비용예측이 가능한 USC(University of Southern CalIfornia) 대학의 COSYSMO (Constructive Systems Engineering Cost ModeI)를 소개하고 적용 가능성을 고찰하며, Project의 전순기에 걸쳐 TPM 혹은 Quality를 비용과 일정에 통합하여 관리하는 PBEV(Performance Based Earned Value)모델을 소개하고 적용 가능성을 제시한다. Project 관리에 있어 System 차원을 강조한 SE(Systems Engineering), 비용예측의 CM(Cost Management), 성과관리를 위한 EVM(Earned Value Management)의 통합은 사업 관리에 역량을 강화하며 경쟁력을 향상 시킬 수 있는 적절한 접근으로 사료된다.

  • PDF

A Study of IT Asset Management (IT 자산관리에 관한 연구)

  • Choi, Dong-Jin
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2022.01a
    • /
    • pp.141-143
    • /
    • 2022
  • IT 자산관리(ITAM, IT Asset Management)는 조직이 소유한 IT 자산과 관련된 모든 이력 변경 정보, 비용, 계약 및 구매/리스 데이터를 관리하는 것이다. 자산 취득 및 처분에 관한 기술, 재무 및 계약 정보를 취득하고 통합한다. 그리고 유지하는 과정. 비즈니스의 효율성과 효율성을 높이기 위해 IT 인프라의 서비스 및 리소스에 대한 자산 관리의 4가지 요소(4C, 특성: 자산 수명 주기 정보, 구성: H/W와 S/W 정보, 계약: 서비스 및 보증, 종합관리: 보증 정보, 비용 및 재무 정보)는 회사 인프라 자원의 TCO 및 ROI를 개선하고 생산성의 범위를 확장하는 것을 목표로 한다. IT 자산 관리의 필요성은 사업에 필요한 IT 자산 정보 제공, 비용 관리, 구매 결정에 필요한 정보 제공, 소프트웨어 라이선스 및 하드웨어 자원의 재활용 촉진, 장치 노후화로 인한 추가 비용 방지를 위한 것이다. 비용 예측 및 관리, 내부 통제 및 외부 감사 대응, 사업부별 IT 비용 및 활용도 분석을 유지 및 지원한다. 사업부의 IT 자원 사용으로 인한 문제는 업무 효율성을 저하시키고 IT 부서의 업무를 증가시키며 결과적으로 기업의 비용을 증가시키며 이것이, IT 자산 관리의 현실이다. 본 논문에서는 적용 사례를 통해 더 나은 관리 방안을 마련하기 위한 방법을 제안한다.

  • PDF