• Title/Summary/Keyword: 북항

Search Result 107, Processing Time 0.022 seconds

Improvement Plan on Operation of O-2 Anchorage at the Busan North Port (부산 북항 O-2 정박지의 운영개선 방안)

  • Song, Gye-Eui
    • Journal of Korea Port Economic Association
    • /
    • v.25 no.1
    • /
    • pp.29-46
    • /
    • 2009
  • According to construction work of No. 2 Lotte world, the alternative pier is under construction in Dongsam-dong Yeongdo-gu to accommodate small boats. As a result of that, in order to procure route of small boats passage,0-2 Anchorage used to bunkering or waiting for berth should be reduced, 220m. It is expected that the risk of passage and congestion around the anchorage could be increased because of the traffic of small boat using the alternative pier. Therefore, it is needed to enlarge the O-2 Anchorage 250m toward to inner breakwater. According to result of analyzing traffic circumstance and weather condition of anchorage near the Busan inner fairway, and to procure of alternative anchorage in order to resolve the problem caused by reduction of O-2 Anchorage, no problems incurred. In conclusion, reduction & enlargement of area of new O-2 Anchorage is expected to resolving of congestion & reducing of risk of traffic at O-2 Anchorage, and to operating O-2 Anchorage, efficiently.

  • PDF

Comparison and Analysis of Operation & Facilities Capacity of North Port of Busan (부산북항의 운영 및 시설능력 비교분석)

  • Kim Woo-sun;Choi Yong-suk;Ha Tae-Young
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2005.10a
    • /
    • pp.313-317
    • /
    • 2005
  • The purpose of this paper is grasp of busan port present situation. In particular, It is compare with facility and operation aside of abroad competitition port and busan new port, indivisual terminal of busan north port.

  • PDF

Numerical Simulation of Surge - Wave Combined Inundation at Mokpo North Harbor (목포 북항에서 풍파에 의한 해수범람의 수치 모의)

  • Lee, Jung Lyul;Kang, Ju Whan;Yoon, Jong Tae
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.3B
    • /
    • pp.307-313
    • /
    • 2008
  • Tidal amplification by construction of sea-dike and sea-walls had been detected not only near Mokpo North Harbor but also at Chungkye Bay which is connected with Mokpo North Harbor by a narrow channel. This brings about increase of tidal flat area and in particular increase of runup height and inundation area during storms. In this study, a simulation process is composed of wind wave generation model for large area and wave inundation model for small coastal zone. The nonlinear version of mild-slope equation is modified for simulating wind-driven surge and wave inundation at a small area. The models are applied to Chungkye Bay, and possible inundation features at Mokpo North Harbor are investigated.

Evaluation of the Traffic Congestion in the Passage I of Pusan Harbour due to the Opening of the Extended Terminal adjacent to the Gamman Terminal and Other Port Developments (감만부두 확장구역 개장과 기타 항만개발이 장래 부산 북항에 미치는 해상교통 혼잡도 평가에 관하여)

  • 구자윤;여기태
    • Journal of Korean Port Research
    • /
    • v.14 no.1
    • /
    • pp.27-35
    • /
    • 2000
  • In Pusan Harbour, new port development projects are implemented such as the Extended Terminal adjacent to the Gamman Terminal, Pusan New Port, the Navy $\bigcirc$$\bigcirc$ piers, etc. which will require new marine traffic environments in the Passage I of Pusan Harbour. Specially, the turning basin of the Extended Terminal adjacent to the Gamman Terminal has been designed to overlay the Passage I of Pusan Harbour, which will interrupt the inbound traffic flow and the results will be worried to decrease the efficiency of port operation. Therefore, this paper will be aimed to evaluate the traffic congestion in the Pusan Passage I due to the opening of new ports within Pusan Harbour in 2006 and 2011 by using computer simulation based the queueing theory.

  • PDF

A Proposal on Waterfront Development of Pusan North Port (부산북항에서의 도심형 워터프런트 개발방향에 관한 연구)

  • 조용수;조은석;이호수
    • Journal of Korean Port Research
    • /
    • v.13 no.2
    • /
    • pp.351-364
    • /
    • 1999
  • This study aims at advancing waterfront planning and development of North Port or of Pusan and attempting to establish an identity through the analysis and case studied of waterfront development of foreign countries. This study is based on Pusan urban harbor plan and the case study which was investigated the relational port with an urban area to find a model of development method and procedure of urban waterfront renewal. The approach of this study is to classify diversified cases and to suggest elements after reviewing successful cases. The point in the waterfront development plan of North Port of Pusan is how to secure an amenity on the edge and provides a comprehensive theoretical base such as skyline, coastline, green area, accessibility scenery, landmark, open space, and so on. The results of this stud is useful for the planner to develop more and systematic approaches which could utilize waterfront. Waterfront development will be a new change of urban development for Pusan.

  • PDF

부산남항 재창조를 위한 사업추진전략에 관한 연구

  • 최혜린;강영훈;이한석
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2023.11a
    • /
    • pp.77-79
    • /
    • 2023
  • 국내 대표 해양도시인 부산시는 도시의 이미지를 향상시키고 경쟁력을 갖추기 위해 북항재개발지역과 원도심지역을 연계한 복합형 재생사업을 추진하고 있다. 부산남항은 북항과 원도심지역에 맞닿아있지만 고유의 특성이 고려되지 못하고 복합형 재생사업에 종속된 개발 압력을 받아왔다. 최근 해양관광벨트 형성에 있어 부산남항의 입지적 중요성과 북항·원도심지역과의 연계 필요성이 대두되며 부산남항을 대상으로 다양한 개발계획이 수립되고 있다. 항만재개발사업의 경우 대규모 SOC사업으로 추진과정에서 이해관계자 간의 갈등, 재정 문제 등의 여러 문제가 야기되는데 이러한 문제를 해결하지 못하면 사업이 표류 될 가능성이 크다. 따라서 본 연구는 부산남항 재창조를 위해 필수적인 항만재개발사업의 원활한 진행을 위한 추진전략과 민간참여방안을 제시하였다.

  • PDF