• Title/Summary/Keyword: 부본선 건설

Search Result 11, Processing Time 0.024 seconds

Fundamental study on enlargement method of existing subway tunnel during operation for sidetrack construction (부본선 건설을 위한 기존 지하철 터널의 운영 중 확폭 방안에 대한 기초연구)

  • Lee, Hyobum;Koh, Sung-Yil;Jun, Jonghun;Yoon, Hee Taek;Yi, Na Hyun;Choi, Hangseok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.1
    • /
    • pp.59-76
    • /
    • 2020
  • As a continuous increase in demand for the transportation infrastructure in the metropolitan area, the renovation of existing metropolitan and urban railway lines for the rapid transport system requires the construction of sidetrack that can operate local and express trains simultaneously. However, the construction of sidetrack after stopping the operation of the existing subway line causes a lot of economic losses, therefore it is essential to study the tunnel enlargement scheme during the operation of the existing subway tunnel. Accordingly, in this paper, basic research on the enlargement plan of the existing subway tunnel was carried out for the renovation of the existing subway line. In order to investigate the method for the sidetrack construction, the Government Complex Gwacheon station on the Gwacheon line of subway line 4 was selected as a virtual research station. Subsequently, four construction plans including tunnel cross-sectional plan for each section were reviewed and constructability and economic feasibility were compared. Finally, the stability assessment was conducted for the selected construction plan which was considered to be relatively unstable by 3-D full numerical analysis considering the sidetrack construction process.

A Performance Assessment of Urban Arterial Highway Interchanges (도시간선도로에서의 인터체인지 성능 비교 연구)

  • Lee, Ui-Eun;Lee, Jae-Yong
    • Journal of Korean Society of Transportation
    • /
    • v.24 no.3 s.89
    • /
    • pp.51-61
    • /
    • 2006
  • Interchanges are passages for vehicle and pedestrians and a gateway to nearby facilities, and a place to stay of vehicle and Pedestrians. Interchange traffic must be able to navigate well for safety and convenience. Traffic safety and efficiency are influenced by the interchange. In this study, relative delays of vehicles are compared by changing traffic interchanges. the volume of traffic, the number of lanes, the rate of left turns vehicle on the interchanges of urban arterial roads. The object of this study is to compare Grade crossing interchange, Diamond interchange. Roundabout interchange. SPUI(Single Point Urban Interchange), Echelon interchange). Echelon interchange. By VISSIM Simulation, this study drew the relative delay value of every scenario and compared the delay value of each vehicle considering construction expenses. Through this comparison study, ideal interchange is dependent on the volume of traffic, the number of lanes, and the rate of left turns.

Numerical analysis study of reinforced method (loop type) at the double-deck tunnel junction (복층터널 분기부에서의 보강공법(루프형 강선)에 따른 수치해석 연구)

  • Lee, Seok Jin;Park, Skhan;Lee, Jun Ho;Jin, Hyun Sik
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.5
    • /
    • pp.823-837
    • /
    • 2018
  • Congestion of the city with the rapid industrial development was accelerated to build complex social infrastructure. And numerous structures have been designed and constructed in accordance with these requirements. Recently, to solve complex urban traffic, many researches of large-diameter tunnel under construction downtown are in progress. The large-diameter tunnel has been developed with a versatile double-deck of deep depth tunnel. For the safe tunnel construction, ground reinforcement methods have been developed in the weakened pillar section like as junction of tunnel. This paper focuses on evaluation of the effects of new developed ground reinforcement methods in double-deck junction. The values of reinforcement determined from the existing and developed methods were compared to each other by numerical simulation.

Preliminary Study for Risk Assessment Estimation of Urban Underground Connect Section Using VISSIM : Comparison of Characteristics Based on Diverge/Merge (VISSIM을 활용한 도심 지하도로 연결로 위험도 산정을 위한 기초연구 : 분·합류부 기준 특성 비교)

  • Park, Sang Hyun;Lee, Jin Kak;Yang, Choong Heon;Kim, Jin Guk
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.20 no.5
    • /
    • pp.59-74
    • /
    • 2021
  • The domestic road space is reaching the limit of planar space distribution, and Increasingly, the importance of three-dimensional space distribution through the development of underground space. therefore, In this study, a study was conducted on a traffic control method that can safely induce two different traffic flows in the connection between the ground road and the underground road. Through VISSIM, we calculated the appropriate amount of outflow and inflow traffic compared to the capacity of the main line when there is a Merge/Diverge section in the underground road. and Through the analysis of the number of conflicts, the appropriate traffic control level for safety in the underground, A basic study was conducted on the level of risk in the underpass according to the level of delay in the ground part through the analysis of the delay scenario of the ground road.

Analysis of the peak particle velocity and the bonding state of shotcrete induced by the tunnel blasting (발파시 터널 숏크리트의 최대입자속도와 부착상태평가 분석)

  • Hong, Eui-Joon;Chang, Seok-Bue;Song, Ki-Il;Cho, Gye-Chun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.12 no.3
    • /
    • pp.247-255
    • /
    • 2010
  • Bonding strength of shotcrete is a significant influential factor which plays the role of collapse prevention of tunnel crown and of debonding prevention of shotcrete induced by the blasting vibration. Thus, the evaluation of the shotcrete bonding state is one of the core components for shotcrete quality control. In this study, the peak particle velocities induced by blasting were measured on the shotcrete in a tunnel construction site and its effect on the bonding state of shotcrete is investigated. Drilling and blasting technique was used for the excavation of intersection tunnel connecting the main tunnel with the service tunnel. Blast-induced vibrations were monitored at some points of the main tunnel and the service tunnel. The shotcrete bonding state was evaluated by using impact-echo test coupled with the time-frequency domain analysis which is called short-time Fourier transformation. Analysis results of blast-induced vibrations and the time-frequency domain impact-echo signals showed that the blasting condition applied to the excavation of intersection tunnel hardly affects on the tunnel shotcrete bonding state. The general blasting practice in Korea was evaluated to have a minor negative impact on shotcrete quality.

Estimating Acceleration and Deceleration Lane Lengths by Analyzing Vehicle Speed Variation of Rest Areas for Drowsy Drivers (고속도로 졸음쉼터 진·출입 차량 주행속도 분석 및 적정 가·감속차로 길이 산정 연구)

  • Han, Dajeong;Kim, Eungcheol
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.17 no.6
    • /
    • pp.54-66
    • /
    • 2018
  • In this study, vehicle speeds at acceleration and deceleration lanes of rest areas for drowsy drivers were investigated to analyze effects of acceleration and deceleration lane lengths, grades and curve radius. In addition, we used VISSM to analyze proper lengths of rest area's acceleration and deceleration lanes. Several VISSIM scenarios with different lengths of acceleration and deceleration lane were constructed. Through VISSIM simulation, we collected individual vehicle speed data to analyze speed changes by different lengths of acceleration and deceleration lanes. As a result of the vehicle speed change investigation, grades and curve radii of the rest area affected the speed, most of all lengths of acceleration and deceleration lane showed a great effect on the vehicle speed. In the case of short lengths of acceleration and deceleration lane, speed variation among vehicles was significant. If the deceleration lane length is short, the vehicle enters a state in which the speed is not sufficiently reduced, and if the acceleration lane length is short, the vehicle enters a state in which the speed is not sufficiently accelerated showing high risks of conflicts and accidents. It is recommended that 245m length of deceleration lane and 370m length of acceleration lane should be installed at least to secure safety and manage conflicts relevantly.

Research on the support system and reinforcement range of cross passage tunnel (피난연결통로터널의 지보패턴 및 보강범위 연구)

  • Jung, Min;Han, Ki-Hwan;Park, Jin-Won;Baek, Kyung-Min;Moon, Hoon-Ki
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.12 no.3
    • /
    • pp.201-213
    • /
    • 2010
  • Recently, plans of tunnel and construction have increased. Unfortunately, the more we have tunnels, the more we have accidents in there. Because an accident or a fire in the tunnel is fatal to user safety, social concerns are focusing on the disaster prevention facilities. Cross passage tunnel is regarded as one of the useful disaster prevention facilities, which is increasing, while there were only few studies about the support system. This study tried to verify whether the support system is appropriate or not with empirical methods-theoretical methods and back analysis using measurement data. Additionally, we also looked into the range of reinforcement in accordance with strength/stress ratio of rock mass.

Risk analysis for sidetrack construction during subway tunnel operation (기존 지하철 터널 운영 중 대피선 건설 시공 리스크 분석)

  • Jun, Jonghun;Chung, Heeyoung;Koh, Sung-Yil;Yoon, Hee Taek;Yi, Na Hyun;Choi, Hangseok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.4
    • /
    • pp.401-417
    • /
    • 2020
  • As an increasing demand for rapid railway transportation, the construction of sidetrack is inevitable to operate local and express trains simultaneously. However, the current technologies for the sidetrack construction method require a long construction period by interrupting the operation of the existing subway line, as well as cause a huge economic loss. Thus, it is necessary to study the sidetrack construction method under the special situation that the subway is in operation and to analyze the risk of the existing tunnel enlargement process for the sidetrack construction. Therefore, in this paper, the Government Complex Gwacheon station on Subway Line 4 was considered as a target station for the virtual sidetrack construction and the optimal sidetrack construction plan was derived. Subsequently, the application of risk management process was carried out in the order of identifying risk, risk response planning, performing a risk analysis, risk monitoring and control for potential risk events during the construction of sidetrack under the subway operation. A total of eight potential risk events and risk mitigation methods were selected, and a risk assessment matrix was established using the five-step risk probability and impact level criteria to perform the risk assessment including residual risks. Based on the results of the risk assessment, the risk grade and the reduction effect of each risk mitigation method were confirmed.

A Study on Shrinkage Crack of Steel Composite Concrete Box Structure (Transfer Girder) (강합성 콘크리트 박스구조물(트랜스퍼 거더)의 건조수축 균열에 대한 연구)

  • Choi, Jung-Youl;Kim, Dae-Ill
    • The Journal of the Convergence on Culture Technology
    • /
    • v.8 no.6
    • /
    • pp.685-691
    • /
    • 2022
  • This study was based on the steel composite concrete box structure (Transfer girder) which was installed to support the skyscrapers directly above the subway line. In this study, it was analytically proved that the cause of cracks on the steel composite concrete box structure were the shrinkage cracks by comparing the results of crack investigation and numerical analysis. As the results, it was found that the internal temperature difference between concrete and steel members occurred according to the shape of the steel frame embedded in concrete, the location of vertical stiffener, and the closed section area. The narrower spacing of vertical stiffener was occurred the internal temperature concentration of the structure and the temperature difference increased. And the location of higher thermal strain and temperature were similar to the location of actual cracks by the visual inspection. Therefore, the internal temperature concentration parts were formed according to the presence and spacing of the vertical stiffeners and the inspection passage in the central part of the structure. The shrinkage cracks were occurred by the restrained of temperature expansion and contraction of the concrete. As the results of this study, it was important to separate and manage the non-structural cracks caused by shrinkage and the structural cracks in the maintenance of serviced steel-composite concrete structures.

Design Standard for Lane Operation in Bridges and Tunnels (교량 및 터널구간 차로운영 설계기준)

  • You, Ho-In;Oh, Young-Tae;Lee, Choul-Ki;Chung, Woo-Hyun
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.6 no.3
    • /
    • pp.33-44
    • /
    • 2007
  • Prohibition of lane changes in bridges and tunnels have been many problems in throughputs of expressways caused by heavy vehicles and slow-moving traffics. Nevertheless, those are constructed actively by the general trends, which are preservation of environment and ecosystem are more important, because mountainous districts are about 70% across the whole extent of Korea. In this paper, the proper design standards for permission of lane changes in bridges and tunnels classified into structure, safe, and driver's conveniences are suggested as follows. 1. Right shoulder should have more than 2.5m in bridges and tunnels. 2. Sufficient equipments of guidance like as directional signs, fingerposts, variable message signs, and markings should be established to smooth and safe lane changes of drivers. 3. Snow melting systems should be established in bridges worried about freezing. 4. Tunnels must be not only satisfied standards for prevention of disasters (2004.11) and lighting rules (KSA 3703), but also established anti-freezing facilities in entrance and exit. 5. The drivers should have honed on their car lights.

  • PDF