• Title/Summary/Keyword: 부등기둥축소

Search Result 21, Processing Time 0.022 seconds

Reduction of differential column shortening due to outrigger (아웃리거에 의한 부등기둥축소 감소효과)

  • Shin, Seung-Hak;Kim, Han-Soo
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2010.05a
    • /
    • pp.149-150
    • /
    • 2010
  • In this study, optimal location of outrigger for reduction of differential column shortening has been proposed. Optimal location of outrigger for reduction of differential column shortening is the position that the largest differential column shortening develops when the outrigger is not installed.

  • PDF

실례를 통한 초고층 건물 기둥의 부등축소량 예측 및 시공오차 보정

  • 송진규
    • Computational Structural Engineering
    • /
    • v.10 no.1
    • /
    • pp.62-69
    • /
    • 1997
  • 본 고에서는 고층건물의 건설과정에서 발생하는 시간의 진행에 따른 기둥의 (장기)변형을 정확히 예측하고 이를 시공중에 보정하도록 함으로써 비구조요소의 강도와 사용을 만족시키기 위한 방법론을 제시하였다. 이 방법론은 실험적 통계치를 기초로 한 약산해법으로서 실무에 쉽게 적용할 수 있다. 52층 RC 건물에 대한 적용 결과 기둥에 발생하는 축소량에 가장 큰 영향을 미치는 것은 탄성변형이며, 건조수축의 효과가 가장 미세한 것으로 나타났다. 그러나, 2년 이상의 장기 변형이 지속될 경우 크립변형의 영향이 탄성변형에 비해 더욱 증가할 것으로 판단된다. 고층의 RC건물인 경우 기둥간 부등축소량의 최대치(=최대 시공오차)는 중간층 근처에서 발생하는 것으로 나타났다.

  • PDF

Average Correction for Differential Column Shortening (평균을 이용한 고층건물의 부등 축소량 보정기법)

  • Park, Sung-Woo;Choi, Se-Woon;Park, Hyo-Sun
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.588-591
    • /
    • 2010
  • 건물의 수직부재는 시공 후 시간이 지남에 따라 수축하게 된다. 이러한 현상을 기둥축소 현상이라고 부르며 원인으로는 탄성, 비탄성, 환경적 요인 등 여러 가지가 있다. 각 수직 부재에 걸리는 하중의 종류와 크기, 그리고 처한 환경 등이 다르므로 부재별로 축소량에 차이가 있게 된다. 이로 인하여 건물은 여러 가지 피해를 입게 된다. 이에 따라 수직부재인 기둥과 전단벽의 축소량을 예측하는 연구가 활발히 진행되고 있다. 그러나 예측된 축소량을 보정하는 기법에 관한 연구는 그리 많지 않다. 따라서 본 논문에서는 선행 연구되었던 기존의 부등 축소량 보정 기법의 한계에 대하여 지적하고 새로운 보정기법인 평균을 이용한 부등축소량 보정기법을 제시하였다. 본 논문에서 제시한 보정기법의 효용성을 입증하기 위하여 같은 예제에 대하여 기존의 방법과 본 논문에서 제시한 방법을 이용한 결과들을 비교, 정리하였다.

  • PDF

Probabilistic Prediction and Field Measurement of Column Shortening for Tall Building with Bearing Wall System (초고층 내력벽식 구조물의 기둥축소량에 대한 확률론적 예측 및 현장계측)

  • Song, Hwa-Cheol;Yoon, Kwang-Sup
    • Journal of the Korea Concrete Institute
    • /
    • v.18 no.1 s.91
    • /
    • pp.101-108
    • /
    • 2006
  • Accurate prediction of time-dependent column shortening is essential for tall buildings in both strength and serviceability aspects. The uncertainty associated with assumed values for concrete properties such as strength, creep, and shrinkage coefficients should be considered for the prediction of time-dependent column shortening of tall concrete buildings. In this study, the column shortenings of 41-story tall concrete building are predicted using monte carlo simulation technique based on the probabilistic analysis. The probabilistic column shortenings considering confidence intervals are compared with the actual column shortenings by field measurement. The time-dependent strains measured at tall bearing wall building were generally lower than the predicted strains and the measured values fell within a range ${\mu}-1.64$, confidence level 90%.

Column Shortening of SRC Columns Considering the Differential Moisture Distribution (부등수분분포를 고려한 SRC 기둥의 축소량에 관한 연구)

  • Seol, Hyun-Cheol;Kim, Yun-Yong;Kwon, Seung-Hee;Kim, Han-Soo;Kim, Jin-Keun
    • Journal of the Korea Concrete Institute
    • /
    • v.18 no.1 s.91
    • /
    • pp.29-36
    • /
    • 2006
  • Steel reinforced concrete(SRC) columns, which have been widely employed in high-rise buildings, exhibit a time-dependent behavior because of creep and shrinkage of concrete. This long-term behavior may cause a serious serviceability problem in structural systems, so it is very important to predict the deformation due to creep and shrinkage of concrete. However, it was found from the previous experimental studies that the long-term deformation of SRC columns was quite dissimilar from that of RC columns. A new method is required to quantitatively predict the long-term deformation of SRC columns. In this study, the causes of the discrepancy between the behaviors of RC and SRC columns are investigated and discussed. SRC columns exhibit a time-dependent relative humidity distribution in a cross section differently from that of reinforced concrete(RC) columns owing to the presence of a inner steel plate, which interferes with the moisture diffusion of concrete. This relative humidity distribution may reduce the drying shrinkage and the drying creep in comparison with RC columns. Therefore it is suggested that the differential moisture distribution should be taken into account in order to reasonably predict column shortening of SRC columns.

The Effects of Differential Axial Shortening on RC High-rise Buildings with Outrigger or Mega Structure Systems (아웃리거구조시스템과 메가구조시스템 적용에 따른 철근콘크리트 초고층 건물에 대한 부등축소의 영향)

  • Kim, Gyeong-Chan;Kim, Jae-Yo
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.35 no.1
    • /
    • pp.35-44
    • /
    • 2022
  • It is essential to control the lateral displacement and differential axial shortening of the vertical elements in high-rise buildings. Recently, an outrigger or a mega structure system has been adopted to control the lateral displacement. Furthermore, to resolve the problems caused by differential axial shortening in high-rise buildings, analytical prediction and correction is often studied; however, the study on the comparisons of the lateral load resisting systems to address differential axial shortening is less. Therefore, in this paper, a 60-story RC residential building using an outrigger or a mega structure system is analyzed with a construction sequence. Moreover, differential axial shortening can result in an additional member force of structural members and failure of non-structural members. These problems caused by differential axial shortening affects the behaviors and can damage the important structure member in the high-rise buildings. Hence, the effects of the systems on differential axial shortening between the vertical elements in high-rise buildings are studied.

Average Correction for Compensation of Differential Column Shortening in High-rise Buildings (이동 평균법을 이용한 고층 건물의 부등축소량 보정 기법)

  • Park, Sung-Woo;Choi, Se-Woon;Park, Hyo-Seon
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.23 no.4
    • /
    • pp.395-401
    • /
    • 2010
  • The vertical members of structures are shortened as time goes on. Because structures have been high-rising and atypical there should be different axial loads among vertical members and it causes differential column shortenings. The differential column shortening add stresses to connections, make slab tilt, and damage to non-structural components. To reduce these influences compensation is need. The rational compensation means the exact expectation of amounts of column shortenings and the reasonable corrections. The expectation of column shortenings are more exact as researched, however, there is little research about the compensation. This paper presents the average correction method and the constraints for differential column shortenings considering errors due to the construction precision. The relations between constraints and the number of correction groups give an objective criterion for decision of constraints.

Effects of Long Term Deformation of Concrete on Internal Member Forces of Tall Buildings (초고층 건물에서 콘크리트의 장기거동이 부재내력에 미치는 영향)

  • Shin, Seung-Hak;Kim, Han-Soo
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.297-300
    • /
    • 2010
  • 본 논문에서는 일반적인 해석, 시공단계를 고려한 해석, 시공단계와 장기거동을 고려한 해석의 3가지 해석방법을 사용하여 수평부재의 설계에 적합한 해석방법을 제안하였다. 80층의 2D 구조모델에 3가지 해석방법을 적용하여 각 해석방법에 따라 부등축소량, 수직부재에 작용하는 축력, 수평부재의 단부에 작용하는 내력의 해석결과를 얻어 비교하였다. 또한 부재의 내부에서 철근과 콘크리트의 하중분담율의 시간에 따른 변화양상을 알아보았다. 해석결과 시공단계에 의한 영향은 수평부재에 작용하는 축력과 부등축소량 예측, 부재 내력 해석에 있어서 반드시 고려되어야 함을 알 수 있었다. 장기거동의 효과는 기둥축소에는 크게 영향을 미치지만 수직부재의 축력, 수평부재의 내력에는 변형만큼의 영향은 보이지 않는다. 시공시의 보정량을 결정하기 위해서는 장기거동이 반드시 고려되어야 하지만 부재의 단면설계의 목적으로는 제외되어도 무방할 것으로 판단된다.

  • PDF

Effect of Outrigger Wall Reinforced with Post Tension on Reducing Differential Column Shortening (포스트 텐션으로 보강된 아웃리거 벽체의 부등기둥축소량 저감 효과)

  • Lim, You-Jin;Kim, Han-Soo
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.33 no.4
    • /
    • pp.237-244
    • /
    • 2020
  • This study investigates the effect of the outrigger wall reinforced with post-tension on reducing differential column shortening. Since the outrigger wall is a concrete structure, the effect of its long-term behavior should be considered. The long-term behavior of the outrigger wall increases differential column shortening and decreases the shear force acting on the outrigger. When the stiffness of the outrigger becomes small, the effect of its long-term behavior increases. Furthermore, a method of reinforcing with post-tension to reduce differential column shortening is proposed. Following the analysis, it was confirmed that the post-tension method shows a significant reduction in the differential column shortening. This study shows that the effect of the outrigger wall reinforced with post-tension on reducing differential column shortening increases with the prestressing force of tendon.

System Development for Analysis and Compensation of Column Shortening of Reinforced Concrete Tell Buildings (철근콘크리트 고층건물 기둥의 부등축소량 해석 및 보정을 위한 시스템 개발)

  • 김선영;김진근;김원중
    • Journal of the Korea Concrete Institute
    • /
    • v.14 no.3
    • /
    • pp.291-298
    • /
    • 2002
  • Recently, construction of reinforced concrete tall buildings is widely increased according to the improvement of material quality and design technology. Therefore, differential shortenings of columns due to elastic, creep, and shrinkage have been an important issue. But it has been neglected to predict the Inelastic behavior of RC structures even though those deformations make a serious problem on the partition wall, external cladding, duct, etc. In this paper, analysis system for prediction and compensation of the differential column shortenings considering time-dependent deformations and construction sequence is developed using the objected-oriented technique. Developed analysis system considers the construction sequence, especially time-dependent deformation in early days, and is composed of input module, database module, database store module, analysis module, and analysis result generation module. Graphic user interface(GUI) is supported for user's convenience. After performing the analysis, the output results like deflections and member forces according to the time can be observed in the generation module using the graphic diagram, table, and chart supported by the integrated environment.