• Title/Summary/Keyword: 보증계약

Search Result 95, Processing Time 0.02 seconds

Guaranteed Reserve Projections for the Guaranteed Interest Contract of Collective DC Funds (통합운영 DC의 이율보증 준비금 추정에 관한 연구)

  • Sung, Joo-Ho;Seo, Dong-Won;Lee, Dong-Hwa
    • Journal of the Korea Society for Simulation
    • /
    • v.28 no.3
    • /
    • pp.57-63
    • /
    • 2019
  • This study suggests the level of guaranteed reserves that should be accumulated in order to provide guaranteed interest contracts to pension members. To calculate the guaranteed reserve, this study employs the method using variable insurance contracts with guaranteed interest options. The average return of three major pensions (national pension, private teacher's pension, civil servants pension) funds, from 2010 to 2018, is set as the target rate of return and then we establish 0%, 1.0%, 1.5% and 2.0% each as our minimum guaranteed returns for their respective guaranteed reserves. Our results firstly show that gaps between each guaranteed reserves are increasing as times goes on. Second, the probability of shortfall reserve is on the decrease as the pension fund is mature. Conclusively, a long-term conservative balance between risk and return is one of the best investing strategies in pension funds providing the guaranteed interest.

대한설비건설협회,기계설비공사 하자담보 책임기간,일반건설업체에 안내

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.10 s.183
    • /
    • pp.31-33
    • /
    • 2005
  • 기계설비공사의 하자담보책임기간은 <건설산업기본법시행령 제30조 관련 별표 4>, <국가를 당사자로 하는 계약에 관한 법 시행규칙 제70조 관련 별표 1> 및 <주택법시행령 제59조 제1항 관련 별표 6>에 의하여 2년 이내로 규정되어 있다. 그러나, 일부 발주기관 및 건설업체에서 기계설비공사의 하자담보책임기간을 법으로 정한 기간을 초과 설정하여 하자보수 비용 및 하자보증수수료 증가 등의 민원이 발생되고 있어, 건설교통부 및 재정경제부는 하자담보책임기간을 법으로 정한 기간을 준수하여 줄 것을 발주기관에 협조 요청한 바 있다. 이와 관련 대한설비건설협회에서는 기계설비공사 하자담보책임기간을 법으로 정한 기간을 정하여 줄 것을, 시공능력 300위 이내의 일반건설업체 대표이사와 하도급계약담당 부서장에게 요청하였다. 또한 계약 체결한 기계설비공사의 하자담보책임기간이 법으로 정한 기간을 상회하는 경우에는 회계통첩에 의하여 계약서상의 기간을 조정하여 하도급계약시에는 법으로 정한 하자담보책임기간을 설정하여 줄 것을 요청하였다.

  • PDF

Estimation of lapse rate of variable annuities by using Cox proportional hazard model (Cox 비례위험모형을 이용한 변액연금 해지율의 추정)

  • Kim, Yumi;Lee, Hangsuck
    • Journal of the Korean Data and Information Science Society
    • /
    • v.24 no.4
    • /
    • pp.723-736
    • /
    • 2013
  • The importance of lapse rate is highly increasing due to the introduction of Cash Flow Pricing system, non-refund-of-reserve insurance policy, and IFRS (International Financial Reporting System) to the Korean insurance market. Researches on lapse rate have mainly focused on simple data analysis and regression analysis, etc. However, lapse rate can be analyzed by survival analysis and can be well explained in terms of several covariates with Cox proportional hazard model. Guaranteed minimum benefits embedded in variable annuities require more elegant statistical analysis of lapse rate. Hence, this paper analyzes data of policyholders with variable annuities by using Cox proportional hazard model. The key variables of policy holder that influences the lapse rate are payment method, premium, lapse insured to term insured, reserve-GMXB ratio, and age.

미활용에너지, ESCO사업으로 잡는다

  • O, Hye-Eun
    • The Magazine for Energy Service Companies
    • /
    • s.41
    • /
    • pp.16-19
    • /
    • 2006
  • 에너지절약전문기업인 (주)에너지솔루션즈 (대표 이범용)가 한국환경에너지(주)와 '시화공단 미활용에너지회수 증기공급사업'에 대한 성과보증계약을 체결하고 지난 6월 30일 시공을 완료했다. 연간 19억원의 에너지를 절감할 수 있는 이번 사업은 신재생분야로 발돋움하기 위한 에너지솔루션즈의 주력사업 중 하나로, 경영기획실 이모석 실장을 만나 자세한 얘기를 들어봤다.

  • PDF

건설.중소기업 관련 분야별 제도, 올해부터 이렇게 달라진다

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.258
    • /
    • pp.74-77
    • /
    • 2012
  • 올해부터, 국토해양부 장관이 고시하는 최저가낙찰제 대상공사에 대하여 포괄대금지급보증제도가 시행되며, 건설근로자 노무비 구분관리 및 지급 확인제가 추진된다. 또한 근로계약 체결시 근로조건 일반사항이 명시된 서면을 근로자에게 반드시 교부해야 하며, 장애인 고용부담이 강화된다. 본지는 올해부터 달라지는 건설 중소기업 관련 개편 시행되는 각종 제도를 소개한다.

  • PDF

A Study on the Improvement of Engineering and Construction Supervision Guarantee System in Korea (국내 설계.감리 등 용역보증제도 현황 및 개선방안 연구)

  • Lee, Yong-Hee;Choi, Jae-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.3
    • /
    • pp.53-61
    • /
    • 2011
  • After several collapse accidents of large structures in the early 1990s in Korea, the government enacted a law that architectural, engineering and construction firms are obliged to have insurance for projects over a certain size. Particularly, with regard to insurance in design and construction supervision works (i.e. engineering insurance), although several operation-based problems were pointed out from practitioners, still little research has been done on analyzing current regnlartory and operational state and suggesting policy alternatives. Hence, this study applies Delphi technique to solicit current operational problems and propose a series of improvements on engineering insurance based on interview surveys targeting major market participants: municipalities, engineering firms, and insurance companies. Key findings culminate in adopting guarantee limits based on credit evaluation, abrogating joint surety, covering a loss of life, increasing insurance entrance fee, extending time covered, and etc. Reaching a consensus on the proposed alternatives between the market participants will form the foundation for sound developments of construction design and engineering industry.

A study on the Problems and Improvement of Export Credit Guarantee System in the Trade Insurance (무역보험의 수출신용보증제도의 문제점과 개선방안)

  • La, Kong-Woo
    • International Commerce and Information Review
    • /
    • v.15 no.1
    • /
    • pp.259-283
    • /
    • 2013
  • In this study has been suggested on the basis of the Court of Audit's report on trade insurance issues presented and the Export Credit Guarantee Insurance Improvement. First, the improvement insurance underwriting standards and come up with measures to improve the soundness of the insurance fund trading. In order to do this, (1) warranty for a lower credit companies strengthen underwriting standards, (2) raise short-term solvency and the accuracy of financial statements Review criteria Borrowings calculated based, (3) trustee companies Warranty Terms for improvement, (4) for closure of businesses quickly take measures of bond conservation measures. Second, through improved risk management measures to strengthen risk management for export credit guarantees are to be provided.

  • PDF

이슈 & 이슈 - 건설산업 불공정 거래관행 뿌리 뽑는다

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.276
    • /
    • pp.56-62
    • /
    • 2013
  • 정부는 건설현장에서 발생하는 다양한 형태의 불공정 관행을 개선하고 공정한 건설환경을 조성하기 위해 지난 6월 14일 '건설산업 불공정 거래관행 개선방안'을 발표했다. 개선방안은 하도급계약의 공정성을 높이기 위해 불공정 하도급계약을 무효화하고 발주자가 하도급계약을 의무적으로 점검토록 했다. 또한 건설하도급 외상매출채권 담보대출로 인한 하도급업체의 피해를 줄이기 위해 보험 보증 등을 통한 보호를 강화하는 방안도 담겼다. 이와함께 주계약자 공동도급 발주공사를 적극 발굴하여 원 하도급업체 간 수평적 협력관계 정착을 유도키로 했다. 정부의 이같은 개선방안은 그동안 대한설비건설협회가 정홍원 국무총리를 비롯하여 서승환 국토부 장관 등 관계부처와의 간담회와 관계요로에 수시로 건의한 결과 정부가 이를 적극 수용하여 마련된 것이다. 이로써 설비건설업계는 공공공사 분리발주 법제화와 함께 적극 추진하였던 주계약자 공동도급 활성화, 불공정하도급 관련 제도의 대폭적인 개선으로 경영환경이 크게 개선될 것으로 기대된다. 대한설비건설협회 김경회 총괄본부장은 "협회의 건의사항이 대폭 반영된 만큼 개선방안이 실효를 거둘 수 있도록 더욱 노력할 계획"이라고 밝혔다.

  • PDF

CM at Risk Case Study on Guaranteed Maximum Price Contract - Focused on Cases for USA - (책임형 CM 발주방식의 최대공사비보증계약 사례연구 - 미국 공공발주 프로젝트 사례 중심 -)

  • Jeong, Jinhak;Han, Jonghoon;Lee, Joosung;Ahn, Yonghan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.22-30
    • /
    • 2019
  • The purpose of this study is to derive basic data of the Guaranteed Maximum Price(GMP) process and to present specimens that can be used at the time of execution of CM at Risk project in South Korea. CM at Risk project is issued in South Korea, but the actual data is lack. On the other hand, CM at Risk project is universalized and the market of the CM at Risk is steadily growing. Because of that, in this study, The United States cases was selected as a sample. GMP consists of CM's fee, CM contingency, project direct cost, project indirect cost, allowance. GMP negotiations are performed before the end of design completion, and after 3 rounds of estimation comparison, preliminary GMP is confirmed. GMP can be multiple contract and it is useful for Procurement of long lead materials and early construction. If the actual cost is lower than expected GMP, sharing of the saving is an option since the conflict of interests between the client and the contractor can occur.

PFI법을 적용한 일본의 ESCO사업

  • 에너지절약전문기업협회
    • The Magazine for Energy Service Companies
    • /
    • s.29
    • /
    • pp.48-61
    • /
    • 2004
  • 최근 일본에서는 ESCO사업에 PFI법을 새로이 적용하고 있다. 성과배분제, 성과보증제에 이어 이 제도를 적용할 경우, 국가 및 공공기관을 대상으로 하는 ESCO사업의 확대 및 자금조달이 한층 유리해질 전망이다. 지난 99년 제정된 PFI(Private Finance Initiative)법(민간자금 등의 활용에 의한 공공시설 등의 정비 등의 촉진에 관한 법률)에 근거한 사업은 ''공공시설 등''에 있어서 건설, 유지관리 운영 등을 민간의 자금, 경영능력 및 기술적 능력을 활용하는 사업방법으로 사업 전체의 리스크관리가 효율적으로 행해지는 것과 설게$\cdot$시공$\cdot$유지관리$\cdot$운영의 전부 또는 일부를 일체적으로 취급하는 것에 의해 사업비용의 절감이 기대되며 질 높은 서비스의 제공이 가능한 제도이다. 이것과 매우 유사한 개념을 가지고 있는 것이 성과보증제에 의한 ESCO사업이다. 민간사업자인 ESCO사업자가 자금을 조달하고 에너지절약 개수공사에 따른 설계$\cdot$시공$\cdot$, 운전$\cdot$유지관리, 계측$\cdot$검증, 에너지절감 보증 등의 서비스를 제공하며, 광열수도비 및 운전$\cdot$유지관리비의 절감분으로 모든 투자와 ESCO사업자의 경비를 지불한다. 또 에너지절감 및 공공의 이익보증을 포함한 퍼포먼스계약이라고 하는 형태를 취하는 것으로 공공 이익의 최대화를 도모함과 동시에 금융기관의 투자 리스크에 관한 우려를 회피할 수도 있다. 또 PFI법 특유의 법제상, 재정상의 조치와 재정상 및 금융상의 지원이라는 배려에 있다. 예를 들면, 국고채무부담행위의 설정, 행정재산 사용료의 무상화 또는 감면, 프로젝트 파이낸싱 등에 의한 자금조달을 고려할 경우에 있어서 담보권의 설정 등에 관한 제도를 합리적으로 정비하는 것이 가능하게 된다. 그 내용의 대강을 살펴본다.

  • PDF