• Title/Summary/Keyword: 보수 범위

Search Result 288, Processing Time 0.032 seconds

A Study on Field Application of Preventive Maintenance Method for Flexible Pavements (연성포장의 예방적 유지보수공법에 대한 현장 적용성 연구)

  • Kim, Nakseok;Jin, Jung-Hoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.4D
    • /
    • pp.565-569
    • /
    • 2011
  • This paper presents minimum area repair method that is one of the preventive maintenance techniques in asphalt concrete pavements. In this method, a 70cm-width as an effective repair zone was suggested considering the conventional longitudinal damages (rutting and fatigue cracking) in early stages. In addition, the repair zone can be readjusted according to the pavement damage levels. A field test bed was constructed to verify the adaptness for the repair method. Test results revealed that the minimum area repair method can be adopted as a preventive maintenance technique in flexible pavements to recover an appropriate serviceability level. The preventive maintenance method may be one of the major maintenance methods of flexible pavements with an appropriate application. It is also noted that the method may be a long term maintenance cost effective and pavement life ensuring one.

An Analysis of Maintenance Cost of Preventive Optimized-Rehabilitation Area Method in Asphalt Concrete Pavement (예방적 최소단면 보수공법 적용 아스팔트 도로포장의 유지관리 비용분석)

  • Kim, Nak-Seok;Hong, Eun-Cheol
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.9 no.4
    • /
    • pp.45-51
    • /
    • 2009
  • The paper presents the economic analysis of optimized-rehabilitation area method considered as one of the preventive maintenance methods in asphalt concrete pavement. The optimized-rehabilitation area was selected based on the analysis of traffic lane characteristics. The main concept of the selected method was to minimize the maintenance cost. The effective width of traffic lane in this method was 70 cm of each wheel path. According to the traffic survey conducted in this research, more than 95% of vehicles passed within the width of each wheel path. The new preventive optimized-rehabilitation area method showed less maintenance cost than the conventional overlay. In addition, traffic congestions and the user cost can be reduced. The research results revealed that the total maintenance cost was reduced by 35% by using the new method compare to the conventional one.

A Study on the Completion procedure of Defect Repair for Apartment Housing (공동주택의 하자보수 종료 절차에 관한 연구)

  • Jun Woo-Taek;Nam Gyoung-Woo;Koo Kyo-Jin;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.283-286
    • /
    • 2002
  • Defect problems happening in the course of stressing quantity expansion of residence supply due to lark in maintenance are intensifying insincerity of construction business resulting from the psychological and economic damage, and there are many quarrel between residence suppliers and consumers. Because an apartment house's qualify is decided by various elements from design, to lotting-out, construction, and after-management, it is limited to express house capacity and standard to appraise defect objectively and quantifiably. The bound of defect and the period of guarantee expressed cleary in regulation of apartment house lack in quantifiable concept, and guarantee of defect is composed of a general concept. Therefore the big difference in opinion about defect and the bound of repair makes repair process slow and only to increase social costs. This research will give residence suppliers and consumers a resonable way to solve repair process during tile obliged period of guarantee since moving into from a process which are design, planing, construction, and after management. Furthermore it will present each business and role to conclude defect repair easily, so I planed to promote maintenance after conclusion of defect repair.

  • PDF

The Maintenance Cost Estimation Model for Information System Maintenance Based on the Operation, Management and Service Metrics (운영·관리 및 서비스 지표에 기반한 정보시스템 유지보수 비용 추정 모델)

  • Lee, Byoung-Chol;Rhew, SungYul
    • Journal of the Korea Society of Computer and Information
    • /
    • v.18 no.5
    • /
    • pp.77-85
    • /
    • 2013
  • In this paper, we present the cost measurement metrics for the operation management and service improvement besides the general maintenance. The cost measurement metrics of the operation management and service improvement are based on the metrics that are classified and summarized precedent studies and complemented by empirical measuring indicators, and we propose the maintenance cost estimation model based on this metrics. The maintenance costs can be calculated detailedly, because the proposed metrics can be used selectively, depending on the scope of the information system maintenance. The effectiveness of the proposed maintenance cost measurement metrics and cost estimation model is verified by comparison between existing studies and our research.

Study on Fatigue Behavior and Rehabilitation of Stringer with Coped Section(I) -Experimental Study on Static and Fatigue Behavior- (절취부를 갖는 세로보의 피로거동과 보수·보강에 관한 연구(I) -정적거동 및 피로거동의 실험적 고찰-)

  • Hwang, Yoon Koog;Chang, Dong Il
    • Journal of Korean Society of Steel Construction
    • /
    • v.9 no.3 s.32
    • /
    • pp.363-375
    • /
    • 1997
  • This study encompasses the performance of static and fatigue test for the 8 large scale test specimens to clarify the fatigue behavior of coped stringer and the effect of the repair and strengthening on the damaged stringer of the floor system in steel railway bridges. For the purpose of the research, the actual stress wave for the existing bridge was measured, the basic stress range frequency histogram was made and the equivalent stress range was calculated. Using the result from the equivalent stress range made by adjusting the stress range, the static and fatigue test was carried out by identifying the previous rehabilitation and after. As the result of the static tests, it was revealed that the level of local stress under the S1 specimen test of the real equivalent stress range was similar to tensile strength of the test material, and it was consistent with the requirement of the initiation condition of the fatigue crack. Through the various rehabilitation methods to the damaged specimens, the effects of the repair and reinforcement were analyzed. According to the results of the repair of effect, bolting the high tension bolt over the stop hole was confirmed to be more adequate method than drilling only stop hole to delay the fatigue crack growth. Futhermore, in case of the stringer subjected by bending moment, the reinforcement over the upper flange side was determined to be a useful strengthening method, and the reinforcement to the web of the stringer was not appropriate to accomodate as a adequate strengthening method. Also it was confirmed that the category of the fatigue design for the coped stringer met with the category E specified on the fatigue design criteria of the Highway Standard Specification in Korea.

  • PDF

Cast iron welding (주철용접)

  • 유순영
    • Journal of Welding and Joining
    • /
    • v.7 no.2
    • /
    • pp.1-11
    • /
    • 1989
  • 주철은 구조물 및 공업재료로써 오랫동안 사용되어 왔으나 이들 용접은 항상 어렵고 특별한 지 식과 기술을 계속 요구하고 있다. 최근 가격면에서 유리한 주철을 주강 및 단조품과 대체하여 사용이 증가하는 추세이다. 이는 주조공정의 고유한 유연성과 함께 합금설계, 주조기술 및 열처 리 분야에서 개선이 이루어지면서 가능해졌다. 이런 개발과 병행하여 주철을 용접할 필요성이 증가되었다. 옛날에는 용접의 어려움 때문에 주철용접은 제조중 생긴 주물결함 보수나 사용도중 생긴 균열에 대한 보수용접으로 국한되었다. 그러나 수년동안의 용접기술 개발과 금속학적인 영향에 대한 지식이 증대됨에 따라 주철끼리 또는 강과의 접합까지 용접의 범위가 넓어졌다. 본고에서는 주철용접을 이해하는데 필수적인 금속학적인 영향들에 대해 주철 종류별로 설명하고 이들을 용접하는데 있어 성공과 실패에 대한 이유등을 실례를 들어 기술하고자 한다.

  • PDF

Analysis of Loss of Condenser Vacuum Accident using a Conservative Approach with a Best-Estimate Code (최적코드를 이용한 복수기진공상실 사고의 보수적 해석)

  • Jeong, Hae-Yong
    • Journal of Energy Engineering
    • /
    • v.24 no.4
    • /
    • pp.175-182
    • /
    • 2015
  • A methodology to determine the most conservative initial condition based on random sampling of operation parameters is established, in which a best-estimate computer code is adopted to minimize the conservatism in code models. To validate the applicability of the suggested method, safety evaluation for a transient of loss of condenser vacuum in a pressurized water reactor is performed. One-hundred different initial conditions are generated by MOSAIQUE program automatically and the peak pressure for the most conservative case is determined from transient analyses. The safety margin obtained with the new approach is almost equivalent to the values determined with the existing methodologies. It is found that the time and human resources required for the safety evaluation could be reduced with the suggested approach.

Improvement of the Priority Index for Choice between Repair and Reinforcement Methods of Dam and River Facilities (댐·하천 시설물 보수·보강공법 선정을 위한 우선순위지수 산정식 개선방안 연구)

  • Kim, Dong Hyun;Youn, Hee Jung;Yoo, Hyung Ju;Lee, Seung Oh
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.234-234
    • /
    • 2021
  • 국내 기반시설의 대부분은 1970년대 경제성장기에 건설되어 사용연수가 30년 이상 경과하였고 급격한 고령화가 진행 중이다. 1990년대 성수대교와 삼풍백화점의 붕괴는 시설물 유지관리의 중요성에 대한 전국민적 관심을 집중시켰고, 이에 정부는 1995년 「시설물의 안전관리에 관한 특별법」 제정을 시작으로 현재까지 다양한 정책 및 기준을 수립해왔다. 일반적으로 안전점검 및 정밀안전진단 등을 수행하여 시설물의 안전등급을 평가하고 결함에 대한 보수·보강을 실시하여 시설물을 유지·관리하고 있다. 그러나 유지관리 예산은 한정적이기 때문에 모든 결함에 대한 보수·보강 사업을 실시할 수 없는 실정이다. 이에 보수·보강 조치의 우선순위를 선정하는 것이 필요하며, 관련 법령 세부지침에는 부재의 중요도, 결함의 심각성, 경제성을 고려한 우선순위지수(PI, Priority Index)를 제시하고 있다. 이 식은 전문가의 주관적인 판단에 의해 영향도를 50~100%범위 안에서 조정할 수 있으며, 일부 특정 부재는 동일한 가중치가 설정되어 있다. 또한 결정적으로 보수보강을 통한 효과를 효율적으로 고려하지 못하고, 대부분 경제성에 의해 우선순위가 결정되는 한계점이 발생한다. 따라서, 본 연구에서는 몇 가지 사례분석을 통해 현재 우선순위지수에 대한 문제점을 고찰하고 이를 개선할 수 있는 우선순위 산정식(PI)을 제시하였다. 과거 유지관리 시행 초기에는 보수보강 사례가 부족하였지만 현재는 수십년간의 축적된 자료를 바탕으로 제시된 산정식을 충분히 활용할 수 있을 것으로 판단된다. 향후 보수보강 효과를 정량화하는 방법에 대한 추가적인 연구가 수행된다면 더욱 경제적인 측면에서 우선순위를 산정할 수 있을 것이며 노후화된 기반시설 유지관리방안에 효과적으로 사용될 것으로 기대된다.

  • PDF

Inconel 600 plate의 Nd:YAG 레이저 용접특성분석

  • 정진만;권성옥;김철중
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 1996.05d
    • /
    • pp.455-460
    • /
    • 1996
  • 원자력발전소의 전열관 보수용접 기술 개발을 위해 Inconel 600 재질의 plate 판에 레이저 용접실험을 수행하였다. 레이저 발진기로 부터 발진된 레이저 빔은 광섬유를 통하여 전송되고, 집광렌즈군를 이용하여 용접이 이루어지도록 하였다. pulse 레이저 용접 변수인 펄스폭, 반복율, 첨두출력 및 용접속도를 변화시키면서 용접결과를 측정하였다. 이에 따른 적절한 용접범위를 제시하였다.

  • PDF