• Title/Summary/Keyword: 보수량

Search Result 675, Processing Time 0.025 seconds

Effect of ankle strengthening exercise using BOSU ball and taping on plantar pressure in patients in their 20s with hallux valgus (보수볼을 이용한 발목 강화 운동과 테이핑이 엄지발가락가쪽휨증을 가진 20대 환자의 발바닥 압력에 미치는 영향)

  • SAIKHANZUL, JARGALSAIKHAN;Jeong, Beom-Cheol;Yoo, Kyung-Tae
    • Journal of Industrial Convergence
    • /
    • v.19 no.6
    • /
    • pp.81-91
    • /
    • 2021
  • This study was conducted to investigate the effect of ankle muscle strengthening exercise using BOSU ball and taping on static and dynamic plantar pressure in patients with hallux valgus. Subjects were 26 men and women in their twenties with hallux valgus, and they were randomly assigned to a taping group (TG; n=13) and an ankle strengthening group (ASG; n=13). Each group received the appropriate intervention over a total of 4 weeks, and static and dynamic plantar pressure were measured before and after the intervention. Independent T-test was performed to examine the difference in the amount of change between groups, and paired-sample T-test was performed to determine whether the difference between the pre-post values within the group was significant. The statistical significance level was set as α=.05. As for the ratio of the total body weight of the foot (Foot), the amount of change in the ASG of the left foot was significantly decreased compared to the TG within the group (p<.05). Significantly increased (p<.05). As for the degree of pronation of the foot (MP/change ratio), the amount of change in the TG of the right foot was significantly decreased compared to the ASG (p<.05), and in the force of the foot, the TG of the left foot was the amount of change within the group compared to the ASG. was significantly increased (p<.05), and in the group-to-group change, the amount of change in TG was significantly different than that of ASG (p<.05). Therefore, it can be considered that ankle strengthening exercise using bosu ball and taping are insufficient to give effective change to patients with hallux valgus.

A Study on the Waterproof Method to the Leakage Type of Underground Structure by Cement Grouting (지하구조물의 누수유형에 따른 시멘트그라우팅 방수기법에 관한 연구)

  • 천병식;최춘식
    • Journal of the Korean Geotechnical Society
    • /
    • v.17 no.5
    • /
    • pp.181-196
    • /
    • 2001
  • 지하구조물에 있어서 누수사고의 빈번한 발생 및 상습화 경향에도 불구하고 현재 국내에서 사용되고 있는 누수보수방법은 누수유형에 관계없이 일괄적으로 동일한 처리방식으로 보수하는 상황으로서 지하구조물 누수에 대하여 누수 유형별로 보수방법을 달리하는 적극적인 해결방안의 모색이 필요하다. 따라서, 본 연구에서는 지하구조물의 누수보수에 있어서 방수 그라우트재의 공학적 특성을 파악하고 현장상황에 적합한 방수그라우팅 기법을 수립하여 누수유형별로 적용한 사례를 중심으로 적용성을 고찰하였다. 방수그라우팅 적용사례를 분석한 결과 지하구조물의 누수방지를 위하여 누수상황 및 누수유형에 따라 주입재의 배합비를 적절히 변화시켜 주입재와 현장상황에 적합한 방수그라우팅 기법을 병행 적용하는 것이 확실한 방수효과를 얻을 수 있으며, 주입목표구간에 대해 단계적으로 수회로 나누어 순차적인 그라우팅과 가능한 한 저압, 소량, 장시간에 걸쳐 주입하는 것이 방수그라우팅 효과를 증대시킬 수 있는 것으로 판단된다. 또한, 현장 적용결과로부터 기존 방수이론의 영향요소에 추가하여 물시멘트비, 주입재의 입경, 주입시간 및 주입량, 혼화재 사용여부, 주입차수 등에 대한 다양한 영향요소의 검토가 필요한 것으로 판단된다.

  • PDF

Enhancement of runoff estimation module in SWAT (SWAT 모형의 유출성분 계산 모듈의 개선 및 효과분석)

  • Kim, Nam-Won;Lee, Jeong-Woo
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2010.05a
    • /
    • pp.1350-1354
    • /
    • 2010
  • SWAT 모형에서는 토양수량을 고려하여 유출곡선지수법에 따라 지표유출량과 침투량을 계산하고, 계산된 침투량이 토양수대가 받을 수 있는 최대용량인 토양수 최대보수용량(soil water capacity)을 초과할 경우에는 그 초과분을 강제적으로 토양수량에 더해지도록 처리하고 있다. 즉, 초과침투량이 연직 아래로만 유입되는 것으로 간주하고 있다. 이러한 방식은 경사가 매우 완만한 경우에는 적합하다고 할 수 있으나, 국내 유역에서와 같이 비교적 유역 경사가 급한 경우에는 지표유출량이 작게 계산될 수 있으며 특히 집중호우시 강우에 대한 유출 응답이 둔감하게 모의되어 홍수기 큰 강우로 인해 급격하게 증가하는 유출량을 잘 모사하지 못하게 되는 경우가 발생한다. 따라서 본 연구에서는 홍수기 큰 강우에 대해서 유출량이 민감하게 반응할 수 있도록 초과침투량 재분배 모듈($\underline{R}$edistributing $\underline{EX}$cessive $\underline{INF}$iltration module, 이하 SWAT-REXINF)을 개발하였다. 이 모듈은 토양층의 보수능을 초과하는 침투량 처리 방식을 개선한 것으로 지표유출의 집중시간과 토양수의 침루 유하시간의 상대적인 크기에 따라 초과침투량을 분배하여 지표유출량과 침투량에 할당하는 방식을 취하고 있다. 개발 모듈 SWAT-REXINF을 기 개발한 시간가중평균 유출곡선지수법에 의한 지표유출계산법과 접합-분리 방식의 토양층 구조화 기법 등의 유출계산 개선 기법과 접목하여 그 효과를 충주댐 유역에 대해 분석하였다. 시간가중평균 유출곡선지수법에 의한 지표유출계산법과 접합-분리 방식의 토양층 구조화 기법 등 다른 유출 개선 기법과 혼용하여 적용할 경우에는 지표유출량이 약 2배 증가, 첨두유량은 20~50% 증가하는 등 개선 효과가 매우 크게 나타났다. 모형 개선으로 인해서 강우량에 대한 유출량의 응답 민감도를 증가시켜 유출수문곡선의 증감을 보다 용이하게 모의할 수 있고 정확도 또한 높일 수 있을 것으로 판단된다.

  • PDF

measuring leakage in air lines

  • 임광규
    • Cement
    • /
    • s.47
    • /
    • pp.69-73
    • /
    • 1972
  • 본 시험은 현장에서 실시 가능한 간이식 측정 방법에 의하여 실시되었으며 pipe line의 점검, 보수 등의 불철저로 인한 air leakage량은 전체 압기 토출량의 12.42$\%$에 달하고 있다.

  • PDF

Improving Moisture Retention Capacity of Pine Bark by Grinding and Blending with Recycled Rockwool (분쇄와 폐암면의 혼합에 의한 소나무 수피의 보수성 증진)

  • Choi, Jong-Myung;Chung, Hae-Joon;Choi, Jong-Seung
    • The Journal of Natural Sciences
    • /
    • v.11 no.1
    • /
    • pp.131-135
    • /
    • 1999
  • The objective of this research was to improve moisture retention capacity of pine bark. To achieve this, barks were ground with Wiley mill of hammer mill and were blended with recycled rockwool. Then, changes of soil physical properties were determined. The percentage of particles larger than 5.6 mm was 86.5% in raw materials. The percentage of particles larger than 1 mm decreased and those of particles smaller than 1 mm increased by grinding with Wiley mill or hammer mill. Grinding with Wiley mill showed better effect than those of hammer mill in decreasing particle size distribution. Grinding resulted in decreased total porosity (TP) and air space (AS) and increased container capacity (CC) and residual water content (RW), indication improved moisture retention capacity. The material ground with Wiley mill, than blended with 50% recycled rockwool had 81.1%, 67.7%, 13.5% and 235 ml in TP, CC, AS and RW, respectively. These results indicated that moisture retention capacity was improved by blending with recycled rockwood, but aeration of root media was much better than those of peat+vermiculite(1:1, v/v), which is commonly used in commercial production.

  • PDF

A Study on the Estimation of Proper Construction Cost for Road Pavement Maintenance Work (아스팔트포장 유지보수 적정공사비 산정방안 연구)

  • Oh, JaeHun;Song, TaeSeok;An, BangYul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.16-26
    • /
    • 2020
  • Road Pavement Maintenance Work is generated in a variety of different field conditions, and it is difficult to calculate the construction cost because there are no detailed criteria when preparing the estimated construction cost. Unlike new pavements, Road Pavement Maintenance has to be constructed with operating vehicles, and there are many differences in productivity depending on urban areas, limited work hours, night-time, construction area, etc. To compensate for this, the standard for calculation of construction cost provides additional charges for the number of lanes, residential areas, working hours, and night work, but it applied differently depending on construction officials. In this study, construction cost estimation standards that can properly reflect the conditions of the site was investigated for major types of Road Pavement Maintenance work. The site was investigated and analyzed mainly for many construction sites with 'overlay of asphalt after cutting', 'restore surface', 'repair of pavement', and 'recovery of roadway'. The criteria for the application of construction volume separately according to working hours, public places, and land area including extra charges for basic downtown and residential area. The hours of operation were divided into three types(7 hours, 5 hours, 3 hours) excluding movement and preparation time, and each type provided a coefficient for dividing the area of the construction site into five types. The construction cost calculation method based on the construction purpose is site conditions is proposed accordingly, and it is deemed that a plan for the designer to calculate the construction cost has been prepared in consideration of the site conditions.

대용량 전력용변압기의 현장진단시험(3)

  • 류휘석
    • Electric Engineers Magazine
    • /
    • v.187 no.3
    • /
    • pp.42-49
    • /
    • 1998
  • 드문 경우이긴 하지만 설치 후 절연강도에 대한 전력용변압기의 운전 적합성을 판단하고 있다면 부분방전의 존재를 검출하기 위해 이 시험을 실시하는 경우가 있다. 이 시험은 보수나 수정작업이 실시된 변압기에 실시할 수도 있다. 일반적으로 유도전압시험은 대용량 초고압변압기에만 실시하는 것으로 알려져 있으나 모든 변압기에 실시할 수 있는 시험이다.

  • PDF