• Title/Summary/Keyword: 보수공법결정

Search Result 32, Processing Time 0.034 seconds

A Study on Development of the Concrete Pavement Condition Index (콘크리트 포장상태 평가지수의 개발에 관한 연구)

  • Kwon, Soo-Ahn;Kim, Nam-Ho;Seo, Young-Chan
    • International Journal of Highway Engineering
    • /
    • v.2 no.3
    • /
    • pp.145-153
    • /
    • 2000
  • Pavement evaluation is a fundamental component for rational pavement management. Optimal rehabilitation method and the priority of rehabilitation should be based on the evaluation data. Some types of pavement condition index are needed for objective evaluation of Pavement condition and management of road network. In this study a expressway concrete pavement condition index model is developed through regression analysis that correlates panel rating with distress measurement from the test sections. The derived condition index can be used for network level PMS for the expressway concrete pavement. Correlation coefficient of the model was 0.68. The selected independent variables were International Roughness Index, crack and area of patching.

  • PDF

Improvement of the Priority Index for Choice between Repair and Reinforcement Methods of Dam and River Facilities (댐·하천 시설물 보수·보강공법 선정을 위한 우선순위지수 산정식 개선방안 연구)

  • Kim, Dong Hyun;Youn, Hee Jung;Yoo, Hyung Ju;Lee, Seung Oh
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.234-234
    • /
    • 2021
  • 국내 기반시설의 대부분은 1970년대 경제성장기에 건설되어 사용연수가 30년 이상 경과하였고 급격한 고령화가 진행 중이다. 1990년대 성수대교와 삼풍백화점의 붕괴는 시설물 유지관리의 중요성에 대한 전국민적 관심을 집중시켰고, 이에 정부는 1995년 「시설물의 안전관리에 관한 특별법」 제정을 시작으로 현재까지 다양한 정책 및 기준을 수립해왔다. 일반적으로 안전점검 및 정밀안전진단 등을 수행하여 시설물의 안전등급을 평가하고 결함에 대한 보수·보강을 실시하여 시설물을 유지·관리하고 있다. 그러나 유지관리 예산은 한정적이기 때문에 모든 결함에 대한 보수·보강 사업을 실시할 수 없는 실정이다. 이에 보수·보강 조치의 우선순위를 선정하는 것이 필요하며, 관련 법령 세부지침에는 부재의 중요도, 결함의 심각성, 경제성을 고려한 우선순위지수(PI, Priority Index)를 제시하고 있다. 이 식은 전문가의 주관적인 판단에 의해 영향도를 50~100%범위 안에서 조정할 수 있으며, 일부 특정 부재는 동일한 가중치가 설정되어 있다. 또한 결정적으로 보수보강을 통한 효과를 효율적으로 고려하지 못하고, 대부분 경제성에 의해 우선순위가 결정되는 한계점이 발생한다. 따라서, 본 연구에서는 몇 가지 사례분석을 통해 현재 우선순위지수에 대한 문제점을 고찰하고 이를 개선할 수 있는 우선순위 산정식(PI)을 제시하였다. 과거 유지관리 시행 초기에는 보수보강 사례가 부족하였지만 현재는 수십년간의 축적된 자료를 바탕으로 제시된 산정식을 충분히 활용할 수 있을 것으로 판단된다. 향후 보수보강 효과를 정량화하는 방법에 대한 추가적인 연구가 수행된다면 더욱 경제적인 측면에서 우선순위를 산정할 수 있을 것이며 노후화된 기반시설 유지관리방안에 효과적으로 사용될 것으로 기대된다.

  • PDF

Comparison of Construction Cost Applied by RC and PC Construction Method for Apartment House and Establishment of OSC Economic Analysis Framework (공동주택 RC 및 PC공법 적용 공사비 비교 및 OSC의 포괄적 경제성 분석 프레임워크 구축)

  • Yun, Won-Gun;Bae, Byung-Yun;Kang, Tai-Kyung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.6
    • /
    • pp.30-42
    • /
    • 2022
  • OSC is a type of supply chain and value chain that spans the entire process of construction production (planning, design, construction, maintenance, etc.). It is a method of producing the final object by manufacturing it in a factory, transporting it to the site, installing and construction. This research as is the construction cost was compared for each case A, which applied the PC method, and case B, which applied the RC method. In the case of applying the PC method (excluding the PC design cost), compared to the case where only the RC method was applied, the frame construction cost per unit quantity (m3) increased by about 70% (50% based on the total RC construction type). Of the total frame construction cost of PC method application, PC accounted for 90.2%, 'PC manufacturing cost' 54.8%, 'PC assembly cost' 28.5%, and 'transportation cost' accounted for 6.89%. Also a decision-making framework that can consider both costs and benefits was established. In the case of benefits, the construction period, defect repair, disaster occurrence, energy efficiency, noise/dust/waste, and greenhouse gas emission indicators reflecting OSC technical advantages were presented. It can contribute to providing a basis for helping decision-making on the introduction of PC apartment houses using OSC.

A Research on the improvement scheme for manufacturing bronze warm forging die through environment-friendly workshop (황동제 온간단조용 금형제작과 환경친화형 작업장 개선에 관한 연구)

  • Kim, Sei-Hwan
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.11 no.2
    • /
    • pp.420-425
    • /
    • 2010
  • In the process of warm forging, billet is heated up to $800^{\circ}C$ and located in the upper part of die block impression. The scattered oxidized scale may cause workers burn and shortening of die life sticking to the die block impression. The separating materials sprayed in die block cause harmful dust, harmful mist, fume, and bad odor which contaminate workshop environment. The process is classified as one of the avoided jobs and make the planned output achievement difficult. Development of an elimination device to clear out the contaminating materials in the workshop and improvement of the unsatisfactory maintenance method to fix the abrasion of die block impression which delays the dead line, cost increases needs to be developed. In this research, I tried to solve the problems caused in warm forging of bronze pipe joint such as the billet heating process, die maintenance, and manufacturing cost through improvement of warming forging manufacturing method and die maintenance method and eliminating harmful gas which will make the workshop more environment friendly.

A Study on Improvement of Field Implementation of Asphalt Surface Reinforcement Method (아스팔트 표면 강화공법의 현장 적용성 개선 방안 연구)

  • Jo, Shin Haeng;Kim, Kyungnam;Kim, Nakseok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.2
    • /
    • pp.389-395
    • /
    • 2017
  • A study was carried out to improve the field implementation of asphalt surface reinforcement method which is a preventive maintenance. Mean Texture Depth (MTD) was measured to quantify the surface condition and used to determine the optimum application rate. Determining the application rate using MTD can reduce the material loss from 30% to 15%. In order to reduce the curing time to 30 minutes, the heat capacity of $317kcal/m^2$ is required. Therefore, the design capacity of the heating curing device requires more than 380,000 kcal/hr. The asphalt surface reinforcement method is preferably applied at a time when slight cracking occurs before the permanent deformation becomes serious. Through the analysis of the pavement survey data, it was decided to apply the surface reinforcement method at the crack rate of 3~4%. Heating the surface reinforcement agent to $50^{\circ}C$ improves workability and ensures sufficient penetration depth even at a crack width of 1 mm. The results will be utilized as basic data for the development of automated construction equipment for efficiency improvement.

Optimization of Municipal Pavement Management System(PMS) Components (Development of a Prototype PMS for Ansan City) (시도로 포장관리체계(PMS) 구성요소 최적화 연구 (안산시 Prototype PMS 개발사례))

  • Park, Sang-Kyu;Suh, Young-Chan
    • International Journal of Highway Engineering
    • /
    • v.2 no.4 s.6
    • /
    • pp.111-122
    • /
    • 2000
  • PMS(Pavement Management System) has been developed and/or operated for the freeway and national highway systems in Korea. There is, however, no municipal PMS that is necessary in many cities for efficient management of their roadways. In this study, a municipal Prototype PMS is developed. The Prototype PMS is designed to be operated on PC base. It uses GIS interface for user friendliness that applies color graphics, text and distress pictures to display pavement conditions and rehabilitation information for both current and historical situations. The computer program of the prototype PMS consists of four major functions(inquiry, analysis, data management, and print). Especially, prioritization and M&R(Maintenance and Rehabilitation) alternative selection procedure is designed to be flexible so that the users can modify the decision criteria whenever it is necessary. Database items of the Prototype PMS is carefully selected for the objectives and size of municipal PMS. Reference point method is basically used for the location referencing in the Database. The unit section consists of each loom segment of the road for effective management.

  • PDF

Evaluation of Applicability of HWAW (Harmonic Wavelet Analysis of Waves) Method in Determining Grouting Effect in Dam and Embankment (제체 그라우팅 효과 평가를 위한 HWAW방법의 적용성 평가)

  • Noh, Hee-Kwan;Park, Hyung-Choon
    • Journal of the Korean Geotechnical Society
    • /
    • v.32 no.5
    • /
    • pp.15-26
    • /
    • 2016
  • Dam and embankment are very important civil structures. Grouting is widely used to repair and maintain dam and embankment, and it is important to evaluate the effect of grouting for dam safety. The non-destructive method based on determination of wave velocity in the dam or embankment is effectively used to evaluate grouting effect because wave velocity is identical with stiffness and grouting increases local stiffness in a dam. In this paper, HWAW (Harmonic wavelet analysis of waves) method was applied to evaluate the grouting effect. HWAW method can determine two-dimensional shear wave velocity map with good spatial resolution and the shear velocity profile by the proposed method is sensitive to a variation of stiffness of target system. Through numerical simulation and field tests, the applicability of HWAW method in determining grouting effect is shown.

Asset Evaluation Method for Road Pavement Considering Life Cycle Cost (생애주기비용을 고려한 도로포장의 자산가치 평가에 대한 연구)

  • Do, Myungsik;Kim, Jeunghwan
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.1D
    • /
    • pp.63-72
    • /
    • 2009
  • This study aims at establishing the decision-making support system for the highway assets, long-term performance presumption and evaluation of asset value, which are appropriate for Korea, and proposing the methods of the optimal engineering method and the timing decision for the preventive maintenance through the project evaluation, the optimization method and life-cycle analysis related to the highways. In order to supplement the current problem of the near-sighted budget management system, which chooses the maintenance place of the highway, depending on the level of the budget with fixed amount, the long-term required budget prediction system and the economy principle were introduced, so that the pavement agency can predict the level of the required budget, and it was aimed to develop the pavement asset evaluation system to maintain the performance of the highway with the minimum of the cost. In the use of the highway pavement asset evaluation system, to maintain the appropriate level of the pavement evaluation index, when the budget was efficiently established in the reference of the required maintenance budget for the chosen section of the highway in the year concerned, it was possible to analyze the most rational pavement maintenance budget. With this result, it is estimated to prevent the unnecessary waste of budget in advance, and through the development of the decision-making system for the long-term performance presumption and the asset value estimation of the pavement, it is expected to able to analyze the previous evaluation of the project related to the highway and the feasibility of introduction.

FEA and Model test of Backfill Materials for Underground Facility with Recycling Materials (재활용 재료를 이용한 지하 매설물용 뒤채움재의 모형시험 및 유한요소해석)

  • Lee, Kwan Ho;Kim, Sung Kyum
    • 한국방재학회:학술대회논문집
    • /
    • 2011.02a
    • /
    • pp.177-177
    • /
    • 2011
  • 현재 대부분 사용되는 지하매설물용 뒤채움재는 다짐공법을 많이 사용하고 있으며, 실제로 이러한 방법은 부적절한 다짐으로 인해 침하 및 내구성 저하로 인해 파손을 초래하는 경우가 많다. 이러한 문제를 해결 할 수 있는 하나의 대안으로 유동성 뒤채움재를 이용할 수 있다. 유동성 뒤채움재는 초기 유동성, 시간에 따른 자기 강도 발현 무다짐공법 적용 등 많은 장점을 가지고 있다. 본 연구에서는 현장발생토사, 정수장슬러지 및 폐타이어분말 등 재활용 재료를 이용한 유동성 뒤채움재의 기본물성을 평가하였다. 각각의 재활용재료에 대한 입도 및 비중을 평가하였고, 최적배합설계를 결정하였으며, 모형 시험과 유한요소 해석을 위한 기본 물성값을 위해 일축압축시험, 삼축압축시험, 공진주시험 등을 수행하였다. 최적배합설계를 산정하는 과정에서 수행한 실험중 대표적인 시험으로 자가수평능력 및 자기다짐등에 필요한 유동성을 판단하는 Flow시험(ASTM D 6133) 결과 기준으로 정한 20cm이상의 값을 얻을 수 있었으며 일축압축강도의 경우 시공 후 유지 보수가 용이한 강도인 $3.0kg/cm^2{\sim}5.6kg/cm^2$이하로 설계하였으며 28일재령 일축압축강도 결과 $3.15{\sim}3.74kg/cm^2$라는 유지보수에 적당한 결과값을 나타내었다. 이 배합이 현장에서 사용이 가능하다는 것으로 판단하고 현장모형시험과 유한요소해석를 통하여 현장에서 사용하였을 때 관의 변형과 관에 작용하는 하중변화를 확인하고 현장모형시험과 유한요소해석 간의 상관관계를 규명하였다. 현장 모형 시험은 현장과 비슷하게 제작된 모형을 이용하였으며 최대한 현장과 비슷한 조건에서 뒤채움재를 타설과정 중과 타설이 완료된 상태에서 7일 양생 후 하중재하와 같이 두가지 경우에서 수직 수평토압, 관의 수직 수평변위, 관의 종단변형을 측정하였다. 유한요소해석 프로그램은 Midas GTS를 이용하여 실시하였으며 관의 변형률, 유효응력을 측정하여 규명하였다.

  • PDF

Review of the Priority Index for Selection between Repair and Reinforcement Methods of Dam Facilities (댐 시설물 보수·보강공법 선정을 위한 우선순위지수에 대한 고찰 )

  • Dong Hyun Kim;Hyung Jun Park;Hee Jung Youn;Seung Oh Lee
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.27 no.3
    • /
    • pp.1-11
    • /
    • 2023
  • After the collapse of the Seongsu Bridge in the 1990s in Korea, attention was focused on the maintenance of facilities. The government has established various policies since the enactment of the Act in 1995 until recently. In general, safety inspections are performed to evaluate the safety grade of facilities, and facilities are maintained and managed by performing repairs and reinforcements for defects. However, since the budget is limited, it is impossible to carry out repair and reinforcement projects for all defects. It is necessary to prioritize repair and reinforcement measures. Then, the priority index (PI) is presented considering the importance of members, the seriousness of defects, and economic feasibility. In this index, the degree of influence can be adjusted within the range of 50 to 100% according to the expert's subjective judgment, and the same weight is set for some specific members. Also, the effect through repair and reinforcement is not taken into account decisively, and most of them have a limit in which priority is determined by economic feasibility. Therefore, in this study, through several case studies, problems with the priority index were reviewed and an equation was presented to improve them.