• Title/Summary/Keyword: 배관재

Search Result 201, Processing Time 0.026 seconds

Performance Test and Calculation of Recirculation Line in Propellant Feeding System (기체공급계 재순환배관의 성능시험 및 계산)

  • Kwon, Oh-Sung;Cho, Nam-Kyung;Chung, Yong-Gahp;Han, Sang-Yeop;Kim, Young-Mog
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.11 no.2
    • /
    • pp.9-17
    • /
    • 2007
  • The performance test of recirculation line in propellant feeding system was carried out. Liquid oxygen was used as cryogenic propellant and helium was used as recirculation promotion gas. Tests were done in cases at atmospheric pressure and at pressure of 4 barg in the ullage space of propellant tank. Liquid oxygen recirculation flowrate with helium injection flowrate and temperature distribution along the line were measured. There was appropriate helium injection flowrate for gas-lift recirculation system. Test data were used to make calculation program by test data correlation method. In this paper the procedure of calculation was presented and the results were compared to test data.

감육위치와 굽힘반경의 변화에 따른 감육엘보우의 손상 거동

  • 김태순;박치용;박재학
    • Proceedings of the Korean Institute of Industrial Safety Conference
    • /
    • 2003.05a
    • /
    • pp.345-353
    • /
    • 2003
  • 탄소강은 가공성과 용접성이 우수하기 때문에 각종 산업설비의 배관재로 많이 사용되고 있으며, 특히 가압중수로형 원전의 1차측 배관과 가압경수로형 원전의 2차측 배관에 주로 사용되고 있다. 그러나 탄소강 배관은 부식에 취약하므로 유동가속부식(FAC, Flow Accelerated Corrosion) 현상에 의한 배관의 두께가 감소하는 감육 손상이 중요하게 대두되고 있는 실정이다. 이러한 감육현상은 다른 어떤 설비보다 안전성의 확보가 강조되고 있는 원전 배관의 경우에 있어서는 특히 중요한 건전성 저해요인으로 인식되고 있다.(중략)

  • PDF

A Study on the Installation Readiness Management Method of Offshore Plant using CAD Information (CAD 정보를 활용한 해양 배관재 설치 준비율 관리 방법에 관한 연구)

  • Park, JungGoo;Kim, HoJung;Kim, MinGyu;Park, JiChan
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.56 no.2
    • /
    • pp.152-160
    • /
    • 2019
  • In this study, we propose a piping material supply management method using CAD system. The piping materials installed in super large offshore plants have very complicated connection conditions. Therefore, it is very difficult to determine the order of receipt of a large number of installation materials. Therefore, we have developed a system that can automatically check the preparation rate of installation materials prior to the installation process. We have developed an algorithm to obtain connection information among installation items from PDMS system. We have developed an algorithm that can determine the order of installation materials to be installed using the connection information. The order of the installation material is determined by taking into account the constraint conditions for the complete installation of the piping material. We confirm the effectiveness of the developed algorithms in the operating system. This system is also used to manage installation schedules and plan the installation manpower.

A Computer Programme Development for Thermal-Hydraulic Analysis and Optimal Design on LNG Pipeline System (LMG 배관시스템의 열유동 해석 및 최적설계 프로그램 개발)

  • Lee Sanggyu;Hong Seong-Ho;Lee Joong-Nam;Park Seok-Ho
    • Journal of the Korean Institute of Gas
    • /
    • v.4 no.2 s.10
    • /
    • pp.7-14
    • /
    • 2000
  • LNG (Liquified Natural Gas) carried by LNG ship is unloaded into the LNG storage tanks at the very low temperature (a little lower than the boiling point of LNG). Because LNG is unloaded through the pipeline, two phase flow appears in the pipeline. In this study, we have studied the pressure-drop mechanisms of the two-phase flow in the pipeline, and the calculation method of BOG (Boil-off Gas) amount based on the heat transfer mechanism through the insulation and the surface of the pipeline. We have developed a computer program for thermal-hydraulic analysis on the LNG pipeline system. We have also developed the optimal design program to find the optimal thickness of insulation and the pipeline size. The program searches the optimal design with the minimum capital cost of pipelines and insulation on the operating conditions of maximum allowance pressure-drop and BOG amount, etc.

  • PDF

Evaluation of the Reaction-to-fire Performance of Pipe Insulation Material using Small Room Test (룸코너 시험을 이용한 배관용 보온재의 난연성능 분석)

  • Lim, Ohk Kun;Nam, Dong-gun;Jang, Hyo-Yeon
    • Fire Science and Engineering
    • /
    • v.33 no.4
    • /
    • pp.1-8
    • /
    • 2019
  • Reaction-to-fire performance of pipe insulation materials should be approved in accordance with KS standards prior to installing water-based suppression systems because several fire accidents are initiated from insulation materials around ceilings or concealed space. A small room test to evaluate the reaction-to-fire performance of the polyethylene foam and elastomeric pipe insulation materials was conducted according to ISO 20632. Different fire growth rate and heat release rate are observed depending on the materials and construction methods. In order to improve a fire safety, the reaction-to-fire performance of pipe insulation material needs to be subdivided with regard to the heat release rate and smoke generation. Furthermore, the characteristics of the applying space are also required to be considered. Subsidiary materials for installation process such as tape and adhesive are found to provide an adverse effect to maintain a fire safety.