A Study on the Application of Ground Displacement Sensor by Rock Blasting Test (암반 발파시험을 통한 지중변위센서의 적용성 연구)

  • Lee, Seungjoo;Jeong, Woocheol;Lee, Eungbeom;Suk, Songhee;Lee, Kangil;Kim, Yongseong
    • Journal of the Korean Geosynthetics Society
    • /
    • v.21 no.3
    • /
    • pp.71-78
    • /
    • 2022
  • In this study, the applicability of underground displacement sensors was considered through rock blasting tests to develop a relatively inexpensive and efficient slope failure prediction system that can quickly detect the risk of slope failure in advance and issue predictions and warnings with accurate judgment. In the blasting experiment, the sensor located close to the blasting source showed a large displacement due to crushing inside the rock and the sensor located away from the blasting source showed a relatively small strain. This study confirmed that the wired and wireless type underground displacement sensor system can be applied to measure the behavior of the rock slope, and it can be used as a basic data for establishing an early warning system to predict slope failure.

A Study on Experimental and Numerical Analysis for Behavior of Multi-layerd Pipeline Subjected to Blasting Vibration (지중 다중 관의 발파 진동 특성 분석을 위한 실험 및 수치해석적 연구)

  • Kim, Moon-Kyum;Won, Jong-Hwa;Noh, Gi-Seok;Cho, Seok-Ho;Kim, Kyung-Min
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.417-420
    • /
    • 2010
  • 지중매설관은 경우에 따라 긴 수송거리를 보이기 때문에 부식 및 충격에 의한 파손 등에 대한 모니터링이 어려운 실정이다. 이러한 조건을 극복하기 위하여 복합관 및 다중관을 설치하고 있으나, 이에 대한 연구는 아직 미비한 실정이다. 본 연구에서는 발파진동원에서 고정된 이격거리, 매설심도에서 배관 상단에 특정 진동속도를 발생시키는 발파 하중을 고려하여, 이격거리에 대한 수치해석을 수행하였으며 장약량에 따른 이격거리와 발파효율을 측정하였다. 실험값과 수치해석 값의 오차는 발파지점에서 가까울수록 크게 나타났으며 발파지점과 마주보는 방향이 반대방향보다 크게 나타났다.

  • PDF

Analysis and Evaluation of the Effect of Blast-induced Vibration Adjacent to Industrial Facilities (산업시설 근접발파 시 발파진동 영향 분석 및 평가)

  • Kawk, Chang Won;Park, Inn Joon;Kim, Young Jun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.4
    • /
    • pp.459-468
    • /
    • 2023
  • Power plant is a kind of basic industrial facility and might cause fatal industrial and human damage. In this study, the characteristics and effect of blast-induced vibration for tunnelling which underpass ○○ power plant in operation were evaluated. Previous blasting cases adjacent to industrial facilities were intensively reviewed, then allowable vibration criteria were suggested. 3 dimensional dynamic numerical analysis based on finite element method was performed to investigate particle velocity and resonance was examined by calculating the predominant frequencies. As a result, particle velocity at pump foundation which is nearest to the source was approached to the allowable criteria, therefore, the modified blasting pattern was newly suggested and confirmed the attenuation effect based on the test blasting. Consequently, appropriated decision-support procedure was established in case of adjacent blasting to industrial facilities.

Study on Blast Effects of Decoupling Condition and Polymer Gel Coupling in Single Blast Hole by Numerical Analysis (디커플링 조건 및 폴리머 겔 적용에 따른 발파공 발파위력 영향에 관한 수치해석 연구)

  • Ko, Young-Hun;Jung, Seung-Won;Yang, Hyung-Sik
    • Explosives and Blasting
    • /
    • v.36 no.2
    • /
    • pp.1-9
    • /
    • 2018
  • In this paper, AUTODYN blasting simulation of single blast hole were conducted to evaluate the blasting effects of Polymer Gel. The coupling mediums used as the filling material around an explosive charge were air and gelatin. each simulation case was D I(decoupling index) 1.0, 1.25, 1.56 with air or polymer gel coupling materials. In order to evaluate blast effects full charge model was used as a reference for evaluation of blasting effects. The results of numerical analysis showed that fragmentation of a limestone model of were much more fractured by polymer gel medium than by air medium. As expected, the transmitted peak pressure was higher polymer gel coupled model than in air medium.

A example study on monitoring near field vibration in the rock mass adjacent blast hole (발파공 주변의 인접거리 진동계측 사례연구)

  • Lee, Hyo;Won, Yeon-Ho;Kim, Jin-Soo;Ju, Young-Og
    • Proceedings of the KSEE Conference
    • /
    • 2006.10a
    • /
    • pp.153-166
    • /
    • 2006
  • 종래의 발파진동의 분석은 주로 대상 지장물에 대한 피해한계를 정립시키고자 하는 관점에서 발파공에서 비교적 원거리의 진동특성을 이해하기 위해 수행되어져 왔으나, 최근의 추이는 발파공 주변 암반의 손상의 정도를 평가하고자 하는 관점에서 그 분석영역의 범위가 근거리 진동특성 연구분야로 확대되고 있는 실정이다. 특히, 터널 발파작업시 여굴의 발생, 암반사면의 안정성 검토 등의 목적으로 암반의 손상영역을 평가하는데 있어서, 기초자료로 활용하고자 많은 연구가 이루어지고 있다. 암반손상의 평가를 위한 손상권 예측방법에는 여러 가지가 있으나, 그 중에서 대부분이 발파진동속도에 근거하고 있으며, 평가를 위한 진동의 예측은 기존에는 원거리 진동특성을 이용하여 근거리 진동을 예측하는 방법으로 그 손상의 정도를 평가하였으나, 최근의 추세는 계측기의 발달로 수m 이내의 진동특성의 계측이 가능하게 되었다. 이와 관련하여 국외에서는 수차례의 실험결과가 여러 문헌에서 보고되고 있으나, 실험장비의 선택 및 측정방법의 어려움 등의 연유로 국내에서는 아직까지 실시되지 못하고 있는 상황이다. 따라서, 본 연구에서는 실제 발파공 근접진동(near field vibration) 계측을 실시하고 그 결과를 분석하여 추후 지속적인 근거리 진동측정 방법 및 평가방법에 대한 기초자료를 제공하고자 하였으며, 무엇보다도 어떻게 계측할 것인가 하는 계측방법 및 그 계측결과의 분석방법에 대해 문제점 파악 및 향후 보완점에 대해 비중을 두어 수행하였다.

  • PDF

A Study on the Installation Time and Method of Soundproofing Facilities According to Tunnel Blasting Work (터널발파작업에 따른 방음시설의 설치시기와 방법에 대한 고찰)

  • Won, Yeon-Ho;Son, Young-Bok;Jeong, Jai-Hyung
    • Explosives and Blasting
    • /
    • v.25 no.1
    • /
    • pp.1-14
    • /
    • 2007
  • A blasting noise generated by blasting work, which is a kind of shock-noise, influences the human body. A civil appeal due to blasting noise causes work discontinuance and downsizing of a blasting scale. Most of soundproof facilities for reducing a blasting noise is installed at each working spot by itself and the degree of a noise reduction is very low. The aim of this study is to recommend a technology on noise reduction considering the method and material of soundproof facilities. As the first study step to acquire basic data, investigations on the installation time, installation method, and material of the soundproof facilities have been done at about 20 tunnel work spots such as railroad tunnel, road tunnel, tunnel for electric power.